RESUMEN EJECUTIVO-----------------------------------------------------------------------------------------1
INTRODUCCIÓN------------------------------------------------------------------------------------------------2
MERCADO DE OPORTUNIDAD--------------------------------------------------------------------------- 50
• RESUMEN MENSUAL------------------------------------------------------------------------------- 51
• PARTICIPACIÓN DE PLANTAS EN EL M.O.-------------------------------------------------- 52
• PRECIOS PONDERADOS DEL M.O.------------------------------------------------------------52
• POTENCIA FIRME Y SOBRECOSTO------------------------------------------------------------ 53
ENERGÍA NO SUMINISTRADA----------------------------------------------------------------------------- 58
Informe preliminar Operación Mercado y
Del Sistema Abril 2023
ANEXOS DE FALLAS----------------------------------------------------------------------------------------- 67
ANEXOS DE MANTENIMIENTOS-------------------------------------------------------------------------- 97
1
Informe Preliminar Operación Mercado y
del Sistema Abril 2023
2020
INTRODUCCIÓN
2
Informe Preliminar Operación Mercado y
del Sistema Abril 2023
2020
I. PRODUCCIÓN DE ENERGÍA, CONSUMO INTERNO Y DEMANDA
MÁXIMA
i) La producción de energía para el mes de abril 2023 es de 860.86 GWh como resultado de
172.76 GWh (20.07%) generación hidroeléctrico nacional, 2.08 GWh (0.24%) de generación
térmica nacional, 434.74 Gwh (50.50%) proveniente de las plantas térmicas privadas, 50.32
GWh (5.85%) plantas hidro privado, 53.11 GWh (6.17%) provenientes de plantas Biomasa,
46.55 GWh (5.41%) contribución del parque eólico, 82.52 GWh (9.59%) contribución
parque fotovoltaico y 18.79 GWh (2.18%) planta geotérmica.
ii) De la producción total las mayores contribuciones fueron de las plantas LUFUSSA TRES
16.55%, ENERSA 16.08% y EL CAJON 14.27%.
iii) En este mes de abril 2023 el consumo interno servido (Demanda ENEE) fue de 871.30
GWh que representa un aumento de 2.80 % con respecto al mes de abril 2022 que fue de
847.58 Gwh.
iv) La demanda máxima para el mes de abril suministrada al sistema fue de 1,799.37 MW y
ocurrió el martes 28 de abril a las 18:50 horas. Lo cual indica que la demanda máxima para
el presente mes aumento en 0.59% (10.54 MW) con respecto a la demanda máxima de abril
2022 (1,788.83 MW). La demanda máxima ENEE mes de abril fue de 1,630.24 MW, que
ocurrió el martes 28 de abril a las 18:50 horas. Lo cual indica que la demanda máxima ENEE
para el presente mes aumento en 0.84% (13.57 MW) con respecto a la demanda máxima abril
2022 (1,616.67 MW).
v) La demanda mínima registrada fue de 896.90 MW, la que ocurrió el domingo 09 de abril a
las 06:02 horas.
3
Informe Preliminar Operación Mercado y
del Sistema Abril 2023
2020
vi) Con relación a los valores programados, la generación hidro de embalse real fue menor
en 33.24 GWh (17.67%) a la generación programada, la generación hidro empuntable real
fue menor en 14.68 GWh (22.46%) a la generación programada, la generación hidro de
pasada real fue menor en 14.99 GWh (37.88%) a la generación programada, mientras que la
generación térmica real fue mayor en 58.47 GWh (13.29%) a lo programado. La generación
real biomasa fue menor en 0.06 GWh (0.07%) a lo programado, la generación solar real fue
menor en 9.41 GWh (10.18%) a la generación programada, la generación eólico real fue
menor en 0.76 GWh (1.66%) a la generación programada, la generación geotérmica real fue
mayor en 0.11 GWh (0.48%) a la generación programada. La inyección real por la
interconexión fue menor en 3.68 GWh (26.07%) a la inyección programada, la generación
total real fue 968.12 Gwh, mientras lo programado fue 981.16 Gwh, la primera fue (1.33%)
menor.
4
Informe Preliminar Operación Mercado y
del Sistema Abril 2023
2020
II. INTERCAMBIO REGIONAL DE ENERGÍA
i) Ventas.
ii) Compras.
El total de energía comprada durante el mes en el MER fue de 10,269.99 MWh, con un precio
ponderado mensual total para las compras al MER de US 155.54 US$/Mwh.
5
Informe Preliminar Operación Mercado y
del Sistema Abril 2023
2020
III. SECTOR PRIVADO
El sector privado generó 434.74 GWh de energía termoeléctrica, que representa el 50.50 %,
La producción (Hidro, Biomasa, Eólico, Fotovoltaico, Geotérmico) fue de 251.28 GWh que
representa el 29.19 % de la venta de energía a ENEE.
La energía no suministrada para el mes de abril 2023 fue debido a mantenimientos 3.54 GWh
(33.44%), falla 1.73 Gwh (16.38 %), Reducción de Carga 2.31 Gwh (21.87%), y las aperturas
por consecuencias 3.00 Gwh (28.31%), el cual totalizan 10.58 GWh que representa el 1.21
% de la Demanda ENEE.
