PRESENTATION
PRESENTATION ON :-
IRIS : International Railway Industry Standard
ISO/TS 22163:2017
PRESENTATION BY :
Anoop Tripathi
Sakhi Management Consulting Pvt. Ltd.
FF-121, Beta Tower, Secotr-3, Vasundhra-
201012
Ph: +91-120-4132807
E: [email protected]
wwww.isoconsultants.in,
[email protected]
IRIS
IRIS : INTERNATIONAL RAILWAY
INDUSTRIES STANDARD
A Business Management Standard for
Railway Industries
wwww.isoconsultants.in,
[email protected]
AGENDA
⮚What is IRIS
⮚IRIS Background
⮚Objective /AIM
⮚Unique to IRIS
⮚Standard and its Requirements
⮚Revision History
⮚Certification Process
⮚IRIS Scoring Methodology
⮚Types of Questions
⮚Benefits
⮚Registration on IRIS
⮚Readiness of Audit
⮚Additional Requirements
⮚Benefits
wwww.isoconsultants.in,
[email protected]
WHAT IS IRIS
❖An international standards with the
business management system requirements
for the rail sector
❖Initiative led by : UNIFE (Union des Industries
Ferroviaires Européennes)
Union of the European Railway Industries (UNIF
E)
:
❖Four key players:
❑Bombardier,
❑Siemens,
wwww.isoconsultants.in,
❑Alstom and [email protected]
IRIS COMMITTEE MEMBERS
wwww.isoconsultants.in,
[email protected]
Why IRIS
⮚ Quality problems in Rolling Stock
⮚ Multiple Audits
⮚ Multiple requirements
⮚ High cost in supply chain
⮚ Supplier Assessment /Selection problems
Operators requested rationalization and some
reliable tool.
⮚ It lead to formation of standard specific to rail
industry
wwww.isoconsultants.in,
[email protected] Aim of IRIS
• To prepare railway specific standard
• Common global system
•One harmonized evaluation process to be
performed by approved certification
bodies.
•A web-based IRIS Portal (common
database) and Audit-Tool (software
wwww.isoconsultants.in,
[email protected]
Objective of IRIS
To Improve :
•Quality
•Safety
•Reliability
•Prevent defect
•Reduce cost
Throughout the supply chain
wwww.isoconsultants.in,
[email protected] Content of IRIS
•Business management system Requirements
•A questionnaire derived from standard
•An evaluation process with assessment
guidelines
•A web based IRIS portal( Database) and audit
tools(Software tools)
wwww.isoconsultants.in,
[email protected]
Applicability
It can be applied to:
•Manufacturer of rail mounted vehicles
•Direct ancillary industries
•Indirect ancillary industries
of
•System construction part and Individual
components
•Operator
wwww.isoconsultants.in,
[email protected]
Standard development body
✔ The development of the standard is transparent
and involve all market participants via UNIFE.
✔ The standard is owned and managed by UNIFE
(ensure independency).
✔ Audit results are traced confidentially and
published only with allowance of the Audit Client.
✔ Rules for protection of data privacy will be
followed.
✔ Approval of certification bodies is fair and
transparent.
wwww.isoconsultants.in,
[email protected]Standard requirements
⮚Rev 01 Nov 2007
⮚Rev 02 2009
⮚ISO /TS 22163:2017
⮚Compatible to ISO 9001:2015 and ISO 9004:2009
⮚Stronger maturity level
wwww.isoconsultants.in,
[email protected]
Standard requirements
Is based on the ISO 9001 Structure.
IRIS adds a layer, which contains railway specific
requirements for the Business Management System,
e.g.
Project Management,
Design, etc…
IRIS contains:
Mandatory requirements with «Shall» wording.
Optional requirements with «Should» wording.
Some requirementswwww.isoconsultants.in,
are “KnockOut” criteria.Rev
[email protected]Standard requirements
0. Foreword 5. Leadership
1. Scope 5.1 Leadership and commitment
2. Normative Reference 5.2 Policy
3. Terms and Definitions 5.3 Organization roles and
4. Context of Organization responsibilities
4.1 Understanding the 6. Planning
organization context 6.1 Action to address risk and
4.2 Understanding the need and opportunities
expectation of interested parties 6.2 Quality objective and
4.3 Determining the scope of planning to achieve them
Quality Management system 6.3 Planning of change
4.4 Quality management system 6.4 Business Planning
and its process
wwww.isoconsultants.in,
[email protected]
