CRONOGRAMA VALORIZADO
Item
01
Descripcin partida
Und.
Metrado
C.U.
MES 1
GLB
1.00
1,782.88
1,782.88
MES 2
MES 3
MES 4
PARCIAL S/.
1,782.88
m2
2,312.51
1.58
3,653.77
3,653.77
6,567.72
TRABAJOS PRELIMINARES
01.01
CAMPAMENTO PROVISIONAL DE LA OBRA
01.02
LIMPIEZA DE TERRENO MANUAL
01.03
CARTEL DE OBRA
und
1.00
531.07
531.07
531.07
01.04
ALMACEN DE OBRA
mes
4.00
150.00
600.00
600.00
02
2,777.19
CAPTACION
02.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
10.58
1.24
13.12
13.12
02.02
EXCAVACION MANUAL EN LECHO DE QUEBRADA
m3
3.40
23.38
79.49
79.49
02.03
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
4.08
12.60
51.41
51.41
02.04
NIVELACION Y COMPACTACION MANUAL
m2
7.51
3.45
25.91
25.91
02.05
EMPEDRADO DE PISO PG 8"-10"
m2
4.89
42.81
209.34
02.06
CONCRETO SIMPLE F'C=175KG/CM2+30%PM 4"
m3
3.73
311.77
1,162.90
02.07
ENCOFRADO Y DESENCOFRADO
m2
16.16
33.75
545.40
545.40
02.08
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
15.20
21.47
326.34
326.34
INSTALACION DE COMPUERTA METALICA (0.30 X0.45M)
und
1.00
363.28
363.28
02.09
03
209.34
1,162.90
363.28
4,414.22
DESARENADOR
03.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
10.50
1.24
13.02
13.02
03.02
EXCAVACION MANUAL
m3
5.84
21.00
122.64
122.64
03.03
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
7.01
12.60
88.33
88.33
03.04
NIVELACION Y COMPACTACION MANUAL
m2
11.37
3.45
39.23
39.23
03.05
CONCRETO F'C=175KG/CM2
m3
6.05
353.57
2,139.10
2,139.10
03.06
ENCOFRADO Y DESENCOFRADO
m2
35.18
33.75
1,187.33
1,187.33
03.07
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
71.34
4.20
299.63
299.63
03.08
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
7.83
21.47
168.11
168.11
03.09
INSTALACION DE VERTEDERO PM 3/16"
und
1.00
249.53
249.53
249.53
CRONOGRAMA VALORIZADO
Item
Und.
Metrado
C.U.
MES 1
03.10
INSTALACION DE REJILLA
und
1.00
23.25
23.25
23.25
03.11
ACCESORIOS DE SALIDA
und
1.00
44.93
44.93
44.93
03.12
ACCESORIOS DE LIMPIEZA Y REBOSE
und
1.00
39.12
39.12
39.12
04
Descripcin partida
MES 2
MES 3
MES 4
PARCIAL S/.
8,828.85
CAJA DE INSPECCION (13 UND.)
04.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
8.32
1.24
10.32
04.02
EXCAVACION MANUAL
m3
9.57
21.00
100.49
100.49
200.97
04.03
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
11.48
12.60
48.22
96.43
144.65
04.04
NIVELACION Y COMPACTACION MANUAL
m2
8.32
3.45
28.70
28.70
04.05
CONCRETO F'C=100 KG/CM2 ,SOLADO
m3
0.84
268.41
225.46
225.46
04.06
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
0.23
337.31
77.58
77.58
04.07
ENCOFRADO Y DESENCOFRADO
m2
70.20
33.75
2,369.25
2,369.25
04.08
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
265.36
4.20
1,114.51
1,114.51
04.09
CONCRETO F'C=175KG/CM2
m3
6.43
353.57
2,273.46
2,273.46
04.10
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
33.02
21.47
708.94
SUMINISTRO Y COLOCACION DE ACCESORIOS
glb
1.00
1,675.01
1,675.01
04.11
05
10.32
708.94
1,675.01
8,531.59
CAMARA ROMPE PRESION ( 05 UND)
05.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
14.03
1.24
17.40
05.02
EXCAVACION MANUAL
m3
05.03
CONCRETO SIMPLE F'C= 140 KG/CM2 (DADO CS)
m3
05.04
ENCOFRADO Y DESENCOFRADO
05.05
17.40
22.13
21.00
464.73
0.14
338.89
47.44
m2
42.20
33.75
1,424.25
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
220.26
4.20
925.09
05.06
CONCRETO F'C=175KG/CM2
m3
4.50
353.57
1,591.07
1,591.07
05.07
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
50.60
21.47
1,086.38
1,086.38
05.08
PINTURA
m2
23.55
8.01
05.09
PREPARACION MANUAL DE MATERIAL PROPIO PARA RELLENO
m3
12.00
42.08
464.73
47.44
1,424.25
925.09
188.64
504.96
188.64
504.96
CRONOGRAMA VALORIZADO
Item
Descripcin partida
05.10
REFINE Y NIVELACION DE FONDO DE ZANJAS
05.11
COLOCACION DE CAMA DE APOYO PARA TUBERIA MAT. SELECCIONADO
05.12
PROVISION E INSTALACION TUBERIA PVC-SAL 2"
05.13
SUMINISTRO Y COLOCACION DE ACCESORIOS CRP-6
05.14
RELLENO Y COMPACTADO DE ZANJAS
06
06.01
Und.
