NEW TANK PROJECT : PHASE-I
TANK CLEANING PROCEDURE
1. Water Draining
2. Scaffolding Installation
3. Inside Cleaning
By High Pressure Jet
1
4. Dry-up by Instrument Air
Inspection Item :
- Surface Appearance Check
- Accept by APT 1
No
Inspection
Yes
5. Oil Spray Coating
Inspection Item :
- Surface Appearance Check
- Accept by APT 1
Inspection No
Yes
Finish
NEW TANK PROJECT : PHASE-I
Water Draining
Step-1 Step-2
Filter Drum Filter Drum
No No
Manhole Manhole
3" LT Conn 3" LT Conn
Test Yes Yes Test
Sampling Sampling
2" Drain Pump 2" Drain
Gutter Yard
Step-3
Manhole
Rust 3" LT Conn
Sludge
2" Drain
Inside Cleaning by High Pressure Jet
SERVICE LINE
1
1 Shall be removed to sub-contractor
stock yard.
Manhole
High 3" LT Conn
Press
ure Jet
Storage Tank
2" Drain
NEW TANK PROJECT : PHASE-I
Work Sequence
Inside Cleaning & Oil
Water Draining
Coating
AT-110 (150 KL) AT-110 (150 KL)
MT-113 (200 KL) MT-113 (200 KL)
BT-112 (750 KL) BT-111 (750 KL)
BT-112 (750 KL)