1805 Magazine
1805 Magazine
• Biomasa / Biomass
• Biogás / Biogas
STORAGE
ALMACENAMIENTO ENERGÉTICO: TECNOLOGÍAS Y PROYECTOS
PATROCINIO PLATA
www.energetica21.com/conferencias/aetp2018
SUMARIO NÚMERO 175 Abril/April 2018
ANUNCIANTES / ADVERTISERS
ÍA
EN ERG E
N DE MAG AZIN
RA CIÓ TION
GE NE GEN ERA
TA DE POW ER
RE VIS
Nº 175 Abril/A
pril 2018
- Año/Year
XVIII
EN PORTADA / COVER GAMESA ELECTRIC
XVIII
- Año/Year
pril 2018
Parque Tecnológico de Bizkaia, Gamesa Electric is a world-leading provider of industrial electrical equipment (both the design and manufacture) for
Nº 175 Abril/A
Edificio 100. 48170 Zamudio markets including photovoltaic, hydroelectric, electrical traction and marine propulsion, in addition to wind power, the
(Vizcaya, Spain) core business of its parent company, Siemens Gamesa Renewable Energy.
Phone: (+34) 944 870 837 The company has accumulated 35 years of expertise in the development of their own power electronics technologies,
Web: www.gamesaelectric.com/ coupled with over 85 years of experience manufacturing electric motors and generators.
Gamesa Electric provides integral and flexible solutions for electrical systems, which include state-of-the-art manufac-
ESPECIAL AMÉR
ICA LATINA
/ turing systems based on lean manufacturing, thus producing electrical systems fulfilling
LATAM SPECI
AL EDITION
• Análisis
de mercad
o / Market
México y/
the needs of customers throughout the world.
As part of the larger Siemens Gamesa Renewable Energy, Gamesa Electric harnesses the technological, operational
Perú, Chile,
overview:
ia
and Colomb
PV
taica / Solar
and financial advantages within the Corporation, including its network of maintenance services over five continents.
• Solar fotovol
/ Biomass
• Biomasa B-I
5MVA–S
ESA E-2.
NEW GAM
Biogas
• Biogás /
This structure allows respond to the needs of its customers in the various sectors with flexibility and with optimal
inverter,
& gas cooled PV is
gas / Diesel -SB-I liquid s in the market
• Diésel y The new
Gamesa
E- 2,5MVA
t 1.500Vd
c inverter
to its high
efficiency
y),
most compac ark thanks n efficienc
SOLAR one of the a global benchm 98,8% Europea itive pricing.
ESPECIAL INTER set to become m efficiency,
solutions.
and compet
Solar Power
/ INTERSOLAR
maximu features
(99,0% technical for a complete into real
innovative
EUROPE 2018 reliability,
customers
looking
es its PV
inverters
s, step-up
SPECIAL For those Electric integrat two PV inverter g 5,0MVA
EUROPE 2018
Gamesa s, with achievin
Station, play” solution ear,
switchg
“plug and and MV protection
container.
EDITION transformer
at 50ºC , in a 40ft ISO
standard
le Energy
Compan
y
Renewab
MIENTO Siemens
Gamesa
ALMACENA Gamesa
Electric, a
/ ENERGY
ENERGÉTICO
STORAGE
IFAT
14-18 mayo/may OPEN GES XPERIENCE MIREC WEEK AFRICA ENERGY FORUM
Munich, Alemania/Germany 17 mayo/may 21-25 mayo/may 19-22 junio/june
[email protected] Barcelona, España/Spain México DF Isla Mauricio / Mauritius Island
www.ifat.de [email protected] [email protected] [email protected]
www.grupoelectrostocks.com/es/ http://mirecweek.com/ES www.africa-energy-forum.com/
2 0 1 8
31 mayo/may GENERA INTERSOLAR EUROPE EES EUROPE
Madrid, España/Spain 13-15 junio/june 20-22 junio 20-22 junio/june
[email protected] Madrid, España/Spain Munich, Alemania/Germany Munich, Alemania/Germany
https://goo.gl/43HyG4 [email protected] [email protected] [email protected]
www.ifema.es/genera_01 www.intersolar.de www.ees-europe.com
EUROPEAN BIOMASS TO
POWER
7-8 noviembre/november ECOMONDO MATELEC INDUSTRY
18 octubre/october Estocolmo/ Stockholm, Suecia/Sweden 6-9 noviembre/november 13-16 noviembre/november
Madrid, España/Spain [email protected] Rimini, Italia/Ityaly Madrid, España/Spain
[email protected] www.wplgroup.com/aci/event/ [email protected] [email protected]
https://goo.gl/qEt5T3 european-biomass-to-power/ www.keyenergy.it/ www.ifema.es/matelecindustry_01/
PATROCINIO PLATINO
PATROCINIO ORO
PATROCINIO PLATA
www.energetica21.com/conferencias/digitalenergy2018
PANORAMA
Editor Eugenio Pérez de Lema. Director Álvaro López. Responsable Editorial Javier Monforte.
Coordinación Gisela Bühl. Director Financiero Carlos Fernández. Departamento Internacional Juan José García.
Maquetación DCB Imprime Booklet S.L.
Es una publicación de OMNIMEDIA S.L. C/ Rosa de Lima 1 bis. Edificio Alba, ofic. 104. 28290 Las Matas (Madrid).
Energética XXI es miembro de la Asociación Española de Tel: +34 91 630 85 91 +34 902 36 46 99 Fax +34 91 630 85 95 E-mail: [email protected]. Web: www.energetica21.com
Editoriales de Publicaciones Periódicas, que a su vez es
miembro de FIPP, EMMA, CEPYME y CEOE.
CONSEJO ASESOR
Energética XXI es una empresa colaboradora D. Ángel F. Germán Bueno, Ingeniero Industrial y Profesor de Univ. Zaragoza. D. Ahmed Moussa, Ingeniero Industrial y Presidente de Stratconsult, S.L. D.
de Energía sin Fronteras. José Luis García Fierro, Prof. de investigación del Instituto del Catálisis y Petroleoquímica del CESIC. D. Oscar Miguel Crespo, Dr. en Química y Resp. del
Dpto. de Energía de IK4-CIDETEC. D. Francisco Marcos Martín, Dr. Ingeniero de Montes y Profesor de la Universidad Politécnica de Madrid. D. Antonio Soria-
Verdugo, Dr Ingeniero Industrial y Profesor en la Universidad Carlos III de Madrid.
COGENERACIÓN/CICLOS COMBINDOS
GENERACIÓN ELÉCTRICA A PARTIR DE ENERGÍAS RENOVABLES
Siemens Gamesa
suministrará 166
MW a cuatro nuevos
parques eólicos en
España / Siemens
Gamesa to supply Acciona, mayor
166 MW at four new comercializadora 100%
wind farms in Spain renovable del mercado español/
Siemens Gamesa Renewable Energy (SGRE) ha Acciona, the biggest retailer
alcanzado nuevos acuerdos con Gas Natural
Fenosa Renovables para el suministro de 166 of 100% renewable energy
MW a cuatro parques eólicos en España. Estos
proyectos se enmarcan dentro de la potencia
in the Spanish market
renovable adjudicada a la energética española
en la subasta celebrada en mayo del año pa- Acciona Green Energy Developments Unión Europea, posibilidad ésta con-
sado. fue la mayor comercializadora 100% templada en la normativa.
Así, Siemens Gamesa pondrá en marcha un renovable en España durante el pa- Acciona Green Energy Developments
total de 48 turbinas del modelo SG 3.4-132, sado año, según los datos hechos was the biggest retailer of 100% re-
uno de los más demandados en la actualidad, públicos por la Comisión Nacional newable electricity in Spain last year,
con una capacidad total de 166 MW. La com- del Mercado de Valores y la Com- according to data published by the
pañía se encargará también de las tareas de petencia (CNMC) sobre el Sistema Spanish National Commission on
operación y mantenimiento de estos cuatro de Garantía de Origen y Etiquetado Markets and Competition (CNMC) on
parques durante tres años, cuya entrada en de la Electricidad correspondientes a the System to Guarantee the Origin
funcionamiento se realizará a mediados del 2017. and Labelling of Electricity for 2017.
año que viene. El informe aprobado por la Sala de The report approved by the Re-
Las palas de estas turbinas se fabricarán en Supervisión Regulatoria de la CNMC gulatory Oversight Chamber of the
la planta de Aoiz, en Navarra, así como en la el pasado 5 de abril certifica un año CNMC last April 5th certified, for yet
planta de Tánger, en Marruecos, mientras que más que el origen de la totalidad de another year, that the origin of all the
las nacelles se producirán en la planta soriana la energía suministrada por Acciona energy supplied by ACCIONA Green
de Ágreda. Green a sus clientes es 100% re- to its customers is 100% renewable
Siemens Gamesa Renewable Energy (SGRE) novable, al contar con garantías de as it has sufficient guarantees of ori-
has entered into new agreements with Gas origen suficientes, energía generada gin. Furthermore, the energy is ge-
Natural Fenosa Renovables for the supply of además por las propias instalaciones nerated by the Group’s own renewa-
166 MW at four wind farm developments in renovables del grupo. bles facilities.
Spain. These projects fall under the scope of Según dicho informe, Acciona According to this report, Accio-
the renewable capacity allocated to the Spa- Green aportó a sus clientes en Espa- na Green provided its customers in
nish utility as part of the auction held last May. ña –“redimió”, según la terminología Spain with Guarantees of Origin for a
Specifically, Siemens Gamesa will commis- técnica- Garantías de Origen corres- total of 5,309 gigawatt-hours (GWh)
sion a total of 48 of one of its most popular pondientes a un total de 5.309 giga- of electric power, free of charge.
turbines, the SG 3.4-132, thus installing 166 vatios hora (GWh) de energía eléctri- This figure represents 16.4% of the
MW of capacity. The company will also opera- ca, todas ellas entregadas al cliente electricity with this kind of guarantee
te and maintain these four wind farms, which de forma gratuita. Esa cifra supone supplied to customers in Spain.
are due to be commissioned in mid-2019, for un 16,4% de electricidad con esa It also transferred another 964
three years. garantía suministrada a clientes en GWh under the Guarantee of Origin
The blades for these turbines will be made España. Regime to energy retailers in other
at the Aoiz factory (Navarre, Spain) and the Adicionalmente, transfirió otros Member States of the European
Tangier factory (Morocco), while the nacelles 964 GWh en GdO a comercializado- Union, a possibility envisaged in the
will be produced at the Ágreda facility (Soria, ras de otros estados miembros de la legislation.
Spain).