Metrado
C.U.
MES 1
MES 2
MES 3
MES 4
PARCIAL S/.
m2
30.00
4.20
126.00
126.00
60.00
5.38
322.80
322.80
60.00
4.32
259.20
259.20
GLB
1.00
1,271.23
1,271.23
m3
18.00
16.80
302.40
1,271.23
302.40
CANAL DE CONDUCCION
168,263.87
CANAL ENTUBADO
06.01.01
TRAZO Y REPLANTEO DEL CANAL
KM
2.30
259.81
597.56
597.56
06.01.02
TRAZO DE NIVELES DURANTE LA EJECUCION
KM
2.30
425.15
977.85
977.85
06.01.03
EXCAVACION MANUAL EN CONGLOMERADO
m3
648.60
21.00
5,762.56
06.01.04
EXCAVACION EN ROCA SUELTA
m3
332.91
06.01.05
EXCAVACION EN ROCA DURA
m3
27.76
06.01.06
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
555.25
12.60
06.01.07
PREPARACION MANUAL DE MATERIAL PROPIO PARA RELLENO
m3
504.62
42.08
16,178.60
06.01.08
REFINE Y NIVELACION DE FONDO DE ZANJAS
m2
1,381.56
4.20
5,222.30
580.26
5,802.56
06.01.09
COLOCACION DE CAMA DE APOYO PARA TUBERIA MAT. SELECCIONADO m
2,302.60
5.38
12,387.99
12,387.99
06.01.10
PROVISION E INSTALACION TUBERIA PVC UF S-20 ISO 4435 DN 160MM
1,682.64
25.36
42,671.75
42,671.75
06.01.11
PROVISION E INSTALACION TUBERIA PVC ISO 4427 PN6 DN 160MM
06.01.12
RELLENO Y COMPACTADO DE ZANJAS
06.01.13
PRUEBA HIDRAULICA A ZANJA TAPADA P/ TUBERIA
06.02
7,858.04
13,620.60
46.91
15,616.81
15,616.81
52.74
1,464.06
1,464.06
4,258.53
6,996.15
2,737.62
5,055.81
600.00
48.95
29,370.00
m3
981.52
16.80
14,510.79
2,299.10
0.45
21,234.41
29,370.00
1,978.74
16,489.53
1,034.60
1,034.60
18,246.23
ANCLAJE TUBERIA
06.02.01
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
13.92
337.31
4,695.36
06.02.02
CONCRETO F'C=175KG/CM2
m3
1.23
377.99
464.93
4,695.36
06.02.03
ENCOFRADO Y DESENCOFRADO
m2
139.20
33.75
4,698.00
4,698.00
06.02.04
ANCLAJE METALICO
und
66.00
127.09
8,387.94
8,387.94
464.93
CRONOGRAMA VALORIZADO
Item
07
Descripcin partida
Und.
Metrado
C.U.
MES 1
MES 2
MES 3
MES 4
PARCIAL S/.