Standard requirements
7. Support 8.6 Release of products and services
7.1 Recourses 8.7 Control of nonconforming outputs
7.2 Competence 8.8 RAMS / LCC
7.3 Awareness 8.9 First article inspection
7.4 Communication 8.10 Obsolescence management
7.5 Documented information 8.11 Innovation management
8. Operations 9. Performance evaluation.
8.1 Operational Planning and control 9.1 Monitoring, measurement, analysis
8.2 Requirements for product & and evaluation
Services 9.2 Internal audit
8.3 Design & Development of 9.3 Management review.
Production Services 9.4 Process reviews
8.4 control of externally provided 10. Improvement
processes, products and services 10.1 General
8.5 Production and service provision 10.2 Nonconformity and corrective
action
10.3 Continual improvement
wwww.isoconsultants.in,
[email protected]
Schematic representation of the
elements of a single process
wwww.isoconsultants.in,
[email protected]
PDCA CYCLE
wwww.isoconsultants.in,
[email protected]
SCOPE
1 Scope
This International Standard specifies requirements for a
quality management system when an organization:
a) Needs to demonstrate its ability to consistently provide
products and services that meet customer and applicable
statutory and regulatory requirements, and
b) Aims to enhance customer satisfaction through the effective
application of the system, including processes for improvement
of the system and the assurance of conformity to customer and
applicable statutory and regulatory requirements.
wwww.isoconsultants.in,
[email protected]
Normative References
2. Normative references
The following documents, in whole or in part, are
normatively referenced in this document and are
indispensable for its application. For dated references, only
the edition cited applies. For undated references, the latest
edition of the referenced document (including any
amendments) applies.
wwww.isoconsultants.in,
[email protected]
Terms and Definitions
3 Terms and definitions
For the purposes of this document, the terms and
definitions given in ISO 9000:2015 apply.
3.1 Terms and definitions for the rail sector
3.1.1 application software
3.1.2 availability
3.1.3 commissioning
3.1.4 component
3.1.5 configuration audit
3.1.6 configuration baseline
3.1.7 configuration status accounting
3.1.8 consignment stock
3.1.9 critical critically
3.1.10 deferred work wwww.isoconsultants.in,
[email protected] Terms and Definitions
3.1.11 deliverables
3.1.12 first article inspection
3.1.13 Failure Reporting Analysis and Corrective Action
System
3.1.14 functional requirement
3.1.15 gate criteria
3.1.16 handover
3.1.17 installation
3.1.18 integration maturity
3.1.19 integration requirements
3.1.20 key performance indicator
3.1.21 life cycle costing
3.1.22 maintainability
3.1.23 maintenance
3.1.24 manufacturing
wwww.isoconsultants.in,
[email protected] Terms and Definitions
3.1.25 multidisciplinary approach
3.1.26 non-functional requirements
3.1.27 operational maturity
3.1.28 product configuration information
3.1.29 product life cycle
3.1.30 product equipment
3.1.31 project core team
3.1.32 project management
3.1.33 quality assurance methods
3.1.34 quality deficiency cost
3.1.35 reliability
3.1.36 safety
3.1.37 safety case
3.1.38 safety integrity level
3.1.39 safety-related
wwww.isoconsultants.in,
[email protected] Terms and Definitions
3.1.40 site
3.1.41 supply chain
3.1.42 transfer
3.2 Abbreviations
wwww.isoconsultants.in,
[email protected]
CONTEXT OF THE ORGANIZATION
4. Context of the organization
4.1 Understanding the organization and its context
The organization shall determine external and internal
issues that are relevant to its purpose and its strategic
direction and that affect its ability to achieve the intended
result(s) of its quality management system.
4.2 Understanding the needs and expectations of
interested parties
Due to their effect or potential effect on the organization’s
ability to consistently provide products and services that
meet customer and applicable statutory and regulatory
requirements, the organization shall determine:
wwww.isoconsultants.in,
[email protected]
CONTEXT OF THE ORGANIZATION
4.3 Determining the scope of the quality
management system
The organization shall determine the boundaries and
applicability of the quality management system to establish its
scope.
When determining this scope, the organization shall consider:
1. the external and internal issues referred to in 4.1;
2. the requirements of relevant interested parties referred to in
4.2;
3. the products and services of the organization.
wwww.isoconsultants.in,
[email protected]
CONTEXT OF THE ORGANIZATION
4.4 Quality management system and its
processes
4.4.1 The organization shall establish, implement,
maintain and continually improve a quality
management system, including the processes needed
and their interactions, in accordance with the
requirements of this International Standard.
4.4.2 To the extent necessary, the organization shall:
a. Maintain documented information to support the
operation of its processes;
b. retain documented information to have confidence
that the processes are being carried out as planned.
