An integrated model of an open-pit coal mine: improving energy efficiency decisions
Patterson, Samuel, Kozan, Erhan, & Hyland, Paul (2016) An integrated model of an open-pit coal mine: improving energy efficiency decisions. International Journal of Production Research, 54(14), pp. 4213-4227.
Description
This article contributes an original integrated model of an open-pit coal mine for supporting energy-efficient decisions. Mixed integer linear programming is used to formulate a general integrated model of the operational energy consumption of four common open-pit coal mining subsystems: excavation and haulage, stockpiles, processing plants and belt conveyors. Mines are represented as connected instances of the four subsystems, in a flow sheet manner, which are then fitted to data provided by the mine operators. Solving the integrated model ensures the subsystems’ operations are synchronised and whole-of-mine energy efficiency is encouraged. An investigation on a case study of an open-pit coal mine is conducted to validate the proposed methodology. Opportunities are presented for using the model to aid energy-efficient decision-making at various levels of a mine, and future work to improve the approach is described.
Impact and interest:
Citation counts are sourced monthly from Scopus and Web of Science® citation databases.
These databases contain citations from different subsets of available publications and different time periods and thus the citation count from each is usually different. Some works are not in either database and no count is displayed. Scopus includes citations from articles published in 1996 onwards, and Web of Science® generally from 1980 onwards.
Citations counts from the Google Scholar™ indexing service can be viewed at the linked Google Scholar™ search.
ID Code: | 90906 | ||
---|---|---|---|
Item Type: | Contribution to Journal (Journal Article) | ||
Refereed: | Yes | ||
ORCID iD: |
|
||
Measurements or Duration: | 15 pages | ||
Keywords: | Decision Support, Energy Effciency, Integrated Model, Mixed Integer Linear Programming, Open-pit Coal Mining | ||
DOI: | 10.1080/00207543.2015.1117150 | ||
ISSN: | 1366-588X | ||
Pure ID: | 33014683 | ||
Divisions: | Past > QUT Faculties & Divisions > QUT Business School Past > Institutes > Institute for Future Environments Past > QUT Faculties & Divisions > Science & Engineering Faculty Current > Schools > School of Management Current > Schools > School of Mathematical Sciences |
||
Copyright Owner: | Consult author(s) regarding copyright matters | ||
Copyright Statement: | This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the document is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recognise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to [email protected] | ||
Deposited On: | 02 Dec 2015 01:49 | ||
Last Modified: | 22 Jul 2025 08:57 |
Export: EndNote | Dublin Core | BibTeX
Repository Staff Only: item control page