Nclave
Abengoa se adjudica contratos de
sigue
tecnología, ingeniería y soporte de
sumando
dos nuevos proyectos termosolares en
MW en
China / Abengoa is awarded technology,
México
engineering and support contracts for
two new solar thermal projects in China
Nclave Abengoa ha sido seleccionada soporte técnico al proyecto molten salt tower solar thermal
recientemente para el suminis- Royal Tech Yumen, una planta plant project, in the Qinghai
keeps tro de la tecnología y la inge- termosolar cilindroparabóli- Province, as well as providing
Líder nacional en
io
nt
as
m
ic
ic
da
or
tr
éc
ro
an
tratamientos
el
si
e
ón
s
rd
ea
en
ile
lín
anticorrosión
qu
in
de
du
al
o
y
st
nt
je
ria
ie
ta
s
m
on
ni
M
te
ón
M
ig
es
rm
• Técnicamente a la vanguardia
al
ho
c
rti
de
ve
s
jo
ra
ba
pa
Tr
y
o
nt
ie
re
m
pr
ni
te
y en proyectos internacionales
oo
an
fin
Anticorrosión en buques
g
Contáctenos:
[email protected]
+49 (0)40 98 76 88 00
¡Véalo aquí primero! Más de 240 expositores internacionales mostrarán sus innovaciones de punta
Contáctese con más de 12.500 profesionales solares de Latinoamérica
¡El conocimiento lo es todo! Venga a actualizarse en el mayor congreso latinoamericano para el sector solar
GAMESA ELECTRIC,
A WORLD-LEADING PROVIDER OF
INDUSTRIAL ELECTRICAL EQUIPMENT
Gamesa Electric is a world-leading provider of industrial electrical equipment (both the design
and manufacture) for markets including photovoltaic, hydroelectric, electrical traction and marine
propulsion, in addition to wind power, the core business of its parent company, Siemens Gamesa
Renewable Energy.
T
he company has accumulated 35 services over five continents. This structure first 450 kW central photovoltaic inver-
years of expertise in the develop- allows respond to the needs of its custo- ter was designed and manufactured. The
ment of their own power electronics mers in the various sectors with flexibility same year, the company rose to the tech-
technologies, coupled with over 85 years and with optimal solutions. nological forefront through the launch of
of experience manufacturing electric mo- Gamesa Electric has its headquarters in Europe’s first photovoltaic inverter using
tors and generators. Zamudio, Spain, and 7 production centers 100 kW-capacity IGBT technology, which
Gamesa Electric provides integral and (3 in Spain, 2 in China and 2 in India). All still remains in operation today.
flexible solutions for electrical systems, its factories are ISO 9001, ISO 14001 and Building on more than 25 years of ex-
which include state-of-the-art manufactu- OHSAS 18001 certified. perience in the sector, Gamesa Electric’s
ring systems based on lean manufacturing, All the power electronics solutions descri- central inverters utilize proven designs
thus producing electrical systems fulfilling bed herein are designed and manufactu- and state-of-the-art technology needed
the needs of customers throughout the red in the new facility that Gamesa Electric to meet or exceed even the most stringent
world. has opened in Madrid (Spain). grid-connection codes under the most
As part of the larger Siemens Gamesa demanding environmental conditions.
Renewable Energy, Gamesa Electric har- Gamesa Electric and the Solar PV Gamesa Electric experience ensures the
nesses the technological, operational and market highest levels of quality, reliability and per-
financial advantages within the Corpora- The company began operating in the formance regardless of the photovoltaic
tion, including its network of maintenance photovoltaic sector in 1993, when the
T
máxima demanda de electrici- he third largest country share of renewable energy re-
E
l tercer país más grande dad de Perú en el SEIN incre- in South America, with sources (RER), including wind,
de Suramérica, con una mentó de 3.580 MW en 2006 population of around solar, mini hydro of below 20
población alrededor de a 6492 MW en 2016, un au- 32 million, has historically re- MW, and biomass and biogas
32 millones, históricamente ha mento de 81 % en más de diez lied on hydropower for most was 4.8%. On the demand
dependido mayoritariamente años. Un país de gran biodiver- of its power generation. After side, Peru’s maximum electri-
de hidroelectricidad en cuanto sidad y una variedad geográfi- 2002, there has been an ex- city demand in SEIN increased
a su generación de energía. ca, Perú tiene recursos substan- pansion of natural gas gene- from 3,580 MW in 2006 to
Después del 2002, ciales de energías renovables, ration, especially as a result 6,492 MW in 2016, a surge
ha habido una expansión en incluyendo energía eólica, solar, of the development of the of 81% over ten years.
la generación de gas natural, geotérmica y de biomasa, ade- Camisea gas field in central A country of high biodiversi-
especialmente como resultado más de hidroeléctrica. Peru. ty and varied geography, Peru
del desarrollo de yacimiento El potencial eólico explotable In 2017, Peru produced has substantial renewable
gasífero de Camisea en el cen- ha sido estimado a más de 22 52,643 GWh of electricity energy resources, including
tro de Perú. GW, mayormente ubicado en at national level, according wind, solar, geothermal and
En 2017, Perú produjo 52 la costa de Perú, mientras que to preliminary data from the biomass, in addition to hydro-
643 GWh de electricidad a ni- la mayor fuente solar se pue- Ministry of Energy and Mi- power. The exploitable wind
vel nacional, de acuerdo con de encontrar en áreas al sur nes (MEM). Wind and solar potential has been estimated
la información preliminar del de Perú, donde la irradiación accounted for about 2% and at more than 22 GW, located
Ministerio de Energía y Minas solar promedio es de 250 W/ 1%, respectively, of the gene- mainly along Peru’s coast whi-
(MEM). Las energías eólica y m2.ANADORES DE LASATRO- ration. The largest part, 55%, le the greatest solar resource
solar cubren alrededor del 2 SUBASTAS DE ENEGÍ came from hydropower, while is found in areas in southern
% y 1%, respectivamente, de Las subastas de energías re- natural gas provided 42%. Peru where the average daily
la generación. La mayor parte, novables, introducidas después In comparison, SEIN (Natio- irradiance is 250 W/m2.
55%, provino de hidroeléctri- de un decreto legislativo en nal Interconnected Electric Renewable energy auctions,
cas, mientas que el gas natural 2008 diseñado para promover System) data for 2016 show introduced after a 2008 le-
atribuyó un 42%. En compa- la generación de energías re- that electricity generation gislative decree designed to
ración, los datos del SEIN (Sis- novables, han sido el principal was 48,326 GWh. Natural promote renewable power
tema Eléctrico Interconectado elemento para el desarrollo de gas power plants generated generation, have been the
Nacional) en 2016 demuestran key instrument for the deve-
que la generación de electrici- lopment of non-conventional
dad fue de 48.326 GWh. Las
El Plan Energético Nacional de Perú renewables in the country.
plantas de energía de gas na- 2014-2025 estableció un objetivo para Peru has so far held four
tural generaron 46,3% del to- generar 60% de energías renovables energy tenders. The auctions
tal y las plantas hidroeléctricas are technology-specific, with
45,8%. El valor de los Recursos
para el 2025 required amounts set for each
Energéticos Renovables (RER), eligible technology. A total of
incluyendo energía eólica, Peru’s National Energy Plan 2014-2025 64 projects have been awar-
solar, mini hidroeléctrica por ded across the four tenders,
debajo de 20 MW, biomasa y sets a target of 60% generation from representing 1,257 MW of
biogás fue de 4,8%. renewable energy by 2025 capacity.
Descargue aquí el Informe completo de PENREC 2018 Download the full PENREC 2018 Report here
https://info.greenpowerglobal.com/penrecrenewprojreportesp/ https://info.greenpowerglobal.com/penrecrenewprojreportesp/
dios. Chile tiene los mejores Carlos Finat, director ejecutivo Despite these challenges, the deliver projects at these prices.
recursos solares del mundo en de ACERA, la Asociación Chi- solar outlook remains very po- “It all comes down to the ma-
el desierto de Atacama, que lena de Energías Renovables y sitive, with expansion models turity of the developer”, said
también alberga una de las Almacenamiento. estimating that Chile will add Adrian Katzew, CEO of Zuma
mayores concentraciones de another 9 GW of CSP and PV Energy. Developers who have
empresas dedicadas a la mi- México: un mercado de over the next 20 years. “An carefully chosen sites and opti-
nería. Las operaciones mineras alto crecimiento important step for Chile is the mized design should succeed.
de cobre y litio en esta región El mercado mexicano de ener- retirement of all coal plants It’s been forecast that by
requieren una gran cantidad gía solar ha crecido acelerada- that don’t have carbon cap- 2021 there could be between
de energía que tradicional- mente desde que la reforma ture and storage mechanisms. 5.8 and 10.8 GW of opera-
mente se había proporciona- del sector energético allanó el We are in consultations with ting solar capacity in Mexico,
do quemando combustibles terreno para nuevas empresas industry to decide on a timeli- according to figures shown
fósiles. Sin embargo, la ener- y tecnologías. En tres rondas ne”, said Carlos Finat, executi- by Armando Muñoz, Busi-
gía fósil en Chile tiende a ser de subastas de energías re- ve director of ACERA, the Chi- ness Development Manager
cara, principalmente porque novables, se aprobaron más lean Association of Renewable at Jinko Solar. A lot of this
casi todos los combustibles de 37 proyectos solares, que Energy and Storage. growth is expected to come
fósiles que allí se consumen suman 5 GW de nueva ca- from renewable energy auc-
son importados. Esto significa pacidad que se conectarán a Mexico: a high growth tions, but they are not the only
que la energía solar a menudo red desde ahora hasta 2020 y market path open to developers. The
es la fuente de energía más representan una inversión de The Mexican solar energy mar- merchant market, in which
económica. 5.000 millones de dólares. ket has gone from strength to operators sell directly into
Esto no quiere decir que no “Alrededor del 85% del te- strength since the energy sec- wholesale energy markets,
haya desafíos. En caso de que rritorio mexicano es adecuado tor reform opened the market could also be an attractive
haya un bajón en los precios para el desarrollo de proyectos to new players. In three rounds proposition for developers,
de los combustibles fósiles, la fotovoltaicos, y si se tiene en of renewable energy auctions, with prices as high as USD 60
energía solar podría no ser tan cuenta el apetito por el desa- more than 37 solar projects per MWh, almost three times
competitiva. Este es un riesgo rrollo de proyectos solares, se have been approved, amoun- higher than the long-term
que deben asumir los opera- podría decir que es una tor- ting to 5 GW of new capacity contracts awarded in the ener-
dores. Además, el mercado de menta perfecta”, dijo Héctor that will be added from now gy auctions. However, pane-
energía distribuida representa Olea, presidente de ASOLMEX to 2020 and representing an lists pointed out that there is a
tan solo 14 MW de instalacio- (Asociación Mexicana de Ener- investment of USD 5 billion. need to increase transparency
nes, aunque está creciendo gía Solar). “Around 85% of Mexican and access to information in
rápidamente. Los precios de la energía territory is suitable for deve- wholesale markets.