6
PRODUCCIÓN DE ENERGÍA HIDROELÉCTRICA
7
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN HIDROELÉCTRICA
80,000,000 EMPUNTABLE
60,000,000 HIDRO PASADA
40,000,000
20,000,000
0
ENERO FEBRERO MARZO ABRIL
8
PRODUCCIÓN DE ENERGÍA TÉRMICA
9
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN TÉRMICA
ENERO FEBRERO MARZO ABRIL TOTAL
PRODUCCIÓN TÉRMICA (KWH)
VENTA ENEE VENTA ENEE VENTA ENEE VENTA ENEE VENTA ENEE
BECOSA 23,402,606.52 30,766,802.91 31,950,874.24 26,793,098.28 112,913,381.95
CEIBA TERMICA * 0.00 0.00 102,232.33 1,770,354.79 1,872,587.12
EMCE CHOLOMA 0.00 0.00 5,485,684.91 9,142,268.50 14,627,953.41
LAEISZ REGULETO 840,615.25 3,797,086.75 13,901,960.75 18,693,164.25 37,232,827.00
ENERSA 114,639,563.39 121,064,855.05 152,826,971.48 138,457,064.24 526,988,454.16
ENERSA COGENERACION 0.00 58,443.75 216,603.80 4,230,122.00 4,505,169.55
ELCATEX 0.00 0.00 0.00 0.00 0.00
GREEN VALEY** 110,670.00 132,930.00 196,410.00 168,300.00 608,310.00
LAEISZ CEIBA TERMICA 2,327,824.00 6,327,264.00 12,148,080.00 12,906,224.00 33,709,392.00
LAEISZ JUTICALPA 57,248.00 0.00 134,536.00 439,800.00 631,584.00
LAEISZ SAN ISIDRO 8,527,139.85 11,462,827.60 14,514,913.79 14,293,597.60 48,798,478.84
LA PUERTA* 0.00 0.00 0.00 310,312.08 310,312.08
LUFUSSA III 107,278,249.18 96,796,915.62 140,791,049.24 142,510,179.74 487,376,393.78
LUFUSSA VALLE 828,943.00 1,629,878.00 10,706,603.00 20,352,376.00 33,517,800.00
SANTA FE * 0.00 0.00 5,488.96 1.57 5,490.53
PLANTA TÉRMICA LAEISZ 0.00 0.00 1,432,948.69 3,714,038.00 5,146,986.69
PECSA 2,132,744.35 2,780,593.04 7,988,790.24 8,204,948.57 21,107,076.20
EL FARO 5,020,673.88 7,745,809.25 16,680,123.75 20,508,966.50 49,955,573.38
ELCOSA 616,888.13 840,901.00 4,982,929.88 14,322,583.12 20,763,302.13
TOTAL TÉRMICO 265,783,165.54 283,404,306.97 414,066,201.06 436,817,399.24 1,400,071,072.81
10
PRODUCCIÓN DE ENERGÍA EÓLICA
11
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN EÓLICA
KWh
60,000,000
50,000,000
20,000,000
10,000,000
0
ENERO FEBRERO MARZO ABRIL
12
PRODUCCIÓN DE ENERGÍA BIOMASA
13
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN BIOMASA
14
PRODUCCIÓN DE ENERGÍA SOLAR
15
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN SOLAR
ENERO FEBRERO MARZO ABRIL TOTAL
PRODUCCIÓN SOLAR (KWH)
VENTA ENEE VENTA ENEE VENTA ENEE VENTA ENEE VENTA ENEE
ENERBASA (PAVANA SOLAR) 3,137,704.00 3,040,243.50 3,195,937.75 2,982,474.00 12,356,359.25
CENTROAMERICANA MARCOVIA 6,266,744.25 6,392,842.62 6,708,412.12 6,376,361.81 25,744,360.80
COHESSA 9,404,759.91 9,243,617.16 9,443,774.33 8,896,914.75 36,989,066.15
SOPOSA 9,490,720.75 9,115,371.50 9,141,599.91 8,521,939.00 36,269,631.16
MECER 4,369,864.25 4,409,025.50 4,744,667.00 4,231,531.00 17,755,087.75
LLANOS DEL SUR 2,205,127.44 2,115,779.95 2,248,239.62 2,133,885.32 8,703,032.33
EL POLLITO 2,463,904.13 2,527,920.53 2,615,537.22 2,502,007.34 10,109,369.22
FOTERSA (SOLAR DEL PACIFICO I) 3,485,854.38 3,571,574.50 3,769,646.50 3,666,607.75 14,493,683.13
CINCO ESTRELLAS (ECSA) 7,812,468.43 7,813,862.35 7,904,660.33 7,899,356.83 31,430,347.94
CHOLUTECA I (SERSA) 3,443,566.12 3,604,748.81 3,842,440.98 3,585,423.78 14,476,179.69
CHOLUTECA II (SERSA) 4,973,029.46 5,028,845.58 5,453,944.44 5,224,695.65 20,680,515.13
FOTOVOLTAICA NACAOME II (PRODERSSA) 7,320,212.81 7,320,609.31 7,856,671.00 7,398,623.00 29,896,116.12
FOTOVOLTAICA NACAOME I (PACIFIC SOLAR) 8,146,968.00 8,161,262.75 8,887,619.25 7,967,332.00 33,163,182.00
HELIOS 4,901,760.13 4,852,275.88 5,152,453.63 4,706,547.88 19,613,037.52
