The document outlines the tank cleaning procedure for the New Tank Project Phase-I, detailing steps such as water draining, scaffolding installation, and inside cleaning using high-pressure jets. It includes inspection items for surface appearance checks and oil spray coating, with a clear sequence of operations for multiple tanks of varying capacities. The process emphasizes the importance of thorough cleaning and inspection before finalizing the project.

Uploaded by

saksanps2519
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views3 pages

Tank Cleaning Procedure Phase-I Guide

The document outlines the tank cleaning procedure for the New Tank Project Phase-I, detailing steps such as water draining, scaffolding installation, and inside cleaning using high-pressure jets. It includes inspection items for surface appearance checks and oil spray coating, with a clear sequence of operations for multiple tanks of varying capacities. The process emphasizes the importance of thorough cleaning and inspection before finalizing the project.

Uploaded by

saksanps2519
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

NEW TANK PROJECT : PHASE-I

TANK CLEANING PROCEDURE

1. Water Draining

2. Scaffolding Installation

3. Inside Cleaning
By High Pressure Jet

1
4. Dry-up by Instrument Air
Inspection Item :
- Surface Appearance Check
- Accept by APT 1
No
Inspection

Yes

5. Oil Spray Coating


Inspection Item :
- Surface Appearance Check
- Accept by APT 1
Inspection No

Yes

Finish
NEW TANK PROJECT : PHASE-I
Water Draining

Step-1 Step-2

Filter Drum Filter Drum

No No
Manhole Manhole
3" LT Conn 3" LT Conn
Test Yes Yes Test
Sampling Sampling
2" Drain Pump 2" Drain
Gutter Yard
Step-3

Manhole
Rust 3" LT Conn
Sludge

2" Drain

Inside Cleaning by High Pressure Jet


SERVICE LINE

1
1 Shall be removed to sub-contractor
stock yard.
Manhole
High 3" LT Conn
Press
ure Jet
Storage Tank
2" Drain
NEW TANK PROJECT : PHASE-I
Work Sequence

Inside Cleaning & Oil


Water Draining
Coating

AT-110 (150 KL) AT-110 (150 KL)

MT-113 (200 KL) MT-113 (200 KL)

BT-112 (750 KL) BT-111 (750 KL)

BT-112 (750 KL)