A pesar de estos desafíos, la solar se han reducido a más loping PV projects, and if you Although challenges remain,
perspectiva solar sigue siendo de la mitad desde la primera consider the appetite there is the overall outlook is positive.
muy positiva, y los modelos subasta de energía en 2015, for solar project development, Now the industry waits for
de expansión estiman que pasando de 47,78 a 20,57 you could say this is a perfect contracts under the 4th re-
Chile sumará otros 9 GW de dólares. Mientras que algunos storm” said Héctor Olea, Pre- newable energy auction to be
termosolar y fotovoltaica en ven esto como un desarrollo sident of ASOLMEX (Mexican awarded.
los próximos 20 años. “Un positivo, otros cuestionan si Solar Association).
paso importante para Chile es los desarrolladores realmente Solar energy prices have Colombia: the new kid
el cese programado de todas podrán entregar proyectos a more than halved since the on the block
las plantas de carbón que no estos precios. “El éxito depen- first energy auction in 2015, Colombia is a new solar mar-
cuenten con tecnologías de derá del grado de madurez del going from USD 47.78 to USD ket with great potential. In
captura y almacenamiento proyecto y del promotor”, dijo 20.57. Whilst some see this the north eastern department
de carbono. Estamos en con- Adrián Katzew, CEO de Zuma as a positive development, of La Guajira, where the best
sultas con la industria para Energy. Los desarrolladores others question whether de- solar resources are found,
decidir un cronograma”, dijo que hayan elegido los empla- velopers will really be able to technical potential has been
Capacidad Capacity
1era Subasta 2da Subasta 3era Subasta 1st Tender 2nd Tender 3rd Tender
otorgada Awarded
Solar 1.691 MW 1.853 MW 1.323 MW Solar 1,691 MW 1,853 MW 1,323 MW
Promedio Average
41,8 33,47 20,57 USD41,8 USD33,47 USD20,57
(US$/MWh) ($/MWh)
Tabla 1. Resultados de las subastas de energías renovables en México. Los re- Figure 2. Renewable energy auctions in Mexico [4th auction results are still to be
sultados de la cuarta subasta están por anunciarse (fuente: Secretaría de energía announced] (Source: Energy Secretariat of Mexico)
de México)
INVERSIONES EN SOLAR
EL SECTOR SOLAR INVESTMENTS:
FOTOVOLTAICO: REDUCING
REDUCIR EL RIESGO THE RISK OF
DE RETORNOS UNFAVORABLE
DESFAVORABLES RETURNS
Precios competitivos, entregas a tiempo, Competitive prices, on-time delivery, quick
instalación rápida: es muy fácil hacer installation – it’s all too easy to make
suposiciones sobre lo que pueden querer assumptions about what utility-scale solar
quienes invierten en plantas fotovoltaica de investors may want. However, what’s commonly
gran escala . Sin embargo, lo que muchas overlooked or discounted by many outside the
personas ajenas a la comunidad inversora investment community, is what’s most important
suelen pasar por alto o dar por sentado es lo and highly sought after from those within it: a
más importante y lo más buscado por quienes low-risk investment with steady and predictable
pertenecen a ella: una inversión de bajo riesgo cash flows for 20-30 years.
con flujos de caja constantes y predecibles
durante 20-30 años.
CÉSAR ALBERTE SENDIN titive with a range of traditio-
VICE PRESIDENT INTERNATIONAL nal energy sources.
AT ARRAY TECHNOLOGIES
CÉSAR ALBERTE SENDIN La industria fotovoltaica ha Investing in Utility-Scale Solar
O
VICE PRESIDENT INTERNATIONAL dado grandes pasos para pro- ver the last decade For an investor to take in-
AT ARRAY TECHNOLOGIES
porcionar certeza a la comu- the utility-scale mar- terest in a solar project, risk
E
n la última década, el nidad inversora. El creciente ket of the solar PV in- must be reduced to an abso-
sector de plantas so- número de inversores insti- dustry has greatly improved its lute minimum. A solar array
lares fotovoltaicas de tucionales que ahora respal- competitiveness as an energy must generate electricity at a
gran escala ha mejorado enor- dan proyectos fotovoltaicos generation source. It has been predictable operational cost
memente su competitividad es fruto de esta labor, pero exciting to watch the cost of structure in order to deliver
como fuente de generación de todavía queda mucho por electricity produced from PV long-term, reliable returns.
energía. Ha sido fascinante ver hacer. power plants become compe- The PV industry has made
cómo el coste de la electrici- great strides in delivering
dad producida por las plantas certainty for the investment
solares se ha hecho competiti- community. The ever-increas-
vo con respecto a las fuentes ing number of institutional in-
de energía convencionales. vestors that are now backing
PV projects is a fruit of these
Invertir en plantas labors, but there is still a way
solares de gran escala to go.
Para que un inversor se intere-
se en un proyecto solar, el ries- Testing and Due
go se debe reducir al mínimo Diligence
más absoluto. Una planta so- Many project developers turn
lar debe generar electricidad a to independent engineers and
unos costes operacionales pre- quality assurance providers to
decibles para generar retornos carry out the required due di-
fiables a largo plazo. ligence when it comes to key
PV power plant components.
Evaluación de riesgo e
impacto económico
El informe concluyó que la ar-
quitectura centralizada tenía
costes de operación y mante-
nimiento (O&M), tanto pro-
gramados como no programa-
dos, ampliamente inferiores a
los de la arquitectura descen-
tralizada objeto del estudio.
Según dicho estudio, los
menores costes de O&M de
la arquitectura centralizada se
tradujeron en 6,4 millones de
dólares a lo largo de 30 años
para una instalación de 100
megavatios. Otras conclu-
siones reflejaron que la arqui-
tectura centralizada presenta
una pérdida de energía debido
a fallos de los componentes La industria fotovoltaica ha dado port found unscheduled
un 39 % menor que la arqui- O&M costs to be the most
tectura alternativa; que tiene grandes pasos para proporcionar damaging to a PV project’s
un coste nivelado de electrici- certeza a la comunidad inversora bottom line. This should give
dad (LCOE) un 6,7 % inferior; cause for investors to take a
y que ofrece un 4,5 % más de close look at all components
valor actual neto (VAN). The PV industry has made great when investing in utility-scale
strides in delivering certainty for the solar. Notwithstanading the
Balance de situación fundamental differences bet-
Al desglosar los costes de
investment community ween tracker architectures,
O&M en más detalle, el in- many solar plant financial
forme concluyó que los cos- models incorrectly assume
tes de O&M no programados identical O&M expenses. Fi-
son los más dañinos para la nancial returns on solar PV
cuenta de resultados de un A medida que la industria fo- According to the study, the power plants can be signifi-
proyecto fotovoltaico. Esto tovoltaica entra en la siguiente lower O&M costs of the cen- cantly impacted by erroneous
debería motivar a los inver- etapa de su evolución, hay tralized architecture translated O&M modeling assumptions.
sores a analizar con más de- buenas razones para creer que into $6.4 million over 30 years As the PV industry enters
talle todos los componentes todos los riesgos de los activos for a 100-megawatt facility. the next stage of its evolu-
cuando inviertan en energía solares se evaluarán con may- Other findings showed the tion, there is good reason to
solar fotovoltaica de gran es- or detalle. Un examen riguro- centralized tracking architec- believe all the risks of a so-
cala. A pesar de las diferen- so puede revelar componentes ture loses 39 percent less ener- lar array will be assessed in
cias fundamentales entre las con fiabilidad por debajo de gy due to component failures greater detail. More scrutiny
arquitecturas de seguidores, lo necesario y altos costes de compared to the alternative may uncover potentially un-
muchos modelos financieros O&M antes de que la inversión architecture; has a 6.7 percent derperforming components
asumen incorrectamente los se lleve a cabo. lower levelized cost of energy and high O&M costs before
mismos gastos de O&M. Los Cualquier demora en que (LCOE); and nearly 4.6 percent an investment is made. For
retornos financieros de las esto suceda siempre será ex- higher net present value (NPV). investors, this can’t happen
plantas fotovoltaicas pueden cesiva para los inversores; a fin quick enough, after all, it’s
verse significativamente afec- de cuentas, lo que realmente The Bottom Line what they really want: pre-
tados por hipótesis erróneas quieren son flujos de caja pre- Breaking down the O&M dictable cash flows with mini-
en los modelos de O&M. decibles a un riesgo mínimo costs in more detail, the re- mum risk
T
he new PV plant, called September 2018. The project
Solem, in the estate of has signed contracts for the
CARLOS CASTELLANOS cos de última generación de Aguascalientes, will be sale of power, energy and
CEO DE ALTEN AMERICA 330 Wp/unidad. Los trabajos one of the biggest in Latin green energy certificates (CEL)
de construcción darán em- America. Construction is un- with CFE Suministro Básico,
L
a nueva central foto- pleo a una plantilla promedio der the management of the awarded during Mexico’s se-
voltaica denominada de más de 600 trabajadores Spanish construction group cond Long-Term Electricity
Solem, en el estado con picos de contratación Ortiz, a shareholder of the AL- tender, conducted in Sept-
de Aguascalientes, será una que pueden llegar a los 1.500 TEN group. The plant is in the ember 2016. It will generate
de las más grandes de Lati- trabajadores. municipality of El Llano and clean energy equivalent to the
noamérica. Su construcción La terminación de la obra covers over 1,035 hectares electricity needs of more than
corre a cargo del Grupo Or- y entrada en operación está of land. 1,050,000 latest ge- 400,000 people and avoid
tiz, empresa de construcción prevista para septiembre de neration PV panels, each unit 362,000 tonnes of carbon
española y socio del grupo 2018. El proyecto cuenta con with 330 Wp, will be used in emissions into the atmosphere
ALTEN. La planta está ubicada contratos de compraventa de its construction. The average a year.
en el Municipio de El Llano y potencia, energía y certificados payroll during the construc- Total investment in this plant
cuenta con una extensión de de energía limpia (CEL) firma- tion works will be over 600 is budgeted at US$335 million.
más de 1.035 hectáreas. En dos con CFE Suministro Básico workers, with those numbers The project is being finan-
su construcción se utilizarán otorgados en el marco de la se- rising to 1,500 during hiring ced by ALTEN America itself,
1.050.000 paneles fotovoltai- gunda Subasta Eléctrica de Lar- peaks. Sojitz Corporation and Cubi-
go Plazo, que se llevó a cabo Proyecto Solen 350 MW, Aguascalientes (Mexico).
en México en septiembre de
2016. Generará energía limpia
equivalente para el suministro
aproximado de electricidad
a una población de más de
400.000 mexicanos y se evita-
rán 362.000 Tm CO2/año.