LAS LAJAS 1,541,743.75 1,513,351.91 1,570,097.79 1,469,035.91 6,094,229.36
FRAY LAZARO 0.00 0.00 0.00 0.00 0.00
PRADOS-SUR 4,968,801.50 5,046,414.00 5,389,568.98 4,952,667.75 20,357,452.23
TOTAL SOLAR 83,933,229.31 83,757,745.85 87,925,270.85 82,515,403.77 338,131,649.78
16
PRODUCCIÓN DE ENERGÍA GEOTÉRMICA
17
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN 2023
PRODUCCIÓN GEOTÉRMICA
KWh
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
0
ENERO FEBRERO MARZO ABRIL
18
PRODUCCIÓN DE PLANTAS PRIVADAS
19
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
450.00
400.00
350.00
300.00
250.00
200.00
150.00
100.00
50.00
0.00
HIDRO TÉRMICA BIOMASA SOLAR EÓLICA GEOTÉRMICA
37%
63%
RENOVABLE TÉRMICO
20
RESUMEN GENERAL DE LA PRODUCCIÓN DE
ENERGÍA
21
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
ENE 164.1163 0.0000 164.1163 93.1558 265.7832 57.5611 83.9332 89.8863 23.8874 614.2070 778.3233
FEB 132.0248 0.0000 132.0248 62.2814 283.4043 54.9258 83.7577 101.9282 20.5760 606.8735 738.8983
MAR 170.4008 0.1077 170.5085 60.4831 413.9585 60.8990 87.9253 54.3312 22.1060 699.7031 870.2116
ABR 172.7601 2.0807 174.8407 50.3246 434.7367 53.1062 82.5154 46.5489 18.7896 686.0214 860.8622
ACU 639.3020 2.1884 641.4904 266.2450 1,397.8827 226.4922 338.1316 292.6946 85.3590 2,606.8051 3,248.2955
400.00
300.00
200.00
100.00
0.00
HIDRO TÉRMICA BIOMASA SOLAR EÓLICA GEOTÉRMICA
80.00%
60.00%
40.00%
20.00%
0.00%
ABR
PÚBLICO 20.31%
PRIVADO 79.69%
22
PRODUCCIÓN REAL Y PROGRAMADA DE
ENERGÍA
23
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
ENE 136.2070 159.3600 66.4796 75.5900 64.7858 76.5900 321.2294 277.2700 90.7906 78.4100 83.9391 91.4600 90.6767 108.6100 29.4988 24.7200 883.6070 892.0100
FEB 110.0771 137.1200 52.0240 64.7800 40.1887 58.0400 346.9608 275.9000 91.2795 83.2700 84.2399 91.2700 101.9302 86.4500 20.5760 22.3500 847.2761 819.1800
MAR 137.6335 157.9100 60.2345 64.6600 33.7595 50.7200 485.8502 425.0800 98.8731 97.7300 88.4133 102.5300 54.4461 81.4200 27.5998 24.1900 986.8099 1,004.2400
ABR 154.9163 188.1600 50.6974 65.3800 24.5749 39.5600 498.3963 439.9300 86.2203 86.2800 83.0014 92.4100 46.6538 45.8900 23.6639 23.5500 968.1242 981.1600
ACU 538.8339 673.8728 229.4355 574.4350 163.3089 270.9802 1,652.4366 3,636.3400 367.1634 346.9826 339.5937 1,107.8300 293.7067 376.8006 101.3385 163.9231 3,685.8173 7,151.1643
OBSERVACIÓN: LA PRODUCCIÓN PROGRAMADA SE OBTIENE DEL INFORME DE PROGRAMACIÓN DE LA OPERACIÓN A LARGO PLAZO 2023-2025
1,200.00
1,000.00
800.00
986.81 968.12
GWh 600.00 883.61 1,004.24
847.28 981.16
892.01
819.18
400.00
200.00
0.00
ENERO FEBRERO MARZO ABRIL
REAL PROGRAMADO
24
CONTROL DE LA OPERACIÓN DEL SISTEMA
INTERCONECTADO NACIONAL
25
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
CONTROL DE OPERACIÓN DEL SISTEMA (GWH) 2023
CONCEPTO
ENERO FEBRERO MARZO
PROG EJEC DESV PROG EJEC DESV PROG EJEC DESV
Producción Bruta Hidro Embalse (GWh) 159.36 136.21 -14.53% 137.12 110.08 -19.72% 157.91 137.63 -12.84%
Producción Bruta Hidro Empuntable (GWh) 75.59 66.48 -12.05% 64.78 52.02 -19.69% 64.66 60.23 -6.84%
Producción Bruta Hidro Pasada (GWh) 76.59 64.79 -15.41% 58.04 40.19 -30.76% 50.72 33.76 -33.44%
Producción Bruta Térmica (GWh) 277.27 321.23 15.85% 275.90 346.96 25.76% 425.08 485.85 14.30%
Producción Bruta Biomasa (GWh) 78.41 90.79 15.79% 83.27 91.28 9.62% 97.73 98.87 1.17%
Producción Bruta Solar (GWh) 91.46 83.94 -8.22% 91.27 84.24 -7.70% 102.53 88.41 -13.77%