45,670.48
CANAL ALIMENTADOR AL RESERVORIO EXISTENTE
07.01
TRAZO Y REPLANTEO DEL CANAL
KM
0.47
259.81
122.11
07.02
EXCAVACION MANUAL EN CONGLOMERADO
m3
127.20
21.00
2,671.20
2,671.20
07.03
EXCAVACION EN ROCA SUELTA
m3
64.00
46.91
3,002.24
3,002.24
07.04
EXCAVACION EN ROCA DURA
m3
96.00
52.74
5,063.04
5,063.04
07.05
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
160.00
12.60
2,016.00
2,016.00
07.06
PREPARACION MANUAL DE MATERIAL PROPIO PARA RELLENO
m3
95.40
42.08
4,014.43
4,014.43
07.07
REFINE Y NIVELACION DE FONDO DE ZANJAS
m2
279.00
4.20
1,171.80
1,171.80
07.08
COLOCACION DE CAMA DE APOYO PARA TUBERIA MAT. SELECCIONADO
465.00
5.38
2,501.70
2,501.70
07.09
PROVISION E INSTALACION TUBERIA PVC SAP C-10 ISO 4422 DN 63 MM
465.00
48.95
22,761.75
22,761.75
07.10
RELLENO Y COMPACTADO DE ZANJAS
m3
127.20
16.80
2,136.96
2,136.96
07.11
PRUEBA HIDRAULICA A ZANJA TAPADA P/ TUBERIA
465.00
0.45
209.25
08
122.11
209.25
5,095.98
VALVULA DE CONTROL Y REGULACION
08.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
7.35
08.02
EXCAVACION MANUAL
m3
4.26
21
89.46
89.46
08.03
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
1.82
337.31
613.90
613.90
08.04
ENCOFRADO Y DESENCOFRADO VC
m2
14.78
20.93
309.35
309.35
08.05
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
9.11
4.2
38.26
38.26
08.06
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
14.78
21.47
317.33
317.33
08.07
SUMINISTRO Y COLOCACION DE ACCESORIOS VC/P
GLB
3718.57
3,718.57
09
1.24
9.11
9.11
3,718.57
854.08
VALVULA DE PURGA
09.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
0.98
1.24
1.22
1.22
09.02
EXCAVACION MANUAL
m3
0.49
21.00
10.29
10.29
09.03
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
0.26
337.31
87.70
87.70
09.04
ENCOFRADO Y DESENCOFRADO VC
m2
2.00
20.93
41.86
41.86
CRONOGRAMA VALORIZADO
Item
Descripcin partida
09.05
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
09.06
SUMINISTRO Y COLOCACION DE ACCESORIOS VP
10
10.01
Und.
Metrado
C.U.
MES 1
MES 2
MES 3
MES 4
PARCIAL S/.
m2
2.48
21.47
53.25
53.25
GLB
1.00
659.76
659.76
659.76
RESERVORIO DE RIEGO (247.60M3)
113,775.80
RESERVORIO DE RIEGO
10.01.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
225.68
1.24
279.84
10.01.02
EXCAVACION MANUAL
m3
331.50
21.00
6,380.00
581.50
6,961.50
10.01.03
EXCAVACION EN ROCA DURA
m3
99.45
52.74
3,496.66
1,748.33
5,244.99
10.01.04
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
198.00
12.60
2,494.80
2,494.80
10.01.05
NIVELACION Y COMPACTACION MANUAL
m2
167.31
3.45
577.22
10.01.06
CONCRETO F'C=100 KG/CM2 ,SOLADO
m3
16.50
294.41
4,857.77
10.01.07
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
0.55
337.31
10.01.08
ENCOFRADO Y DESENCOFRADO RESERVORIO
m2
212.96
127.30
9,036.60
10.01.09
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
5,254.17
4.20
22,067.51
10.01.10
CONCRETO EN RESERVORIO F'C=210 KG/CM2
m3
86.01
398.88
10.01.11
WATER STOP DE NEOPRENE DE 6". PROVISION Y COLOCADO DE JUNTA m
32.00
16.42
525.44
10.01.12
TARRAJEO INTERIOR CON MORTERO 1:2 (E=1.0 cm) + IMPERMEABILIZANTE
m2
103.84
24.50
2,544.08
10.01.13
TARRAJEO EXTERIOR CON MORTERO 1:4 (E=1.5 cm)
m2
88.92
25.68
10.01.14
PENDIENTE DE FONDO, MORTERO 1:5
m2
137.55
24.24
10.01.15
PINTURA
m2
125.09
8.01
10.02
279.84
577.22
4,857.77
185.52
185.52
18,073.21
27,109.81
22,067.51
34,307.67
34,307.67
525.44
2,544.08
2,283.47
3,334.21
2,283.47
3,334.21
1,001.97
1,001.97
8,241.92
ESTRUCTURA DE SALIDA
10.02.01
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
3.38
1.24
4.19
4.19
10.02.02
EXCAVACION MANUAL
m3
13.95
21.00
292.95
292.95
10.02.03
EXCAVACION EN ROCA DURA
m3
4.19
52.74
220.98
220.98
10.02.04
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
4.19
12.60
52.79
52.79
10.02.05
CONCRETO F'C=175KG/CM2
m3
1.95
377.99
737.08
737.08
CRONOGRAMA VALORIZADO
Item
Descripcin partida
Metrado
C.U.
