[[["わかりやすい","easyToUnderstand","thumb-up"],["問題の解決に役立った","solvedMyProblem","thumb-up"],["その他","otherUp","thumb-up"]],[["わかりにくい","hardToUnderstand","thumb-down"],["情報またはサンプルコードが不正確","incorrectInformationOrSampleCode","thumb-down"],["必要な情報 / サンプルがない","missingTheInformationSamplesINeed","thumb-down"],["翻訳に関する問題","translationIssue","thumb-down"],["その他","otherDown","thumb-down"]],["最終更新日 2025-04-21 UTC。"],[[["This guide details the process of creating a schedule for pipeline runs within Cloud Data Fusion, enabling automated execution at specified intervals."],["A deployed pipeline in Cloud Data Fusion is required before setting up a schedule, and users can follow a quickstart guide if they need to create one."],["Schedules can be defined using either the \"Basic\" tab, which offers user-friendly frequency and time options, or the \"Advanced\" tab, which uses cron syntax for more precise control."],["Users can specify the maximum number of concurrent runs, with a limit of ten, to prevent overloading the system, and schedules can be started immediately or saved for later activation."],["Once a schedule is created, it can be modified, started, or suspended directly from the \"Pipeline\" page in the Cloud Data Fusion Studio by using the \"Unschedule\" button."]]],[]]