4.4.3 Quality management system and its
processes
wwww.isoconsultants.in,
[email protected] LEADERSHIP
5 Leadership
5.1 Leadership and commitment
5.1.1 General
5.1.2 Customer focus
5.2 Policy
5.2.1 Establishing the quality policy
a) is appropriate to the purpose and context of the
organization and supports its strategic direction;
b) provides a framework for setting quality objectives;
c) includes a commitment to satisfy applicable requirements;
d) includes a commitment to continual improvement of the
quality management system.
wwww.isoconsultants.in,
[email protected] LEADERSHIP
5.2.2 Communicating the quality policy
a) be available and be maintained as documented
information;
b) be communicated, understood and applied within
the organization;
c) be available to relevant interested parties, as
appropriate.
5.2.3 Quality policy
5.2.4 Safety policy
wwww.isoconsultants.in,
[email protected]
LEADERSHIP
5.3 Organizational roles, responsibilities
and authorities
Top management shall ensure that the
responsibilities and authorities for relevant roles
are assigned, communicated and understood
within the organization.
5.3.1 Organizational roles, responsibilities
and authorities
5.3.2 Responsibilities and authorities of
process owners
wwww.isoconsultants.in,
[email protected]
PLANNING
6 Planning
6.1 Actions to address risks and opportunities
6.2 Quality objectives and planning to achieve them
6.3 Planning of changes
6.4 Business planning
wwww.isoconsultants.in,
[email protected]
SUPPORT
7 Support
7.1 Resources
7.1.1 General
7.1.2 People
7.1.3 Infrastructure
7.1.4 Environment for the operation of processes
7.1.5 Monitoring and measuring resources
7.1.6 Organizational knowledge
wwww.isoconsultants.in,
[email protected] SUPPORT
7.2 Competence
7.3 Awareness
7.4 Communication
7.5 Documented information
7.5.1 General
7.5.2 Creating and updating
7.5.3 Control of documented information
wwww.isoconsultants.in,
[email protected]
OPERATION
8 Operation
8.1 Operational planning and control
8.1.1 Planning for the outsourcing or transfer of
processes
8.1.2 Tender management
8.1.3 Project management
8.1.4 Configuration management
8.1.5 Change management
8.2 Requirements for products and services
8.2.1 Customer communication
8.2.2 Determining the requirements related to
products and services
8.2.3 Review of requirements related to products
and services
wwww.isoconsultants.in,
[email protected] OPERATION
8.2.4 Changes to requirements for products and
services
8.2.5 Requirements for products and services
8.3 Design and development of products and
services
8.3.1 General
8.3.2 Design and development planning
8.3.3 Design and development inputs
8.3.4 Design and development controls
8.3.5 Design and development outputs
8.3.6 Design and development changes
8.4 Control of externally provided processes,
products and services
wwww.isoconsultants.in,
[email protected] OPERATION
8.4.1 General
8.4.2 Type and extent of control
8.4.3 Information for external providers
8.4.4 Supply chain management
8.5 Production and service provision
8.5.1 Control of production and service provision
8.5.2 Identification and traceability
8.5.3 Property belonging to customers or external
providers
8.5.4 Preservation
8.5.5 Post-delivery activities
8.5.6 Control of changes
wwww.isoconsultants.in,
[email protected]
OPERATION
8.5.7 Production scheduling
8.6 Release of products and services
8.6.1 Release of products and services
8.7 Control of nonconforming outputs
8.8 RAMS / LCC
8.9 First article inspection
8.10 Obsolescence management
8.11 Innovation management
wwww.isoconsultants.in,
[email protected]
PERFORMANCE EVALUATION
9 Performance evaluation
9.1 Monitoring, measurement, analysis and
evaluation
9.1.1 General
9.1.2 Customer satisfaction
9.1.3 Analysis and evaluation
9.2 Internal audit
9.3 Management review
9.4 Process reviews
wwww.isoconsultants.in,
[email protected]
IMPROVEMENT
10 Improvement
10.1 General
10.2 Nonconformity and corrective action
10.3 Continual improvement
wwww.isoconsultants.in,
[email protected]
IRIS SCORING METHODOLOGY
Audit results are scored, its not a fail/pass system
⮚Questionnaire has 253 questions :
⮚111 questions relative to ISO Requirements
⮚ 142 questions relative to IRIS Requirements
⮚ 10 K.O. questions, not scored, fulfillment
mandatory
⮚ 32 Closed questions
⮚ Yes/No question
⮚ 211 Open questions
wwww.isoconsultants.in,
[email protected]CERTIFICATION PROCESS
⮚Preparation and request for IRIS certification
⮚Evaluation Process
⮚Readiness review
⮚Certification audit
✔Scoring Methodologies
✔Scoring principles
✔Knock out questions
✔Open questions
✔Closed questions
✔Corrective or improvement program
.
wwww.isoconsultants.in,
[email protected]
BENEFITS OF IRIS
⮚Improved product quality & supply
chain efficiency.