Producción Bruta Eólica (GWh) 108.61 90.68 -16.51% 86.45 101.93 17.91% 81.42 54.45 -33.13%
Producción Bruta Geotérmica (GWh) 24.72 29.50 19.33% 22.35 20.58 -7.94% 24.19 27.60 14.10%
Producción Bruta Total (GWh) 892.01 883.61 -0.94% 819.18 847.28 3.43% 1,004.24 986.81 -1.74%
Interconexión (GWh) 9.07 8.85 -2.37% 12.29 5.07 -58.72% 10.95 6.64 -39.39%
Demanda Máxima (MW) 1,598.02 1,603.49 0.34% 1,588.47 1,639.82 3.23% 1,743.34 1,713.44 -1.72%
CONCEPTO
ABRIL ACUMULADO DEL AÑO
PROG EJEC DESV PROG EJEC DESV
Producción Bruta Hidro Embalse (GWh) 188.16 154.92 -17.67% 642.55 538.83 -16.14%
Producción Bruta Hidro Empuntable (GWh) 65.38 50.70 -22.46% 270.41 229.44 -15.15%
Producción Bruta Hidro Pasada (GWh) 39.56 24.57 -37.88% 224.91 163.31 -27.39%
Producción Bruta Térmica (GWh) 439.93 498.40 13.29% 1,418.18 1,652.44 16.52%
Producción Bruta Biomasa (GWh) 86.28 86.22 -0.07% 345.69 367.16 6.21%
Producción Bruta Solar (GWh) 92.41 83.00 -10.18% 377.67 339.59 -10.08%
Producción Bruta Eólica (GWh) 45.89 46.65 1.66% 322.37 293.71 -8.89%
Producción Bruta Geotérmica (GWh) 23.55 23.66 0.48% 94.81 101.34 6.89%
Producción Bruta Total (GWh) 981.16 968.12 -1.33% 3,696.59 3,685.82 -0.29%
Interconexión (GWh) 14.12 10.44 -26.07% 14.12 10.44 -26.07%
Demanda Máxima (MW) 1,818.43 1,799.37 -1.05% 6,748.26 6,756.12 0.12%
OBSERVACIÓN: LA PRODUCCIÓN PROGRAMADA SE OBTIENE DEL INFORME DE PROGRAMACIÓN DE LA OPERACIÓN A LARGO PLAZO 2023-2025
26
CAPACIDAD DISPONIBLE AL FINAL DEL MES
27
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
CAPACIDAD DISPONIBLE AL FINAL DEL MES CON PLANTAS SOLARES (MW) 2023
28
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
2,909.89
1,500 2,800
CAPACIDAD DISPNIBLE AL FINAL DEL MES (MW)
1,200
600
392.51 407.10
373.63 357.61 363.87 800
328.72 332.31 325.00
300
161.94
150.79 163.19 171.43 400
120.06 109.47 126.20
75.07 77.04 95.67
59.38
28.42 25.75 45.59
7.26 25.27 34.12 33.32 34.34
4.95
0 0
ENE FEB MAR ABR
NOTA: UTILIZAR EL EJE SECUNDARIO PARA ANALIZAR LA CAPACIDAD TOTAL Y NOMINAL EN EL SIN
29
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
CAPACIDAD DISPONIBLE AL FINAL DEL MES SIN PLANTAS SOLARES (MW) 2023
30
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
2,399.11
1,500 2,400
1,697.31
1,598.31
1,439.31
898.29 914.74 1,600
886.65
900 856.16
1,200
600
407.10
800
392.51
332.31 325.00
300
161.94 163.19 171.43 400
150.79 126.20
120.06 109.47 95.67
75.07 77.04 59.38
28.42 25.75 45.59 25.27 34.12 33.32 34.34
7.26 4.95
0 0
ENE FEB MAR ABR
NOTA: UTILIZAR EL EJE SECUNDARIO PARA ANALIZAR LA CAPACIDAD TOTAL Y NOMINAL EN EL SIN
31
PRODUCCIÓN DE ENERGÍA BRUTA EN EL
SISTEMA INTERCONECTADO NACIONAL
32
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN BRUTA 2023
PRODUCCIÓN HIDROELÉCTRICA BRUTA
PRODUCCIÓN HIDROELÉCTRICA (KWH) ENERO FEBRERO MARZO ABRIL TOTAL
HIDROELÉCTRICAS DE EMBALSE
CAÑAVERAL 12,231,040.00 9,365,340.00 11,538,740.00 7,883,120.00 41,018,240.00
CAJON 94,765,450.02 80,122,580.00 106,614,759.52 125,561,890.05 407,064,679.59
PATUCA III 18,234,190.00 13,899,980.00 12,476,750.00 16,153,940.00 60,764,860.01
ARENAL 10,976,340.00 6,689,188.00 7,003,252.00 5,317,344.00 29,986,124.00
HIDROELÉCTRICAS EMPUNTABLES
RIO LINDO 43,581,319.98 34,849,060.01 40,049,489.99 28,658,340.00 147,138,209.99
SHOL 9,398,620.00 5,841,808.00 4,431,610.00 2,990,386.06 22,662,424.06
LA VEGONA 13,499,670.01 11,333,139.99 15,753,360.00 19,048,700.00 59,634,870.00
HIDROELÉCTRICAS DE PASADA
NACAOME** 273,640.00 251,800.00 278,448.00 270,576.00 1,074,464.00