La inversión total prevista en
esta planta será de US$335
millones. El proyecto cuenta
con la aportación de fondos
propios de ALTEN América, de
Sojitz Corporation y de Cubi-
co Sustainable Investments y
la co-financiación de los ban-
cos de desarrollo mexicanos
Bancomext y Banobras, las
entidades multilaterales Cor- instalación de nuevas centrales co Sustainable Investments, market and estimates that the
poración Interamericana de de energías renovables seguirá plus co-financing from the installation of new renewable
Inversiones (IIC), miembro del creciendo durante los próximos Mexican development banks energy plants will continue to
Banco Interamericano de Desa- años para poder cumplir con el Bancomext and Banobras, the grow in the coming years in
rrollo, el IFC, miembro del Gru- objetivo que México se marcó multilateral institutions Cor- order to meet the goal that
po Banco Mundial y de Bank of en la reforma energética, que poración Interamericana de Mexico has set itself for ener-
Tokyo-Mitsubishi UFJ. establece que el 35% de la ge- Inversiones (IIC), member of gy reform, namely that 35%
La operación de financiación neración proceda de Energías the Inter-American Develop- of its total power generation
de esta planta, una de las más Limpias en 2024. ment Bank, the IFC, member will be sourced from clean
grandes de Latinoamérica ha “Nuestra intención es triplicar of the World Bank Group and energies by 2024.
contado con el reconocimien- nuestra presencia en México en the Bank of Tokyo-Mitsubishi “Our intention is to triple
to internacional del sector, al los próximos cuatro años. Que- UFJ. our presence in Mexico over
ser galardonada con el premio remos desarrollar y construir The financing operation for the next four years. We want
Latin American Solar Deal of nuevas plantas fotovoltaicas this plant, one of the biggest to develop and build new PV
the Year otorgado por la pres- hasta alcanzar un objetivo de in Latin America, has received plants until we reach a target
tigiosa revista IJ Global, en la 1.000 MW de capacidad insta- international recognition in of 1,000 MW of installed ca-
XV edición de estos premios lada, para lo que necesitamos the sector, being awarded La- pacity, for which we need to
celebrada en Nueva York, el desarrollar y construir nuevas tin American Solar Deal of the develop and construct new
pasado mes de marzo. centrales con una capacidad Year by the prestigious journal plants with a capacity of 650
Tras la puesta en marcha de de 650 MW y una inversión IJ Global, during the XV edi- MW and a forecast investment
su primer proyecto en México, prevista de unos US$600 mi- tion of these awards, held in of around US$600 million”,
la intención de ALTEN América llones.”, afirma Carlos Caste- New York in March. declared Carlos Castellanos,
es seguir creciendo en el país, llanos CEO de ALTEN America. After implementing its first CEO of ALTEN America.
donde cuenta con un pipeline Por su parte el presidente eje- project in Mexico, ALTEN The Executive Chair of AL-
de proyectos en fase de de- cutivo de ALTEN Energías Reno- America intends to continue TEN Energías Renovables,
sarrollo de 650 MW. Durante vables, Juan Laso, ha resaltado growing in the country, whe- Juan Laso, highlighted the
los próximos meses, ALTEN la apuesta de la compañía por re it has 650 MW of projects push that ALTEN Energías Re-
América planea participar en el continente americano a tra- in development phase. Over novables is making into the
la cuarta Subasta Eléctrica de vés de su división ALTEN Ame- the next few months, AL- American continent, through
Largo Plazo prevista en México, rica: “México es nuestra gran TEN America plans to take its ALTEN America division:
donde está previsto que se ad- apuesta. Contamos con un part in Mexico’s fourth Long- “We are putting our bets on
judiquen alrededor de 2.000- gran equipo con experiencia y term Electricity Tender, where Mexico. We have a great team
3.000 MW, de los cuales apro- un atractivo pipeline de nuevos around 2.000-3.000 MW is with lots of experience and an
ximadamente un 50% podrían proyectos. Con ellos queremos expected to be made avai- attractive new project pipe-
ser adjudicados a proyectos fo- ser parte importante en el pro- lable, around half of which line. We want to be a major
tovoltaicos. El grupo ALTEN ha ceso para que los mexicanos could be adjudicated on PV player in the process so that
centrado su enfoque en el mer- disfruten de electricidad más projects. The ALTEN group Mexicans can enjoy cleaner,
cado mexicano y estima que la limpia y más barata” has focussed on the Mexican cheaper electricity.”
ENRIQUE MUGUIRO DE SALA anunció la formalización de la ENRIQUE MUGUIRO DE SALA stake (between 90 and 95%)
DIRECTOR GENERAL INYPSA adquisición de una participa- GENERAL MANAGER AT INYPSA of a solar photovoltaic project
ENERGÍAS RENOVABLES RENEWABLE ENERGY
ción mayoritaria (entre el 90 y (Parque Talpa Solar) that, once
E T
l Aeropuerto Interna- el 95%) de un proyecto solar he International Airport built, will supply energy to
cional de El Salvador fotovoltaico (Parque Talpa So- of El Salvador, officially the El Salvador International
oficialmente, conocido lar) que, una vez construido, known as the Monse- Airport, through a power pur-
como Aeropuerto Monseñor abastecerá de energía al Ae- ñor Oscar Arnulfo Romero y chase and sale contract signed
Oscar Arnulfo Romero y Galdá- ropuerto Internacional del El Galdámez Airport, is located with the Autonomous Port Ex-
mez, está situado a 40 km de Salvador mediante un contra- 40 km from the capital San ecutive Commission (CEPA). It
la capital San Salvador. Mueve to de compra-venta de ener- Salvador. It moves around is estimated that around 30%
al año cerca de 3 millones de gía suscrito con la Comisión 3 million passengers a year, of the energy consumed by
pasajeros, lo que lo sitúa como Ejecutiva Portuaria Autónoma which makes it the second the airport may come from
el segundo aeropuerto más im- (CEPA). Se estima que entorno most important airport in the solar park. It is a physi-
portante de Centro América, al 30% de la energía consu- Central America, just behind cal PPA (Power Procurement
solo por detrás del aeropuerto mida por el aeropuerto pueda the airport in Panama. It was Agreement), in which energy
de Panamá. Fue construido en venir del parque solar. Se trata built in the 70s, and is cu- delivery between the plant
la década de los 70, y actual- de un PPA (Power Procure- rrently immersed in a process and the airport really occurs,
mente está inmerso en un pro- ment Agreement) físico, en el of reform, expansion and mo- vs. the financial PPAs that are
ceso de reforma, ampliación y que realmente se produce una dernization that will make it so fashionable in these times.
modernización que lo conver- entrega de energía entre la one of the engines of regional This project is the first inter-
tirá en uno de los motores del planta y el aeropuerto, vs los air traffic. As part of the mo- national milestone of INYPSA
tráfico aéreo regional. Dentro PPA financieros tan de moda dernization plan, several small in renewable matters and is
del plan de modernización, se en estos tiempos. photovoltaic installations loca- part of the strategic plan im-
incluyen varias instalaciones fo- Este proyecto supone el pri- ted on the roofs of the parking plemented by the Group in
tovoltaicas de pequeño tama- mer hito internacional de IN- lots that have recently been 2017. One of the action lines
ño situadas en las cubiertas de YPSA en materia renovable y se put out to tender are included. of this plan is to focus activ-
los aparcamientos que recien- enmarca dentro del plan estra- But the commitment to clean ities in Latin America, where
temente han salido a licitación. tégico implantado por el grupo energy does not stop here. there is a significant volume
Pero la apuesta por las energías en 2017. Una de las líneas de On November 17, INYPSA of opportunities that adapt
limpias no se queda aquí. acción de este plan, consiste (Spanish group of engineer- to INYPSA’s product and ex-
El pasado 17 de noviembre, en focalizar las actividades en ing, renewable energy, energy perience portfolio. There are
INYPSA -grupo español de em- Latinoamérica, donde existe un efficiency and urban develop- many Spanish companies that
presas de ingeniería, energías importante volumen de opor- ment companies, quoted on have triumphed and are being
renovables, eficiencia energé- tunidades que se adaptan a la the Madrid stock exchange) referents in the renewable en-
tica y desarrollo urbano, coti- cartera de productos y expe- announced the formalization ergy sector in Latin America.
zado en la bolsa de Madrid- riencia de INYPSA. Son muchas of the acquisition of a majority The experience acquired in the
El parque solar
un proyecto de última gene- generará una
ración. „Estamos muy satis-
fechos con el suministro para
energía de
este proyecto tan emblemá- más de 13.246
tico en El Salvador y en la re- MWh al año,
gión, fruto de la colaboración
afianzada en 2017. Confia-
con la que se
mos plenamente en la estrate- podría abastecer
gia puesta en marcha y segui- más de 3.700
remos apoyando los proyectos
que INYPSA desarrolle y/o se hogares
involucre“, comenta Fernando
Calisalvo, director general de logía solar fotovotaica es la
Yingli Green Energy Europe. que mas se ha abaratado de
El parque solar está formado todas las energías renovables.
por 3 plantas equivalentes de Su LCOE (Levelized Cost Of gets involved”, comments Fer- energy produced by photo-
2,1 MW cada una compuestas Electricity) es sin duda uno de nando Calisalvo, CEO of Yingli voltaic solar technology is the
por 6.480 módulos solares, los mas ajustados, como se ha Green Energy Europe. one that has become cheaper
72 seguidores y un inversor, podido comprobar en las re- The solar park consists of 3 from all renewable energies.
que se unifican en una sub- cientes licitaciones de energía equivalent plants of 2.1 MW Its LCOE (Levelized Cost Of
estación de 5 MVA antes de en lugares como México, Chi- each composed of 6,480 so- Electricity) is undoubtedly one
evacuar la energía a 46 kV. le u Oriente Medio. Mediante lar modules,72 followers and of the most adjusted, as it has
Puesto que la energía solar no este acuerdo de suministro, el 1 inverter, which are unified been proved in recent energy
es „maniobrable“, es decir, el aeropuerto es también menos in a 5 MVA substation before tenders in places like Mexi-
sol no luce a gusto del consu- dependiente de los precios del evacuating the energy at 46 co, Chile or the Middle East.
midor, el aeropuerto seguirá petróleo o del gas, que mar- kV. Since the solar energy is Through this supply agree-
conectado a la red de distri- can en gran medida el precio not “maneuverable”, that is, ment, the airport is also less
bución que le abastecerá en de la energía del país. the sun does not look good to dependent on the oil or gas
periodos nocturnos así como Las autoridades de El Sal- the consumer, the airport will prices that greatly mark the
en aquellos momentos en los vador están promoviendo de continue to be connected to price of the country’s energy.