m2
8.72
33.75
294.30
294.30
kg
18.21
4.20
76.48
76.48
TARRAJEO CON MORTERO 1:4 (E=1.5 cm)
m2
16.50
21.47
354.26
354.26
10.02.09
PREPARACION MANUAL DE MATERIAL PROPIO PARA RELLENO
m3
4.80
42.08
201.98
201.98
10.02.10
REFINE Y NIVELACION DE FONDO DE ZANJAS
m2
12.00
4.20
50.40
50.40
10.02.11
COLOCACION DE CAMA DE APOYO PARA TUBERIA MAT. SELECCIONADO m
20.00
5.38
107.60
107.60
10.02.12
PROVISION E INSTALACION TUBERIA PVC-SAL 4"
20.00
8.56
171.20
171.20
10.02.13
SUMINISTRO Y COLOCACION DE ACCESORIOS R
GLB
1.00
5,556.75
10.02.14
RELLENO Y COMPACTADO DE ZANJAS
m3
7.20
16.80
10.02.06
ENCOFRADO Y DESENCOFRADO
10.02.07
ACERO DE REFUERZO f'c = 4200 KG/CM2.
10.02.08
10.03
Und.
MES 1
MES 2
MES 3
5,556.75
120.96
MES 4
PARCIAL S/.
5,556.75
120.96
2,471.35
CERCO PERIMETRICO
10.03.01
EXCAVACION MANUAL
m3
1.58
21.00
33.18
33.18
10.03.02
CONCRETO SIMPLE F'C= 140 KG/CM2
m3
1.58
337.31
532.95
532.95
10.03.03
TUBERIA FIERRO NEGRO 2"
und
44.00
27.91
1,228.04
10.03.04
ALAMBRE DE PUAS #12.5
320.50
1.87
599.34
und
1.00
77.84
77.84
10.03.05
11
11.01
11.01.01
11.02
PORTON DE TUBO F NEGRO 2
1,228.04
599.34
77.84
11,229.04
CASETA DE FILTRO
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
6.93
1.24
8.59
8.59
MOVIMIENTO DE TIERRAS
11.02.01
EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL
M3
2.16
24.72
53.40
53.40
11.02.02
NIVELACION INTERIOR APISONADO MANUAL
m2
3.60
3.90
14.04
14.04
ELIMINACION DE MATERIAL EXCEDENTE D=30m.
m3
2.59
17.65
45.71
45.71
11.03.01
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
m3
2.16
300.05
648.11
648.11
11.03.02
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT
6.24
33.75
210.60
210.60
11.02.03
11.03
CONCRETO SIMPLE
m2
CRONOGRAMA VALORIZADO
Item
11.03.03
11.04
11.04.01
Descripcin partida
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
Metrado
C.U.
m3
Und.
MES 1
MES 2
MES 3
MES 4
PARCIAL S/.
0.50
310.23
155.12
155.12
CONCRETO ARMADO
COLUMNAS
11.04.01.01
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
m2
3.12
37.57
117.22
117.22
11.04.01.02
CONCRETO EN COLUMNAS F'C=175 KG/CM2
m3
0.21
399.37
83.87
83.87
11.04.01.03
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
14.15
4.20
59.43
59.43
11.04.02
VIGAS
11.04.02.01
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
1.25
37.01
46.26
46.26
11.04.02.02
CONCRETO EN VIGAS F'C=175 KG/CM2
m3
0.20
399.37
79.87
79.87
11.04.02.03
ACERO DE REFUERZO f'c = 4200 KG/CM2.