ZACAPA HIDRO 146,080.00 124,920.00 87,902.50 97,040.00 455,942.50
RIO BLANCO 3,620,846.02 2,641,870.00 2,487,313.98 1,974,640.00 10,724,670.00
LAS NIEVES 0.00 0.00 0.00 0.00 0.00
LA ESPERANZA 1,799,720.00 733,820.00 831,969.00 518,760.00 3,884,269.00
BABILONIA 2,598,709.81 1,669,500.00 1,578,026.00 1,198,740.00 7,044,975.81
HIDRO YOJOA 238,720.00 111,072.61 85,380.00 7,676.93 442,849.54
CECECAPA 704,720.00 373,916.00 281,816.00 168,196.00 1,528,648.00
CUYAMAPA 2,042,920.00 1,405,010.74 708,524.41 823,896.24 4,980,351.39
CUYAMEL 3,265,915.50 2,373,942.19 2,661,533.06 2,312,038.25 10,613,429.00
CORTECITO 2,103,200.43 1,389,280.25 909,627.38 1,097,430.00 5,499,538.05
LAS GLORIAS 3,970,700.00 1,903,020.00 1,155,864.00 544,960.00 7,574,544.00
SAN CARLOS 0.00 0.00 0.00 0.00 0.00
CORONADO 3,290,070.00 2,309,852.25 1,840,384.00 1,399,413.25 8,839,719.50
MANGUNGO 1,022,800.00 706,100.00 542,728.00 380,420.00 2,652,048.00
SAN JUAN PUEBLO 3,512,510.00 2,128,208.00 1,568,010.00 994,240.00 8,202,968.00
EL CISNE 8,874.35 0.00 5,466.88 2,715.00 17,056.23
LOS LAURELES 512,635.55 245,946.75 284,076.47 195,044.50 1,237,703.26
CHAMELECON 4,198,610.00 2,734,065.50 2,285,990.00 1,416,389.75 10,635,055.25
MORJAS 2,273,130.57 1,156,976.49 413,862.22 104,318.66 3,948,287.94
SAN MARTIN 1,517,900.00 1,044,206.00 935,066.00 592,126.50 4,089,298.50
LA AURORA 991,010.00 513,150.00 434,758.25 208,322.25 2,147,240.50
PEÑA BLANCA 1,449,180.00 1,205,210.00 1,173,024.56 967,890.00 4,795,304.56
GENERA LOS LAURELES 2,541,970.00 1,542,406.24 1,015,430.65 695,789.05 5,795,595.94
SANTA MARÍA DEL REAL * 0.00 0.00 0.00 0.00 0.00
MATARRAS 957,340.00 590,249.09 483,335.56 335,488.20 2,366,412.85
RIO GUINEO 416,820.35 262,838.00 217,065.75 170,745.62 1,067,469.72
33
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
MEZAPA 5,556,200.00 2,950,216.00 2,037,416.66 1,437,560.00 11,981,392.66
SAZAGUA 1,019,990.00 854,050.72 912,718.00 536,006.03 3,322,764.75
ZINGUIZAPA 63,430.00 512,589.16 756,422.08 491,196.39 1,823,637.63
RIO BETULIA 2,651,179.50 1,685,950.00 1,141,770.00 697,145.00 6,176,044.50
CANJEL 426,770.00 239,472.00 241,894.00 176,636.00 1,084,772.00
RIO QUILIO 353,900.00 234,987.08 179,742.76 131,264.52 899,894.36
EL COYOLAR 0.00 0.00 0.00 0.00 0.00
AGUA VERDE 662,210.00 598,120.00 556,400.00 449,700.00 2,266,430.00
CHACHAGUALA 931,050.00 624,957.00 964,133.75 689,600.75 3,209,741.50
EL NÍSPERO * 601,790.00 582,900.00 114,070.00 546,680.00 1,845,440.01
EL NISPERO II 2,145,229.31 1,038,656.87 907,902.28 370,845.00 4,462,633.46
CHURUNE 1,101,810.00 472,604.21 392,575.50 275,466.54 2,242,456.25
CORRAL DE PIEDRAS 58,940.00 40,813.47 44,579.00 33,561.67 177,894.14
PENCALIGUE 2,530,200.00 1,226,384.00 1,159,936.00 748,360.00 5,664,880.00
SAN ALEJO 285,720.00 95,699.69 81,745.35 21,709.94 484,874.98
CUYAGUAL 2,253,730.00 1,271,326.00 1,888,632.00 1,385,484.00 6,799,172.00
RÍO FRIO 685,650.00 342,650.00 113,949.00 106,825.00 1,249,074.00
TOTAL HIDRO 267,472,451.41 202,289,832.32 231,627,450.55 230,188,617.16 931,578,351.45
34
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
35
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
MER
ENVIADO (GWh) RECIBIDO (GWh)
INTERCONEXIÓN 69.09 79.53
51%
RENOVABLE
49% TÉRMICA
51%
TÉRMICA RENOVABLE
36
PRODUCCIÓN INTERCAMBIO Y CONSUMO DE
ENERGÍA
37
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
PRODUCCIÓN, INTERCAMBIO Y CONSUMO DE ENERGÍA 2023
Los datos de Interconexión se toman de mediciones oficiales del Ente Operador Regional( EOR).