que la radiación solar no sea forma activa la implantación the distribution network that The authorities of El Salvador
suficiente para satisfacer las de renovables en el país. Ya en will supply it in night periods are actively promoting the im-
necesidades del aeropuerto. 2014 impulsaron una primera as well as in those moments plementation of renewables
Todo esto conseguido si que subasta de energía con 100 in which the solar radiation in the country. In 2014, they
usted, como pasajero, perciba MW adjudicados. En 2017 le does not be enough to meet launched a first energy auc-
la más mínima incidencia en siguió otra subasta con 119 the needs of the airport. All tion with 100 MW awarded.
sus servicios y manteniendo la MW. La iniciativa privada this achieved if you, as a pas- In 2017, another auction with
calidad de suministro. también está siendo pro acti- senger, perceive the slightest 119 MW followed. The pri-
Además de dar una imagen va gracias a que la legislación impact on your services and vate initiative is also proactive
moderna y respetuosa con el permite la figura del IPP (Inde- maintaining the quality of because the legislation allows
medio ambiente, los benefi- pendent Power Producer). De supply. the figure of the IPP (Indepen-
cios del proyecto para el ae- esta forma, un generador y In addition to giving a mod- dent Power Producer). In this
ropuerto son también econó- un consumidor pueden llegar ern and environmentally way, a generator and a con-
micos. La bajada de precios de a acuerdos de compra-venta friendly image, the benefits sumer can reach power pur-
los componentes principales, de energía, que permitan la of the project for the airport chase agreements that allow
así como una mayor eficien- construcción de proyectos y su are also economic. The lower the construction of projects
cia de los mismo, hacen de la financiación. En definitiva, El prices of the main compo- and their financing. In short, El
energía solar una tecnología Salvador es de los países más nents, as well as their higher Salvador is one of the most ac-
de generación muy competi- activo en energías limpias de efficiency, make solar energy tive countries in clean energy
tiva a día de hoy. Los paneles Centroamérica. El proyecto a very competitive genera- in Central America. The Talpa
fotovoltaicos son casi 10 veces Talpa Solar de INYPSA en el tion technology today. Pho- Solar project of INYPSA at the
más baratos de lo que eran Aeropuerto será sin duda un tovoltaic panels are almost 10 Airport will undoubtedly be a
hace 10 años. Según la Agen- referente en la región contri- times cheaper than they were benchmark in the region, con-
cia Internacional de Energía buyendo a dar del aeropuerto 10 years ago. According to tributing to give the Airport a
Renovable (IRENA), la energía una imagen moderna y soste- the International Renewable modern and sustainable im-
producida mediante tecno- nible Energy Agency (IRENA), the age
EIFFAGE ENERGY
TO BUILT A
103 MW PV
SOLAR PLANT IN
ATACAMA DESERT
EIFFAGE ENERGÍA In August 2018 the works of the Huatacondo
Photovoltaic Plant in Pozo Almonte (Chile) built
CONSTRUYE UNA by Eiffage Energy will be completed
PLANTA SOLAR
I
n the coming month of Eiffage Energía Chile, subsi-
ATACAMA
subsidiaries, Eiffage Conces- Huatacondo photovoltaic
sions and Eiffage Energía, with plant joins other projects that
an investment of 135 million Eiffage Energía is carrying
euros. out in the country of Chile:
En agosto de 2018 concluirán las obras de The photovoltaic power PV plant in Quilapilún (110
plant will have more than MW); PV solar plant Crucero
la Planta Fotovoltaica Huatacondo en Pozo
300.000 solar panels and its (72 MW); PV park Javiera (69
Almonte (Chile) construida por Eiffage Energía. installations will occupy about MW); PV solar installation San
150 hectares. Located at kilo- Andrés (50 MW); the high
metre 1,697.4 of route 5, in voltage overhead power line
E
l próximo mes de agos- Durante 30 años, las obras y the commune of Pozo Almon- for the Wind Farm at Punta
to está previsto que el mantenimiento de la plan- te, it is one of largest solar Palmeras (45 MW); and the
concluyan las obras de ta serán ejecutadas por Eiffa- plants in the region. Electric EPC, substation and
la planta fotovoltaica Huata- ge Energía Chile, que cuenta For 30 years, the works and high voltage overhead power
condo ubicada en el desierto con amplia experiencia en la maintenance of the plant will line for the Wind Farm Sierra
de Atacama, en Chile, cons- ejecución y gestión de gran- be performed by Eiffage Ener- Gorda.
truida por Eiffage a través de des proyectos dentro de las gía Chile, which has extensive In 2013 SunEdison asked
sus dos filiales, Eiffage Con- áreas de energía, obra civil y experience in implementing Eiffage Energía to construct
cessions e Eiffage Energía, con construcción. and managing large projects Sand Andrés in Copiapó, then
una inversión de 135 millones El proyecto de esta central in the areas of energy, civil en- came the solar plant Crucero,
de euros. fotovoltaica (103 MW) forma gineering and construction. Javiera, and finally Quilapilún.
La central fotovoltaica de parte del programa ‘Energía The project of this photo- From the first project in Chi-
Huatacondo contará con más 2050’ de Chile, cuyo objeti- voltaic power plant (103MW) le, Eiffage Energía decided to
de 300.000 paneles solares vo es producir el 70% de la is part of Chile’s program establish itself in the country
y sus instalaciones ocuparán electricidad con energías re- ‘Power 2050’, whose objecti- as it is a leading nation in La-
cerca de 150 hectáreas. Si- novables para el año 2050. ve is to produce 70% of elec- tin America and very socio-
tuada en el kilómetro 1.697,4 A medida que el país se de- tricity with renewable energy politically stable with a target
de la ruta 5, en la comuna de sarrolla económicamente, au- sources by the year 2050. As of 20% of renewable energies
Pozo Almonte, es una de plan- mentan sus necesidades de the country develops econo- by 2025.
tas solares más grandes de la electricidad. mically, its electricity needs Each of the actions carried
región. increase. out help the company conti-
Pérgolas Solares PV
Recarga de vehículos eléctricos con energía fotovoltaica
[email protected] circutor.com
Tel. 937 452 900 39
energética XXI · 175 · ABR/APR18
Tecnología para la eficiencia energética
ESPECIAL AMÉRICA LATINA / LATAM SPECIAL EDITION: SOLAR PV
SOLARPACK tan cada año la emisión a la SOLARPACK than 25,000 tons of atmos-
atmósfera de más de 25.000 pheric CO2 a year.
C C
alama Solar I está ope- toneladas de CO2. alama Solar I has been The Calama Solar I and Puerto
rativa desde marzo de En las plantas de Calama So- operating since March Seco Solar plants are equipped
2017 y genera 30.600 lar 1 y Puerto Seco Solar se han 2017 and generates with around 64,000 330-watt
MWh al año de energía limpia. instalado unos 64.000 módu- 30,600 MWh of clean energy a polycrystalline silicon modules.
Por su parte, Puerto Seco Solar los de 330 vatios cada uno de year. Puerto Seco Solar, mean- The plants also have tracker
se puso en servicio a finales de silicio policristalino. Asimismo, while, entered service at the end technology to optimize genera-
junio de 2017. Se trata de la cuentan con la tecnología de of June 2017. It is the company’s tion. The whole system is highly
sexta planta solar en funciona- seguimiento del sol que permite sixth plant in Chile and it gene- automated and is monitored
miento de la compañía en Chi- optimizar la generación. Todo el rates a further 30,600 MWh a continuously from Solarpack’s
le y genera otros 30.600 MWh sistema está altamente automa- year, on top of the output from global control centers.
anuales y adicionales a los de tizado y es monitoreado conti- Calama Solar I. In total, the The energy generated by the
Calama Solar I. El conjunto de nuamente desde los centros de plants that Solarpack has deve- plants is sold to the Chilean
plantas desarrolladas y cons- control globales de Solarpack. loped and built in the Andean electricity system under a sta-
truidas por Solarpack en la La energía generada por las region generate more than bilized nodal price scheme.
región Andina generan anual- plantas se vende al sistema 300,000 MWh a year. Within this scheme, plants of
mente más de 300.000 MWh. eléctrico chileno, bajo el es- The generation from Calama up to 9 MW have the option of
La generación de las plantas quema de precio estabilizado Solar I and Puerto Seco Solar adopting a fixed-price energy
Calama Solar I y Puerto Seco de nudo. Bajo este esquema, equals the consumption of generation methodology that is
Solar equivale al consumo de la plantas de hasta 9 MW no- 20,000 Chilean homes and maintained for six months and
20 mil hogares chilenos y evi- minales tienen la opción de avoids the emission of more is based on the average selling
Descubre el nuevo
eBick 48
Tecnología Litio-Ion de CEGASA
La nueva solución de almacenamiento modular
y escalable de CEGASA para aplicaciones de
autoconsumo y aisladas entre 9 y 206 kWh.
[email protected]
energética XXI · 175 · ABR/APR18 41
www.cegasa.com
ESPECIAL AMÉRICA LATINA / LATAM SPECIAL EDITION: SOLAR PV
IGNACIO BLANCO CUESTA población, la mejora de las IGNACIO BLANCO of the population, the impro-
PRESIDENTE Y CEO DE UNIVERGY condiciones de vida de sus PRESIDENT &CEO OF UNIVERGY vement of the conditions of
INTERNACIONAL INTERNATIONAL
habitantes y el crecimiento de life of their inhabitants and
L T
os países de América la actividad económica están he countries of Latin the growth of the economic
Latina tendrán que au- siendo el motor que hace cre- America will have to in- activity are being the motor
mentar su capacidad cer significativamente la de- crease their capacity of that lets grow the power de-
de generación eléctrica en manda energética. Pero, para electrical generation in a 70% mand significantly. But, to be
un 70% para el 2030 y para ser capaces de alcanzar el ni- for the 2030 and for that it able to reach the level of suffi-
eso hará falta mucha energía vel de inversión económica su- will be necessary much energy cient economic investment,
e inversión. El aumento de la ficiente, el sector energético y and investment. The increase the power sector and the go-
ISRAEL DUVAL
RESPONSABLE DE COMUNICACIÓN centros de procesado de arroz INNERGY Among the multiple bene-
Y MARKETING. INNERGY
de los que dispone Agri-corp. fits that this type of electrical
T
Entre los múltiples benefi- he pioneer installation, generation facilities produces
L
a pionera instalación, ca- cios que produce este tipo de capable of generating 1.2 through the use of biomass,
paz de generar 1,2 MW instalaciones de generación MW of electricity through these are the 4 most impor-
eléctricos mediante el eléctrica por medio del uso de the use of rice husk as fuel, will tant ones worth mentioning:
uso de cáscara de arroz como biomasa cabe destacar los 4 be located in the northwest of • Reduction of the cost of
combustible, se ubicará al no- de mayor importancia: the country, in the Chinandega energy supply.
roeste del país, en la región • Reducción del coste de su- region in one of the rice proces- • Valorization of what was
de Chinandega. En uno de los ministro energético. sing centers of Agri-corp. once a waste to become
minimizar los efectos de la Que una empresa de Nicaragua rica, not only for its modern
abrasión y la corrosión. systems, but also for its res-
• Optimo diseño y regulación
instale una planta de generación pect for the environment.
automática de la inyección eléctrica con biomasa por medio un Today, 18 years later, it con-
de aire y gases recirculados módulo ORC nos dice que los países tinues to set an example of
para una combustión par- corporate social responsibility
cial en suspensión. de Latinoamérica empiezan a poner with the installation of this bio-
• Cámaras de poscombus- el foco en la eficiencia energética para mass power generation plant.
tión e inyección de aire ter- Without a doubt, it will be a
ser más competitivos
ciario para un largo tiem- showcase to demonstrate, not
po de permanencia que only the environmental advan-
resulte en una combustión The fact that a Nicaraguan company tages, but also the reduction in
completa y una reducción production costs generated by
de emisiones
installs an electric power plant with a well optimized ORC plant.