⮚Reduction of effort and cost.
⮚ More accurate and reliable
Information about suppliers to the
railway industry.
⮚ Fair evaluation by independent
certification bodies.
wwww.isoconsultants.in,
[email protected]Why Registration On IRIS PORTAL
❖To get details about IRIS
❖To purchase audit tools
❖Choose CB
❖Be ready for IRIS audit
wwww.isoconsultants.in,
[email protected]
Readiness Audit
✔Business Management Manual
✔Quality Policy
✔Org chart
✔Mandatory procedures
✔Mandatory processes
✔KPI
✔Preachment kinked to mandatory requirements
✔Site specific conditions
✔Scope verification
✔Resource allocation
✔Audit planning
✔Site location
✔If knock out requirements are not meted than re audit is
done
wwww.isoconsultants.in,
[email protected]
Additional Requirements
✔ The development of the standard is transparent
and involve all market participants via UNIFE.
✔ The standard is owned and managed by UNIFE
(ensure independency).
✔ Audit results are traced confidentially and
published only with allowance of the Audit Client.
✔ Rules for protection of data privacy will be
followed.
✔ Approval of certification bodies is fair and
transparent.
wwww.isoconsultants.in,
[email protected]
Additional Requirements
Knowledge management Communication management
Management of multi sites Risk and opportunity
projects management
Requirements management Change management
Competences, awareness First article inspection
and Configuration management
training Outsourcing (Make or Buy)
Infrastructure management Supply chain management
Tender management Commissioning / Customer
Integration management service
Scope management RAMS / LCC
Time management Control of nonconforming
Cost management processes
wwww.isoconsultants.in,
[email protected]
Mandatory processes for evaluation
5 mandatory process for performance evaluation
a) Project management 8.1.3
b) requirement management 8.2
c) EPPS/purchase 8.4
d) design and development 8.3
e) production and service provision 8.5
wwww.isoconsultants.in,
[email protected]
KO-Knockout process
Clause
Sl No Clause
1 6.1.3.1 Risk management process
Competence management activity
2 7.2.1.3
Project Management
3 8.1.3
4 8.1.4 Configuration Management
5 8.1.5 Change Management
requirements of product and services
supplimentals
6 8.2.5.1
Externally provided processes,
product & Service
7 8.4.1.1.2
Special process
8 8.5.1.2.1
9 8.8.1 RAM/LCC
10 8.9.1 FAI
wwww.isoconsultants.in,
[email protected] Scoring Methods
Sl Level Score Conditions
No
1 Optimize 4 The requirements is exceeded
d and continuously improved
2 Qualified 3 The requirements is exceeded
3 Defined 2 The requirements is met
4 Poor 1 The requirements partially met
5 Insuffecis 0 The requirements not met
nt
wwww.isoconsultants.in,
[email protected]
Closed questions:
Scoring Methods
1 Yes 2 The requirements is
met
2 No 0 The requirements not
met
wwww.isoconsultants.in,
[email protected]
Annex-01 of standard
Certification Body may only carry out audits
in the areas of the particular railway
equipment in which its Auditors are approved.
1 Car body
2 Car body fittings
3 Guidance (Bogies and running gear)
4 Power System
5 Propulsion
6 Auxiliary systems
7 Braking System
8 Interiors
9 On board vehicle control
wwww.isoconsultants.in,
[email protected] Additional Requirements
10 Passenger Information Systems
11 Communication systems
12 Cabling and Cabinets
13 Door System
14 HVAC
15 Tilt System
16 Lighting
17 Coupler
wwww.isoconsultants.in,
[email protected]
Benefits
⮚One demanding International recognized Standard
for the Railway Industry.
⮚Reduction of non conformity costs due to suppliers
deficiencies
IRIS will support the manufacturers and the
suppliers in improving their process quality
continuously.
⮚Reduction of non conformity costs due to suppliers
deficiencies
⮚Increase the number of approved suppliers
=> whilst stopping of audits performed by internal
wwww.isoconsultants.in,
resources..
[email protected] Benefits
Qualification Method
0: Poor
1: Insufficient
2: Defined- two type- open and closed yes/no if yes-2, if No-0,
3. Qualified
4: Optimized
wwww.isoconsultants.in,
[email protected]
IRIS benefits
⮚Reduction of efforts in terms of time and expenses
for approving suppliers
=> Thus enhance focus on supplier performance
and on specific product requirements.
⮚Reduction of costs for maintaining the “approved
supplier lists” in ERP systems.
=> They will become obsolete. In future, the data will
be maintained on one common IRIS web database.
⮚Improvement of Quality of Equipments & Rolling
Stock
wwww.isoconsultants.in,
[email protected]
wwww.isoconsultants.in,
[email protected]