PRODUCCION Y CONSUMO DE ENERGÍA 2023
1,100
1,000 0.00
900
ENERGÍA (GWh) 800
700
600
500
400
300
200
100
ENERO FEBRERO MARZO ABRIL
1,500
POTENCIA (MW)
1,000
500
0
ENERO FEBRERO MARZO ABRIL
38
DEMANDA MÁXIMA DEL SISTEMA
INTERCONECTADO NACIONAL
39
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
DEMANDA MÁXIMA MENSUAL
MES ENERO FEBRERO MARZO ABRIL
DÍA martes-24 martes-28 martes-28 viernes-28
DEMANDA 1,603.49 1,639.82 1,713.44 1,799.37
HORA 18:43 18:57 18:43 18:50
C.Instalada ENEE SISTEMA ENEE SISTEMA ENEE SISTEMA ENEE SISTEMA
MW MW MW MW MW MW MW MW MW
HIDROELÉCTRICAS DE EMBALSE
CAÑAVERAL 29.00 20.26 20.37 28.12 28.95 10.05 10.05 9.78 10.21
CAJON 300.00 142.32 147.18 178.43 187.50 222.66 222.66 282.43 288.75
PATUCA 104.00 16.58 18.17 22.09 24.91 17.66 18.07 66.60 74.04
ARENAL 55.51 61.64 59.29 59.32 53.14 53.14 48.00 48.07
TOTAL 433.00 234.67 247.35 287.93 300.68 303.51 303.92 406.81 421.07
HIDROELÉCTRICAS EMPUNTABLES
RIO LINDO 80.00 79.90 80.09 77.84 79.18 40.39 40.50 38.57 39.84
SHOL 36.45 31.48 32.66 27.71 28.21 22.48 22.97 17.61 17.90
LA VEGONA 40.00 41.67 43.60 41.12 43.50 43.60 43.60 42.84 43.90
TOTAL 156.45 153.05 156.35 146.67 150.89 106.47 107.07 99.02 101.64
EÓLICAS
CERRO DE HULA 125.00 34.80 35.35 3.83 3.83 16.72 16.75 19.43 19.48
PLANTA SAN MARCOS 50.00 40.10 40.11 15.73 15.73 40.34 40.42 0.00 0.00
CHINCHAYOTE 60.00 42.81 43.00 15.90 15.90 39.51 39.60 2.00 2.00
TOTAL 235.00 117.72 118.46 35.46 35.46 96.56 96.77 21.43 21.48
BIOMASA
TRES VALLES 17.80 8.21 16.86 9.88 20.13 11.06 22.50 10.76 21.34
CAHSA 30.00 10.71 25.78 12.93 28.59 12.11 28.21 12.24 28.27
AZUNOSA (IHSA) 14.00 0.00 0.00 9.15 13.72 8.29 12.89 8.87 13.02
CHUMBAGUA 20.00 8.27 14.85 4.17 7.91 7.41 14.50 8.24 15.67
ECOPALSA** 1.27 0.00 0.00 0.00 0.00 0.29 1.46 0.68 1.33
CELSUR 44.25 17.56 28.34 13.57 22.53 27.96 27.96 13.28 13.28
YODECO 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACEYDESA 5.50 0.01 2.74 0.00 0.00 0.00 0.00 0.01 0.52
MERENDON POWER PLANT 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CARACOL KNITS 18.10 0.06 16.08 0.35 9.42 0.28 8.31 0.37 9.28
PALMASA 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BIOGAS Y ENERGIA 1.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXPORTADORA DEL ATLANTICO 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GREEN POWER PLANT 43.00 39.58 43.29 40.77 44.22 37.44 43.69 0.00 0.00
LOS PINOS I 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 221.29 84.42 147.94 90.83 146.52 104.84 159.52 54.43 102.70
HIDROELECTRICAS DE PASADA
TOTAL 259.52 112.50 112.50 73.04 73.04 69.84 69.84 63.38 63.38
SOLAR
ENERBASA (PAVANA SOLAR) 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CENTROAMERICANA MARCOVIA 35.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COHESSA 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SOPOSA 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MECER 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LLANOS DEL SUR 14.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EL POLLITO 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FOTERSA (SOLAR DEL PACIFICO I) 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CINCO ESTRELLAS (ECSA) 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CHOLUTECA I (SERSA) 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CHOLUTECA II (SERSA) 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FOTOVOLTAICA NACAOME II (PRODERSSA) 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FOTOVOLTAICA NACAOME I (PACIFIC SOLAR) 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HELIOS 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LAS LAJAS 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FRAY LAZARO 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRADOS-SUR 30.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 510.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GEOTÉRMICA