• Alimentación automática biomass through an ORC module On the other hand, Innergy,
de combustible mediante tells us that Latin American countries a Spanish company with two
doble sinfín para una fina hundred employees, that de-
y precisa regulación.
are beginning to focus on energy signs and manufactures this
Agri-corp, que cuenta con efficiency to be more competitive type of plant for decades. It will
varios centros de producción manufacture all the equipment
para el procesado de arroz, ha- Por otro lado, Innergy, em- for a long residence time re- at its headquarters in Valencia,
rina y sal entre otros, es capaz presa española de doscientos sulting in complete combus- but will take advantage of sy-
de generar una capacidad de empleados que diseña fabrica tion and reduced emissions nergies with its subsidiaries in
secado superior a las 25.000 e instala este tipo de plantas • Automatic fuel feed Japan and Chile, to install some
toneladas de arroz al mes. desde hace décadas, fabri- through double auger for of the improvements they have
Además, desde sus inicios en cará todos los equipos en su fine and precise regulation. been developing and testing in
el año 2000 ha demostrado ser sede central de Valencia, pero Agri-corp, which has several recent months. According to
una empresa socialmente res- aprovechará sinergias con sus production centers for the pro- the Technical Director, the fluid
ponsable. Son los creadores e filiales de Japón y Chile para cessing of rice, flour and salt, and combustion tests of the
impulsores del programa PAPA, instalar algunas de las mejoras among others, it is capable of material carried out in the pilot
“Programa de Apoyo a Produc- que han estado desarrollando generating a drying capacity plant have been positive and
tores de Arroz“; éste consiste y testeando los últimos meses. of more than 25,000 tons of verify the calculations made
en la compra de arroz en gran- Según el director Técnico, las rice per month. In addition, previously.
za nacional, las que se realizan pruebas de fluido y combus- since its inception in 2000, The fact that a Nicaraguan
por medio de transacción de la tión del material realizadas en it has proven to be a socially company installs an electric
Bolsa Agropecuaria (BAGSA) la planta piloto, han sido posi- responsible company. They are power plant with biomass
beneficiando a 17 mil produc- tivas y verifican los cálculos rea- the creators and promoters of through an ORC module tells
tores nicaragüenses. En 2001, lizados con anterioridad. the PAPA program, ‘Program us that Latin American coun-
construyeron el primer molino Que una empresa de Nica- of Support to Rice Producers’ tries are beginning to focus on
automatizado del país, siendo ragua instale una planta de which consists of the purcha- energy efficiency to be more
uno de los más importantes generación eléctrica con bio- se of rice from national farms, competitive. They are taking
de Latinoamérica, no solo por masa por medio un módulo those that are made through firm steps that will allow them
sus modernos sistemas, sino ORC nos dice que los países transaction of the Agricultural to work in their sector and in
también por su respeto por el de Latinoamérica empiezan a Exchange (BAGSA) benefi- international markets, with an
medio ambiente. poner el foco en la eficiencia ting 17 thousand Nicaraguan advantage when it comes to
Hoy, 18 años después, sigue energética para ser más com- producers. In 2001, they built supplying electricity or heat,
dando ejemplo de responsabi- petitivos. Están dando firmes the first automated mill in respecting the environment,
lidad social corporativa con la pasos que les van a permitir the country, being one of the and with less uncertainty about
instalación de esta planta de trabajar en su sector y en los most important in Latin Ame- their production costs
generación eléctrica con bio- mercados internacionales, con
masa. Sin duda, será un escapa- ventaja a la hora de abastecer-
rate para demostrar no solo las se de electricidad o calor, res-
ventajas medioambientales sino petando el medio ambiente, y
también la reducción en costes con una menor incertidumbre
de producción que genera una sobre sus costes de produc-
planta ORC bien optimizada. ción
UN VERTEDERO A LANDFILL IN
EN CHILE GENERA CHILE GENERATES
2 MWH GRACIAS 2 MWH THANKS
A LA LIMPIEZA TO THE CLEANING
DEL BIOGÁS OF BIOGAS
Dim Water Solutions, empresa hermana Dim Water Solutions, a sister company of
de Dimasa Grupo, y especializada en el Dimasa Grupo, specializing in the treatment of
tratamiento de aguas residuales y biogás, ha wastewater and biogas, has supplied Finning, a
suministrado a Finning, empresa perteneciente company belonging to the powerful industrial
al poderoso grupo industrial Caterpillar, una group Caterpillar, a biogas cleaning unit.
unidad de limpieza de biogás.
T
his is a process neces- of the comprehensive imple-
E
ste es un proceso nece- y quema de biogás situada en sary to transform the mentation of a sustainability
sario para transformar la Unión para la empresa KDM. biogas generated in a strategy.
el biogás generado en Esta solución tecnológica landfill into a biofuel suita- In addition, this work is in
un vertedero en un biocom- para Finning destaca por ve- ble for combustion engines, addition to others already
bustible apto para motores de nir totalmente integrada en which allows to take advan- made in Chile, where Dimasa
combustión, lo que permite un contenedor de 40 pies, tage of energy resources and Grupo has its own commer-
aprovechar recursos energéti- lo que permite que sea fácil- to maintain the care for the cial delegation. Thus, a biogas
cos y mantener el cuidado por mente transportable por envío environment. burning and analysis plant
el medio ambiente. marítimo. Una located in the Union for the
Este tipo de soluciones se ha de sus caracte- KDM company was designed
convertido en los últimos años rísticas es que, and manufactured.
en una de las especialidades para aumentar This technological solution
del grupo Dimasa, destacando la seguridad, for Finning stands out by co-
su trabajo en la Planta Trata- vienen separa- ming fully integrated in a 40-
dora de Aguas Residuales de das la parte de foot container, which allows it
Atotonilco, en México, la ma- control eléctrico to be easily transportable by
yor del mundo en su categoría. y la de los equi- shipping. One of its characte-
En dicha instalación Dimasa pos de trata- ristics is that, to increase safe-
Grupo desempeñó una fun- miento. La uni- ty, the electrical control part
ción fundamental, siendo uno dad de limpieza de biogás ha This type of solutions has and the treatment equipment
de sus mayores proveedores. sido totalmente probada en become in recent years one of are separated. The biogas clea-
Y en parte gracias a su apor- las instalaciones de la empresa the specialties of the Dimasa ning unit has been fully tested
tación a la limpieza de bio- en Vacarisses, y garantiza una Grupo, highlighting its work at the company’s facilities in
gás, el Banco Interamericano capacidad de tratamiento de in the Wastewater Treatment Vacarisses, and guarantees a
de Desarrollo (BID) otorgó el 1.000 Nm³/h, lo cual generará Plant of Atotonilco in Mexico, treatment capacity of 1,000
‘Premio Infraestructura 360°’ 2 MWh de potencia eléctrica. the largest in the world in its Nm³/h, which will generate 2
como reconocimiento a la im- Este contenedor se ha insta- category. In this installation MW/h of electrical power.
plementación integral de una lado en el vertedero (relleno Dimasa Grupo played a fun- This container has been ins-
estrategia de sostenibilidad. sanitario) de Lepanto, muy damental role, being one of its talled in the landfill of Lepan-
Además, este trabajo se suma cercano a la capital Santiago major suppliers. And thanks to, very close to the capital
a otros ya realizados con ante- de Chile, y con la puesta en in part to its contribution to Santiago de Chile, and with
rioridad en Chile, donde Dimasa marcha a cargo de Dim Water biogas cleanup, the Inter- the start-up by Dim Water So-
Grupo cuenta con delegación Solutions, la limpieza del bio- American Development Bank lutions, the biogas cleaning is
comercial propia. Así, se diseñó gás ya está en funcionamiento (IDB) awarded the 360° Infras- already in operation and at full
y fabricó una planta de análisis y a pleno rendimiento tructure Award in recognition capacity
T
he project commissio- patients and the doctors and
ned by the Ecuadorian nurses that care for them. It is
E
l proyecto, obra del Ins- energía eléctrica, aseguran- national health service obviously vital that these types
tituto Ecuatoriano de do en todo momento que el (IESS), is today a reality, and of buildings can continue
Seguridad Social (IESS), médico o cualquier otro pro- benefitting the residents of to function and must not be
es hoy una realidad de la que fesional sanitario siga con su south Quito, in the El Recreo brought to a standstill.
se beneficia la población del trabajo con normalidad con district. This publicly owned The high consequences of
sur de Quito, del distrito de el fin de que el paciente esté hospital with over 400 beds a power cut mean it is essen-
El Recreo. En el Hospital Qui- debidamente atendido. and 50 consultation areas, tial to install back up systems
to Sur, de titularidad pública employs 1800 people. Each that will continue to supply
y con capacidad para más de Objetivo del proyecto one of the 5 buildings within electricity to all the systems,
400 camas y medio centenar Es por todo esto que el clien- the complex contains a Gene- ensuring the medical teams
de consultas, trabajan 1.800 te necesitaba generadores sal Energy emergency power and doctors can continue their
funcionarios. En cada uno de de arranque automático de genset. work ensuring that patients
los cinco edificios que dan for- emergencia y Genesal Ener- Power cuts in hospitals can continue to receive healthcare.
ma al complejo hay un gene- gy diseñó cinco generado- lead to critical situations for
rador de emergencia Genesal Project Aims
Energy. Due to the risks presented by
Los fallos de la red eléctrica a power cut the client required
en los hospitales provocan si- a solution that would incor-
tuaciones críticas, tanto para porate gensets with automa-
los pacientes como para los tic start-up (AMF). GENESAL
equipos médicos. Ante cual- ENERGY designed five genera-
quier corte de suministro este tor sets with different voltages
tipo de edificios deben seguir and power ratings, to meet
manteniendo su actividad, no the client needs in relation
pueden pararse. to the different load require-
Por este motivo es necesario ments for each building. The
instalar sistemas de backup objective; a guaranteed power
que continúen suministrando supply in the event of a mains
Huguette Kolb-Aust
Head of Sales Solar & Energy at Steca Elektronik
ALL-IN-ONE
Steca Solarix PLI
INTERSOLAR EUROPE
BECOMES THE SMARTER
E EUROPE, THE
TOMORROW’S ENERGY
WORLD EXHIBITION
INTERSOLAR EUROPE
SE INTEGRA EN THE
T
he premiere of The tor integration of individual
smarter E Europe marks energy sectors will take cen-
SMARTER E EUROPE,
the beginning of a new ter stage. Photovoltaics (PV),
era: With four energy exhibi- wind, storage, infrastructure
tions, the innovative platform and consumption can no lon-
LA FERIA SOBRE LA will showcase the key topics
of tomorrow’s energy world.
ger be considered in isolation.