kg
11.14
4.20
46.79
46.79
14.96
70.86
1,060.07
m2
34.38
25.68
882.88
882.88
11.05
11.05.01
11.06
11.06.01
11.07
ALBAILERIA
MURO DE LADRILLO KK ARCILLA 18 HUECOS - SOGA 9 x 13 x 24 CARAVISTA
m2
1,060.07
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO INTERIOR Y EXTERIOR CON MORTERO 1:4 (E=1.5 cm)
PISOS Y PAVIMENTOS
11.07.01
PISO DE 4" CONCRETO + PULIDO 1:2 X 1CM
m2
4.32
41.39
178.80
178.80
11.07.02
VEREDA DE 4" CONCRETO + PULIDO 1:2 X 1CM
m2
2.19
41.39
90.64
90.64
11.08
ESTRUCTURA DE MADERA
11.08.01
VIGA DE MADERA TORNILLO 3"X4"
p2
30.00
7.67
230.10
230.10
11.08.02
CORREA DE MADERA TORNILLO 3"X2"
p2
25.00
7.67
191.75
191.75
m2
5.67
36.03
204.29
204.29
und
1.00
286.62
286.62
286.62
11.09
CUBERTURA
11.09.01
TECHO DE CALAMINA
11.10
CARPINTERIA METALICA
11.10.01
11.11
PUERTA DE FIERRO (0.70X1.80)
PINTURA
CRONOGRAMA VALORIZADO
Item
11.11.01
11.12
11.12.01
12
Descripcin partida
PINTURA AL LATEX EN MUROS
Und.
m2
Metrado
C.U.
MES 1
MES 2
MES 3
34.38
4.58
157.46
1.00
6,377.42
5,000.00
MES 4
PARCIAL S/.
157.46
INSTALACION DE TUBERIA Y EQUIPOS
INSTALACION DE TUBERIAS Y EQUIPOS
GLB
1,377.42
6,377.42
179,697.90
REDES PRIMARIOS, SECUNDARIOS Y TERCEARIOS
12.01
TRAZO Y REPLANTEO EN REDES
KM
3.67
431.46
1,583.46
12.02
EXCAVACION MANUAL EN CONGLOMERADO
m3
1,540.70
21.00
5,075.25
12.03
EXCAVACION EN ROCA DURA
m3
385.17
52.74
12.04
ELIMINACION DE MATERIAL EXCEDENTE D=30 M.
m3
462.21
12.60
2,911.92
2,911.92
5,823.85
12.05
PREPARACION MANUAL DE MATERIAL PROPIO PARA RELLENO
m3
880.40
42.08
18,523.62
18,523.62
37,047.23
12.06
REFINE Y NIVELACION DE FONDO DE ZANJAS
m2
2,201.00
4.20
9,244.20
12.07
CAMA DE APOYO PARA TUBERIA MAT. SELECCIONADO
3,668.33
5.38
6,578.54
12.08
PROVISION E INSTALACION TUBERIA PVC SAP C-10 ISO 4422 DN 110MM
220.35
19.04
4,195.46
12.09
PROVISION E INSTALACION TUBERIA PVC SAP C-7.5 ISO 4422 DN 110 MM
311.53
17.52
2,729.00
2,729.00
5,458.01
12.10
PROVISION E INSTALACION TUBERIA PVC SAP C-7.5 ISO 4422 DN 63 MM
446.20
6.58
1,468.00
1,468.00
2,936.00
12.11
PROVISION E INSTALACION TUBERIA PVC SAP C-10 ISO 4422 DN 63 MM
889.95
7.39
3,288.37
3,288.37
6,576.73
12.12
PROVISION E INSTALACION TUBERIA PVC SAP C-10 1"
1,661.50
3.61
2,999.01
2,999.01
5,998.02
12.13
PROVISION E INSTALACION DE TUBERIA PVC SAP C-7.5 1"
138.00
3.40
234.60
234.60
12.14
SUMINISTRO Y COLOCACION DE ACCESORIOS REDES
GLB
1.00
427.04
12.15
RELLENO Y COMPACTADO DE ZANJAS
m3
1,540.70
16.80
8,627.92
8,627.92
25,883.76
12.16
PRUEBA HIDRAULICA A ZANJA TAPADA P/ TUBERIA
3,668.33
0.45
1,650.75
1,650.75
13
13.01
14
14.01
15
1,583.46
13,322.52
13,956.93
32,354.70
20,313.87
20,313.87
9,244.20
13,157.08
4,195.46
427.04
8,627.92
und
55.00
187.33
10,303.15
MITIGACION DE IMPACTO AMBIENTAL
427.04
10,303.15
13,319.90
LINEA MOVIL DE RIEGO
LINEA MOVIL DE RIEGO
469.20
10,303.15
HIDRANTES
HIDRANTES
19,735.62
und
55.00
242.18
13,319.90
13,319.90
5,355.00
CRONOGRAMA VALORIZADO
Item
16.01
16
Descripcin partida
REVEGETACION DE ZONAS AFECTADAS
Und.