GEOPLATANARES 39.00 23.95 29.58 28.67 28.67 22.40 27.97 27.62 34.79
TOTAL 39.00 23.95 29.58 28.67 28.67 22.40 27.97 27.62 34.79
TÉRMICA
BECOSA 105.00 42.87 104.35 46.45 103.06 43.35 104.12 42.33 104.05
CEIBA TERMICA * 10.00 0.00 0.00 0.00 0.00 0.00 0.00 7.01 7.01
EMCE CHOLOMA 50.00 0.00 0.00 0.00 0.05 38.34 38.75 20.53 20.53
LAEISZ REGULETO 30.00 31.04 33.06 31.47 32.25 32.80 32.84 31.93 31.95
ENERSA 230.00 208.58 208.58 211.67 211.73 223.62 223.64 222.57 222.58
ENERSA COGENERACION 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ELCATEX 21.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GREEN VALEY** 11.00 0.19 6.17 0.22 6.20 0.46 5.72 0.33 6.00
LAEISZ CEIBA TERMICA 22.00 14.04 14.04 22.39 22.39 13.23 13.23 20.08 20.08
LAEISZ JUTICALPA 15.00 0.00 0.00 0.00 0.00 0.00 0.00 11.30 11.30
LAEISZ SAN ISIDRO 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
LA PUERTA* 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LUFUSSA III 240.00 208.00 208.00 240.71 241.00 238.91 239.00 240.90 241.00
LUFUSSA VALLE 70.00 58.31 70.21 72.95 82.36 81.40 82.86 81.35 81.91
SANTA FE * 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PLANTA TÉRMICA LAEISZ 22.60 0.00 0.00 0.00 0.00 0.00 0.00 19.05 19.05
PECSA 54.00 5.63 52.91 5.78 51.03 11.70 46.24 11.87 38.76
EL FARO 43.65 42.54 42.54 42.09 42.45 40.99 42.50 40.93 42.42
ELCOSA 80.00 24.65 29.50 43.66 49.20 38.51 39.20 57.30 57.60
TOTAL 1054.85 655.84 789.36 737.38 861.71 783.33 888.10 827.48 924.25
INTERCONEXIÓN 1.94 1.94 42.84 42.84 60.25 60.25 130.06 130.06
TOTAL 2909.89 1,384.09 1,603.49 1,442.82 1,639.82 1,547.20 1,713.44 1,630.24 1,799.37
40
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN DEL MERCADO
DEPARTAMENTO POSDESPACHO
41
850
900
950
1,000
1,050
1,100
1,150
1,200
1,250
1,300
1,350
1,400
1,450
1,500
1,550
1,600
1,650
1,700
1,750
1,800
1,850
Mar-24-ene-18:43
Mar-24-ene-18:43
Mar-24-ene-18:43
1,603.49
Mar-24-ene-18:43
Mar-28-feb-18:64
Mar-28-feb-18:72
1,639.82
Mar-28-feb-18:80
Mar-28-mar-19:12
Mar-28-mar-19:12
1,713.44
Mar-28-mar-19:12
DEMANDAS MAXIMAS MENSUALES ABRIL 2023
Vie-28-abr-18:50
Vie-28-abr-18:50
Vie-28-abr-18:50
1,799.37
42
BALANCE DE ENERGÍA DEL SISTEMA
INTERCONECTADO NACIONAL
43
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
DEMANDA ENEE Y DEMANDA SISTEMA
C. INSTALADA ENERO FEBRERO MARZO ABRIL TOTAL
MW ENEE (GWH) Sistema (GWH) ENEE (GWH) Sistema (GWH) ENEE (GWH) Sistema (GWH) ENEE (GWH) Sistema (GWH) ENEE (GWH) Sistema (GWH)
HIDROELÉCTRICAS DE EMBALSE 433.00 130.33 136.21 104.35 110.08 137.35 137.63 150.21 154.92 522.24 538.83
CAÑAVERAL 29.00 12.17 12.23 9.10 9.37 11.54 11.54 7.55 7.88 40.35 41.02
CAJON 300.00 91.64 94.77 76.25 80.12 106.61 106.61 122.81 125.56 397.32 407.06
PATUCA 104.00 16.64 18.23 12.32 13.90 12.20 12.48 14.53 16.15 55.69 60.76
ARENAL 9.88 10.98 6.69 6.69 7.00 7.00 5.31 5.32 28.88 29.99
HIDROELÉCTRICAS EMPUNTABLES 156.45 65.44 66.48 50.71 52.02 60.03 60.23 49.28 50.70 225.46 229.44
RIO LINDO 80.00 43.48 43.58 34.26 34.85 39.94 40.05 27.75 28.66 145.42 147.14
SHOL 36.45 9.06 9.40 5.74 5.84 4.34 4.43 2.94 2.99 22.08 22.66
LA VEGONA 40.00 12.90 13.50 10.71 11.33 15.75 15.75 18.59 19.05 57.96 59.63
EÓLICAS 235.00 89.89 90.68 101.93 101.93 54.45 54.45 46.55 46.65 292.81 293.71
CERRO DE HULA 125.00 43.10 43.78 51.33 51.33 24.67 24.67 18.72 18.76 137.82 138.54
PLANTA SAN MARCOS 50.00 22.61 22.62 25.83 25.83 14.78 14.78 13.46 13.49 76.68 76.72
CHINCHAYOTE 60.00 24.17 24.28 24.77 24.77 14.99 14.99 14.37 14.40 78.31 78.45