Instead, new ideas are needed
C
on el estreno de The fotovoltaica y eólica, los sis- be in clear evidence on the ex- decentralization and sector
smarter E Europe co- temas de almacenamiento, la hibition floor, offering plenty coupling, The smarter E Euro-
mienza una nueva era: infraestructura y el consumo of material for discussion. pe Conference covers future-
cuatro ferias especializadas en ya no se pueden considerar de The innovative platform The oriented topics that are indis-
energía presentarán en esta forma aislada. Por el contrario, smarter E Europe in Munich pensable for the success of a
plataforma de innovación hacen falta nuevas ideas sobre is the ideal meeting point for modern energy world. These
los temas fundamentales del cómo estas áreas pueden se- international players in the core areas of focus are com-
mundo de la energía del ma- guir fusionándose y funcionar new energy world. Starting in plemented by presentations
ñana. La cada vez mayor in- de forma coordinada entre sí. 2018, the organizers are com- on blockchain trading cen-
tegración entre las áreas de la Con la digitalización, la des- bining the established Interso- ters for green power, energy
generación, el almacenamien- centralización y el acoplamien- lar and ees Europe events with clouds and cyber security in
to, la distribución inteligente to intersectorial, The smarter E two new exhibitions – Power- the digitalized energy sector.
y el uso de las energías reno- Europe Conference tratará te- 2Drive Europe and EM-Power The smarter E Europe and
vables quedará reflejada en el máticas que son decisivas para – to create a platform that the four energy exhibitions
evento. Para los actores inter- el futuro e imprescindibles covers the new energy world will take place from June 20-
nacionales del nuevo mundo para el triunfo de un mundo as a whole. At The smarter E 22, 2018 at Messe München
energético, la plataforma de energético moderno. Estos te- Europe, the close, cross-sec- (Munich, Germany)
innovación The smarter E Eu- mas fundamentales se verán
rope, en Múnich, es el punto completados con conferencias
de encuentro ideal. A partir sobre los centros de negocia-
de 2018, los organizadores ción de bloques de cadena
suman a las ferias ya consoli- (blockchain) para la electrici-
dadas Intersolar y ees Europe dad ecológica, la cibersegu-
las nuevas ferias especializa- ridad en el sector energético
das Power2Drive Europe y digitalizado o las ‘nubes de
EM-Power. De esta forma con- energía’ (energy clouds).
centran en un mismo lugar The smarter E Europe y los
el nuevo mundo energético cuatro eventos sobre energía
al completo. El evento centra que la componen se celebra-
su atención, sobre todo, en la rán simultáneamente entre el
estrecha interrelación entre los 20 y el 22 de junio de 2018 en
distintos sectores de la ener- la Messe München (Múnich,
gía. Y es que hoy la energía Alemania)
EMPRESA/COMPANY
La nueva BYD Battery Box LV es un sistema de The new BYD Battery Box LV is a 48 volt lithium
almacenamiento a 48v que emplea el exitoso storage system which employs the successful BYD
sistema modular patentado por BYD, con un patented modular design, with battery capacities
BYD
rango de capacidades de entre 3,5 y 14 kWh. Es ranging from 3.5 to 14 kWh. The capacity can be
posible alcanzar una capacidad máxima de 42 kwh scaled up to 42kWh with three systems connected in
conectando 3 sistemas en paralelo. parallel.
EMPRESA/COMPANY
La línea de baterías solares Deka de MK Battery MK Battery’s Deka Solar line includes sealed lead
incluye baterías de Gel, AGM y baterías abiertas. El acid GEL and AGM batteries and select flooded
nuevo Ultrabattery es un dispositivo híbrido: una products. The new UltraBattery is a hybrid device – a
MK BATTERY combinación química de una batería AGM de plomo- chemical combination of a lead-acid AGM battery
ácido y un ultra-capacitor, logrando una operación and an ultra-capacitor, achieving higher-rate, partial-
de mayor energía y de estado parcial de carga con state-of-charge operation with extended longevity
longevidad extendida y alta eficiencia. and high efficiency.
EMPRESA/COMPANY
Los visualizadores de la serie XC410 de Siebert- Widely visible the digital displays of the XC410
Solar ampliamente visibles muestran con dígitos Siebert-Solar series visualize, with brilliant 25 mm
LED brillantes de 25 mm el rendimiento actual high LED digits, the current performance of the solar
del sistema solar, así como la producción total de system as well as the total energy produced and the
SIEBERT GROUP energía y la reducción de CO2 desde la puesta en CO2 reduction since start-up. Optionally the daily
funcionamiento. Existe la opción de visualización de energy can be displayed. In an exposed position
la energía diaria generada. Colocados en el vestíbulo in the foyer or in the entrance hall, they make the
o entrada del edificio, cumplen con el objetivo de commitment of the investor in renewable energy
hacer visible la energía renovable del inversor. visible.
T
Rural y Sostenibilidad. he challenge in this pro- project is to promote resi-
ject lies in the integra- dential photovoltaic self-con-
tion and optimization sumption through an optimal
OCTAVIO CABELLO eléctricas menos estables pero of photovoltaic production storage solution. To this end,
Y FRANCESCO OLIVA
con necesidades crecientes with energy storage systems, different types of solutions will
ZEROAPLUS de energía y donde grandes this combination being able to be tested in different pilot si-
E
l desafío en este pro- intervenciones pueden provo- eliminate the restrictions that tes, taking into account local
yecto se encuentra en car impactos ambientales no the availability of a stable elec- parameters (social, economic,
la integración y opti- admisibles. Para el desarrollo tric power supply may pose in technical) for the optimization
mización de la producción fo- del mismo, Sarga cuenta con certain areas and also address and efficiency of particular
tovoltaica con los sistemas de las asistencia de la consultora the problem inherent in re- solutions.
almacenamiento energético, Zeroaplus y la empresa IASOL. newable energies due to their What has been the activity
pudiendo con esta combina- intermittence in production. so far in the StoRES project?
ción eliminar las restricciones ¿Cuál es el objetivo The project focuses on rural The first part of the project
que puede suponer en deter- general de StoRES? areas with less stable electrical has been theoretical. Much
minadas áreas la disponibili- El objetivo general de este pro- grids, but which have growing of the effort has been spent
dad de un suministro estable yecto es impulsar el autocon- energy needs and where large on studying the “state of the
de energía eléctrica y también sumo fotovoltaico residencial interventions could cause an art” and the existing situation
abordar la problemática in- a través de una solución ópti- unacceptable degree of en- for each country of renewable
herente de las energías reno- ma de almacenamiento. Para vironmental impact. For the energy policies and technical
vables por su intermitencia ello se van probar diferentes development of the same, and economic barriers to the
en la producción. El proyecto tipologías de soluciones en Sarga has the assistance of implementation of energy sto-
hace incidencia en áreas ru- diferentes sitios piloto tenien- the consultant Zeroaplus and rage systems, especially for
rales conectadas con redes do en cuenta en cada uno los the company IASOL. the use of photovoltaic energy
and batteries together. Eco- nels (1) feed the lithium stora-
nomic information has been ge system continuously (6), by
collected concerning the ins- means of a sensor in the panel
tallation of these systems, ta- (7), receive the information on
xes, duties, aids, the cost of the electrical demand from
electricity in each area and the the grid and decide how much
price or cost of selling the sur- of the energy produced is sto-
plus energy to the grid. red and which is transferred to
All this information has ser- the consumption (3) through
ved as a starting point for the the inverter (2).
design of technical solutions When there is no photovol-
that are being implemented taic production, the system
Figura 1 / Figure 1.
in the pilots, for the design of gives up all the stored energy
the online tool for the calcu- to consumption until it com-
parámetros locales (sociales, El proyecto hace lation of solutions and for the pletely empties the battery.
económicos, técnicos) para la cost-benefit analysis of the The system has been designed
optimización y eficiencia de
incidencia en installations. to make complete loading/un-
las soluciones particulares. áreas rurales This initial work has now loading cycles every day and
conectadas con been completed and a se- is regulated so that it reaches
¿Cuál ha sido la cond, more practical phase 100% load approximately
actividad hasta ahora en redes eléctricas has begun with the prepara- when the sun disappears.
el proyecto StoRES? menos estables tion of pilot actions in six re- The main equipment
La primera parte del proyecto gions of Cyprus, Greece, Italy, used was Fronius inverters
ha sido teórica y gran parte del
pero con
Portugal, Slovenia and Spain. and lithium batteries from
esfuerzo se ha empleado en necesidades In this article we will describe SolarWatt.
estudiar el estado del arte y la crecientes de the different solutions already In the following photo, we
situación existente para cada implemented in 5 countries, can see how the typical ins-
país de las políticas sobre ener-
energía leaving for later the analysis of tallation of these teams looks
gías renovables y las barreras the first data we receive from like in these drivers.
técnico-económicas para la im- these analyses.
plementación de sistemas de Pilots in Greece
almacenamiento de energía, de acciones piloto en 6 regio- What are the general In Greece, five pilot have been
particularizado especialmente nes de Chipre, Grecia, Italia, characteristics of the developed, all of them with
para el uso de la energía foto- Portugal, Eslovenia y España. installed pilots? three-phase
voltaica y las baterías. Se ha re- En este artículo vamos a entrar existing photovoltaic sys-
cogido información económica en describir las diferentes solu- Pilots in Spain tems. Three pilots have been
concerniente a la instalación ciones ya implementadas en 5 The pilots led by the Spanish installed in public buildings
de estos sistemas, tasas, im- países, dejando para artículos team are all in the province of and two in private buildings,
puestos, ayudas, al coste de la posteriores el análisis de los Zaragoza. Specifically, three one for residential use and a
energía eléctrica en cada zona primeros datos que recibamos of them have been made in second one for a pharmacy
y al precio o coste de venta a la de estos análisis. single-family houses in Zara- store.
red de la energía sobrante. goza, another in a house in The existing installations
Toda esta información ha ser- ¿Cuáles son las Sádaba and a last one in Lan- have a peak nominal capacity
vido como punto de partida características generales ga de Castillo in a house whe- of 10 kWp in three of them
para el diseño de soluciones de los pilotos instalado? re there is also a small cheese and the other ones with a 5
técnicas que se están imple- production facility. The peak kWp and a 20 kWp.
mentando en los pilotos, para Pilotos en España photovoltaic power installed Two systems use the Fronius
el diseño de la herramienta Los pilotos liderados por el on the pilots is between 3.18 three-phase inverter, which
online para el cálculo de las equipo español están realiza- kWp and 5.50 kWp. A stora- operates like a battery inver-
soluciones y para los análi- dos todos en la provincia de ge system based on 8.8 kW ter (AC coupling). The battery
sis de costo-beneficio de las Zaragoza. En concreto, tres lithium batteries has been im- unit is Fronius Solar Battery
instalaciones. de ellos han sido realizados en plemented on them, except 7.5 (Li-ion batteries) consisting
Concluidos ya estos traba- viviendas unifamiliares de Zara- for one which has been redu- of five similar modules with a
jos iniciales, se ha comenzado goza, otro en una vivienda de ced to 4.4 kW. capacity of 1.5 kWh each. The
una segunda fase más práctica Sádaba y un último en Langa The operating diagram is as mounted system is shown in
consistente en la preparación de Castillo en una vivienda follows: The photovoltaic pa- photo 2.