Metrado
GLB
1.00
C.U.
MES 1
MES 2
MES 3
5,355.00
MES 4
5,355.00
PARCIAL S/.
5,355.00
5,200.00
CAPACITACION
16.01
CAPACITACION EN LA GESTION Y DISTRIBUCION DEL AGUA
GLB
1.00
1,200.00
1,200.00
1,200.00
16.02
CAPACITACION Y ASIST. TEC. EN EL MANEJO DE AGUA A NIVEL PARCELAS
GLB
1.00
2,000.00
2,000.00
2,000.00
16.03
CAPACITACION Y ASISTENCIA TECNICA EN MEJORAMIENTO AGRONOMICO
GLB
1.00
2,000.00
2,000.00
2,000.00
17
116,420.12
FLETE
17.01
FLETE TERRESTRE
GLB
1.00
26,109.41
26,109.41
17.02
FLETE RURAL
GLB
1.00
90,310.71
45,155.36
22,577.60
18,062.15
4,515.60
90,310.71
112,737.98
183,201.50
336,749.08
102,575.78
735,264.39
11,273.80
18,320.15
33,674.91
10,257.58
73,526.44
7,891.66
12,824.11
23,572.44
7,180.30
51,468.51
131,903.44
214,345.76
393,996.42
120,013.66
860,259.34
23,742.62
38,582.24
70,919.36
21,602.46
154,846.68
155,646.06
252,927.99
464,915.78
141,616.12
COSTO DIRECTO
GASTOS GENERALES GG (10%)
UTILIDAD (7%)
SUB TOTAL
IMPUESTO IGV (18%)
TOTAL MENSUAL
COSTO TOTAL
26,109.41
1,015,106.02
Parcial (S/.)
6,105.70
1,438.86
3,653.77
413.07
600.00
2,551.22
13.01
95.10
50.43
27.27
75.26
1,159.66
453.45
315.10
361.94
4,344.15
12.92
164.81
97.03
94.94
1,722.92
812.62
341.72
742.76
249.13
Parcial (S/.)
22.85
44.13
38.32
6,735.11
8828.850
10.23
10.320
241.16
200.970
147.83
144.650
28.54
28.700
131.10
225.460
131.22
77.580
1,969.81
#######
1,271.07
#######
2,267.86
#######
536.29
708.940
#######
7,720.05
17.26
599.26
47.32
1,184.13
1,055.05
1,587.15
1,048.94
184.63
152.16
Parcial (S/.)
52.50
99.60
258.00
1,142.09
291.96
150,265.95
136,182.43
589.65
521.18
16,344.72
17,471.12
1,773.86
6,862.89
6,398.58
2,417.73
3,822.32
33,838.60
22,703.20
15,920.25
1,011.60
14,083.52
5,760.20
175.76
2,385.10
5,762.46
2,282.64
Parcial (S/.)
10,563.57
53.84
2,503.87
1,042.78
1,587.28
552.62
944.91
217.35
343.62
1,614.60
1,611.62
91.08
3,356.44
5.42
77.87
386.93
144.43
43.64
123.76
2,574.39
836.95
1.21
12.35
87.48
32.90
Parcial (S/.)
51.41
651.60
112,242.74
100,515.53
282.29
7,371.00
5,607.23
4,519.19
538.75
4,733.03
121.13
22,997.76
18,116.07
25,718.97
1,638.48
2,258.99
2,449.76
3,277.82
885.06
9,421.94
2.08
1,696.97
1,290.78
249.67
366.47
Parcial (S/.)
122.34
43.64
171.02
266.28
91.88
174.30
896.70
2,998.75
1,051.06
2,305.27
36.29
484.50
1,112.40
594.66
77.42
Parcial (S/.)
Parcial (S/.)
120,794.84
677.79
1,583.46
31,684.46
32,354.70
20,085.69
20,313.87
3,108.05
5,823.85
9,110.20
37,047.23
3,143.30
9,244.20
5,963.27
19,735.62
4,191.06
4,195.46
5,451.78
5,458.01
8,252.88
2,936.00
6,576.73
2,918.40
5,998.02
3,812.86
469.20
420.74
427.04
20,393.73
25,883.76
1,580.63
1,650.75
8,039.70
8,039.70
9,694.35
9,694.35
Parcial (S/.)
181,752.42
21,907.23
159,845.19