Pilotos en Portugal
En Portugal se han instalado
cinco sitios piloto similares en
edificios residenciales con un
sistema fotovoltaico de auto-
consumo existente. La capaci-
dad de cada planta de energía
fotovoltaica era de 1,5 kWp (6
módulos de 250 Wp). Se inte-
gró un sistema de almacena-
miento monofáiscio 1-2.5 kVA,
SonnenBatterie eco 8.2.
Los pilotos fueron instalados
en el sur de Portugal–región de
Algarve
La descripción de la opera-
ción básica del sistema se expli- Foto 3 / Image 3.
GRABISA es una empresa de referencia en España en el negocio de los tintes. A mediados de los años sesenta, los
hermanos Millán, Antonio y José, fundan GEISA, S.L en Terrassa. Con el tiempo y la voluntad de mejorar continuamente
sus productos y controlar todo el proceso de fabricación, GEISA adquirió GRABISA Tintes y Acabados, S.L, empresa
situada en Burgos, que actualmente cuenta con un amplio parque de maquinaria para el tinte y acabado. La lubricación
de los motores a gas de esta planta es, desde hace tiempo, responsabilidad de Cepsa, dada la confianza generada
a lo largo de los años como especialistas en lubricación, no sólo por la calidad de sus productos sino también por el
servicio de análisis del lubricante en servicio que ofrecen. Desde entonces se mantiene una sólida colaboración que
continuará en el futuro.
D
esde un primer momento la em- una vez realizada la inversión, la obtención P. ¿Qué tipos de motores utiliza la ins-
presa tuvo claro que los costes de ese calor es gratuita. Cuando Grabisa talación y cuáles son sus características?
energéticos serían un factor cla- comenzó a funcionar, en el año 2000, la R. Contamos con motores de explosión, al-
ve para el funcionamiento de la compañía incorporación de la cogeneración permitió ternativos, de gas natural, que es una tec-
y su competitividad en el mercado textil que la empresa no cerrase. De hecho, este nología que no tiene mayores problemas,
internacional. Esa visión estratégica de la tipo de empresas ya casi no existen en Es- está muy desarrollada y probada. Tenemos
gestión energética llevó a GRABISA a to- paña debido a la gran demanda térmica dos motores Deutz TBG 632 y dos motores
mar la decisión de poner en marcha una que necesitan y su elevado coste. Se trata Jenbacher 620. En total contamos con 13
instalación de cogeneración que ha ga- de un coste añadido que muchas empre- MW de potencia instalada. Los motores
rantizado la existencia de la compañía en sas no han podido soportar en el precio se adquirieron hace 19 años en función de
todos estos años. final de su producto. Sin la cogeneración, los costes y otros factores de rentabilidad.
esta industria no es viable. Es en este tipo
Pregunta. ¿Qué impulsó a la empresa a de empresas donde la cogeneración verda- P. ¿En qué momento comienza la colabo-
dar el paso y convertirse en una indus- deramente tiene sentido, ya que la coge- ración entre GRABISA y Cepsa y cuáles
tria cogeneradora? neración ideal se da en las industrias cuyo han sido las causas que han permitido
Respuesta. La empresa se dedica exclusi- diseño es de una kilocaloría (kcal) por de- mantener esta relación en el tiempo?
vamente a la industria textil y el tratado de bajo de sus necesidades. Calculamos que, R. El 12 de noviembre de 2001 comenza-
tela; por ese motivo, necesita de muchísi- gracias a esta instalación, hemos consegui- mos a trabajar con Cepsa, un año después
mo calor. Para bajar los costes de produc- do reducir en un millón de euros los gastos de que se pusiera en marcha la instalación.
ción se necesitaba obtener ese calor a pre- en gas gracias al aporte térmico que reali- Cuando hablamos de trabajar con aceites,
cios más bajos. Gracias a la cogeneración y zamos con la cogeneración. en realidad hay que tener en cuenta dos
cosas que son vitales: la vida útil del lubri- instalación de cogeneración como esta? en el que aceite todavía está bien pero ve-
cante; y el cambio de filtros. Si cambias el R. En estos años, el aceite de Cepsa Tron- mos por nuestra experiencia que es mejor
aceite cuando procede, no hay problema. coil Gas 40 ha cumplido perfectamente las cambiarlo, lo hacemos, para que el equipo
El problema es cuando fuerzas el aceite, expectativas, por eso no hemos cambiado no corra ningún riesgo. Sin duda, forzar un
algo que realmente no merece la pena por en todo este tiempo. Tanto por coste como motor debido al aceite no merece la pena.
coste económico, ya que en una industria por servicio, nos proporciona un rendi- Es totalmente contraproducente, tanto
como ésta el coste anual del aceite raya miento y protección óptimos en nuestros por costes como por riesgos.
lo despreciable. El consumo de aceite por motores. Además, para realizar un mante-
kilovatio producido de media en un año nimiento de calidad es indispensable reali- P. ¿Cómo afectaría a la producción de la
es 0,2 gramos/kWh, es decir, muy poco. zar análisis periódicos de aceite, nosotros planta una avería en los motores y, por
Realizar un mantenimiento adecuado, res- los realizamos cada 500 horas con el sis- tanto, la falta de suministro de calor y
petando los periodos de cambio tanto del tema de diagnóstico SIPAT que nos ofrece electricidad?
aceite como de los filtros es fundamental. Cepsa. Si llegamos a un número de horas R. Esto supondría un coste muy importante
para la empresa. Además, se tar-
P. ¿Por qué cree que es impor- daría de seis meses a un año en
tante la inversión en un acei- poder incorporar un motor nue-
te de mayor calidad en una vo. Si calculas todo ello en dinero,
aplicación tan crítica como es sin duda sería muchísimo. El cos-
la generación de energía? te de producir el calor que necesi-
R. Estructuralmente, los moto- tas sin usar motores, con calderas
res son muy simples y hay que por ejemplo, sería muy elevado,
ser cuidadosos. Respecto al ya que es un coste que pasa di-
lubricante, es sin duda uno de rectamente a producción. El mar-
los elementos vitales. Todo mo- gen de ganancia para la empresa
tor ha de tener combustible, con este sistema sería muy infe-
agua, aceite y aire. No puede rior al que se obtiene gracias a los
faltar ninguna de esas cuatro motores y la cogeneración.
cosas. En una planta como la
nuestra, con estos motores de P. ¿De qué manera considera
gas, hay que tener en cuenta que Cepsa y GRABISA seguirán
que el aceite no puede pasar a colaborando en el futuro?
las cámaras de combustión, los R. Cepsa nos ha proporcionado
motores no lo soportan. históricamente un lubricante y
un servicio que cubre totalmente
P. Bajo su punto de vista y nuestras necesidades. Los profe-
bajo la experiencia que le da sionales del sector somos poco
haber gestionado el manteni- dados a hacer cambios, sobre
miento de la planta durante todo en temas tan relevantes
tantos años, ¿qué caracte- como la lubricación. Nuestra ex-
rísticas considera que son pectativa a futuro es seguir cola-
esenciales para obtener una borando con Cepsa como nues-
óptima lubricación en una tro proveedor de lubricantes
Siemens presenta sus nuevos motores llation took place at an existing LNG plant
belonging to Caprock Midstream, where
de gas capaces de utilizar distintos there were already compressors that were
Hear it here first – Be a part of the first major U.S. solar-plus-storage event of the year
Make business connections that matter – Meet 500 exhibitors & network with 16,000 professionals from across the world
Be in the center of three exciting industries – Learn what‘s next for solar, energy storage, & smart renewable energy
¿Interesado en estar en esta sección? / Interested in this section?: Llámenos / Call us: +34 91 630 85 91 | [email protected]
Módulo sencillo / Single module: 55 mm. ancho / width x 65 mm. alto / height | 700 euros - año / year
Módulo doble / Double module: 55 mm. ancho / width x 150 mm. alto / height | 117 mm. ancho / width x 65 mm. alto / height | 900 euros - año / year
www.anisol.es
e-mail: [email protected]
Teléfonos: 913 528 307 (Madrid)
935 171 552 (Barcelona) +351 265 083 041 (Lisboa)
AQUI SU
PUBLICIDAD
POR 700 €
AÑO
AQUI SU
Frenos PUBLICIDAD
Componentes para turbinas eólicas,
fabricados por KTR.
Rotor Lock
POR 700 €
Sistemas de
AÑO
Acoplamientos refrigeración
www.ktr.com
Fabricante de torres
arriostradas y
autosoportadas para
control de parques
Eólicos, medición
de viento y para
telecomunicaciones
Diseño e ingeniería
propios
Con Certificaciones
EN-1090 e ISO 9001
AQUI SU
PUBLICIDAD
POR 700 €
AÑO
MY
Pásate al autoconsumo de la mano de la empresa
líder en España en soluciones de autoconsumo
industrial, con 11 años de experiencia en el sector y
CY
CMY
con más de 700 instalaciones realizadas.
K
Delegaciones:
GALICIA - NAVARRA - CATALUNYA - MADRID - CANARIAS - COM. VALENCIANA - CASTILLA Y LEÓN - ANDALUCÍA
División de
Gruppo Riello Elettronica | www.riello-elettronica.it
www.aros-solar.com