BIOMASA 221.29 57.56 90.79 54.93 91.28 60.90 98.87 53.11 86.22 226.49 367.16
TRES VALLES 17.80 6.53 13.39 5.81 12.28 6.59 14.59 7.03 13.94 25.95 54.21
CAHSA 30.00 4.19 10.08 7.86 17.38 8.18 19.05 8.39 19.38 28.62 65.90
AZUNOSA (IHSA) 14.00 3.76 4.57 4.70 7.04 5.16 8.03 4.77 7.00 18.39 26.64
CHUMBAGUA 20.00 5.91 10.62 5.09 9.65 5.24 10.25 5.34 10.16 21.59 40.68
ECOPALSA** 1.27 0.13 0.14 0.02 0.05 0.06 0.32 0.22 0.44 0.44 0.95
CELSUR 44.25 11.61 19.18 10.35 17.60 11.35 11.59 9.93 9.93 43.24 58.30
YODECO 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACEYDESA 5.50 0.01 1.57 0.02 0.81 0.00 0.59 0.00 0.22 0.03 3.19
MERENDON POWER PLANT 18.00 1.06 1.06 0.00 0.22 0.05 0.08 0.00 0.22 1.11 1.59
CARACOL KNITS 18.10 0.01 3.60 0.14 3.75 0.21 6.39 0.15 3.79 0.52 17.53
PALMASA 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BIOGAS Y ENERGIA 1.17 0.62 0.62 0.62 0.42 0.49 0.49 0.39 0.39 2.11 1.92
EXPORTADORA DEL ATLANTICO 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GREEN POWER PLANT 43.00 23.75 25.98 20.33 22.06 23.55 27.49 16.88 20.73 84.50 96.26
LOS PINOS I 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
44
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
DEMANDA ENEE Y DEMANDA SISTEMA
HIDROELÉCTRICAS DE PASADA 259.52 59.81 63.06 38.65 40.19 33.50 33.76 23.60 24.57 157.85 163.31
NACAOME 28.12 0.25 0.27 0.23 0.25 0.25 0.28 0.24 0.27 0.96 1.07
ZACAPA HIDRO 0.75 0.13 0.15 0.11 0.12 0.09 0.09 0.08 0.10 0.41 0.46
RIO BLANCO 5.00 3.62 3.62 2.63 2.64 2.49 2.49 1.93 1.97 10.67 10.72
LAS NIEVES 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LA ESPERANZA 13.50 1.12 1.80 0.62 0.73 0.83 0.83 0.46 0.52 3.04 3.88
BABILONIA(ENERGISA) 4.30 2.60 2.60 1.67 1.67 1.58 1.58 1.09 1.20 6.93 7.04
HIDRO YOJOA 0.63 0.16 0.24 0.11 0.11 0.08 0.09 0.01 0.01 0.37 0.44
CECECAPA 3.00 0.00 0.00 0.37 0.37 0.28 0.28 0.17 0.17 1.50 1.53
CUYAMAPA 12.40 1.79 2.04 1.39 1.41 0.68 0.71 0.81 0.82 4.67 4.98
CUYAMEL 7.80 3.27 3.27 2.37 2.37 2.66 2.66 2.31 2.31 10.61 10.61
CORTECITO 5.30 2.10 2.10 1.39 1.39 0.91 0.91 1.10 1.10 5.50 5.50
LAS GLORIAS 6.00 3.91 3.97 1.81 1.90 1.16 1.16 0.54 0.54 7.42 7.57
SAN CARLOS 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CORONADO 7.00 3.12 3.29 2.31 2.31 1.84 1.84 1.40 1.40 8.67 8.84
MANGUNGO 1 1.50 0.00 0.00 0.70 0.71 0.54 0.54 0.36 0.38 2.61 2.65
SAN JUAN(CONTEMPO) 6.55 3.42 3.51 2.13 2.13 1.56 1.57 0.99 0.99 8.10 8.20
EL CISNE 0.71 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.01 0.02
LAURELES(EGERETO) 3.50 0.51 0.51 0.25 0.25 0.28 0.28 0.19 0.20 1.24 1.24
CHAMELECON 12.00 4.14 4.20 2.73 2.73 2.25 2.29 1.41 1.42 10.53 10.64
MORJA II 8.60 2.27 2.27 1.16 1.16 0.41 0.41 0.10 0.10 3.94 3.95
SAN MARTIN 3.00 1.46 1.52 1.04 1.04 0.93 0.94 0.59 0.59 4.03 4.09
AURORA I 9.00 0.87 0.99 0.51 0.51 0.43 0.43 0.21 0.21 2.03 2.15
PEÑA BLANCA 0.90 1.45 1.45 1.20 1.21 1.17 1.17 0.95 0.97 4.77 4.80
GENERA(LAURELES) 5.20 2.48 2.54 1.54 1.54 1.02 1.02 0.70 0.70 5.73 5.80
STA. MARÍA d/REAL 1.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MATARRAS 1.70 0.93 0.96 0.00 0.59 0.48 0.48 0.33 0.34 2.34 2.37
RIO GUINEO 1.38 0.42 0.42 0.26 0.26 0.22 0.22 0.17 0.17 1.07 1.07
MEZAPA(SEMSA) 10.50 5.38 5.56 2.88 2.95 1.96 2.04 1.28 1.44 11.51 11.98
PURINGLA SAZAGUA 10.00 0.87 1.02 0.85 0.85 0.91 0.91 0.53 0.54 3.16 3.32
ZINGUIZAPA 3.10 0.00 0.06 0.51 0.51 0.76 0.76 0.49 0.49 1.76 1.82
RIO BETULIA 8.33 2.63 2.65 1.61 1.69 1.12 1.14 0.70 0.70 6.06 6.18
CANJEL(BLUE ENERGY) 3.00 0.43 0.43 0.24 0.24 0.24 0.24 0.18 0.18 1.08 1.08
QUILIO 1.10 0.34 0.35 0.23 0.23 0.18 0.18 0.13 0.13 0.88 0.90
COYOLAR 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
AGUA VERDE 1.00 0.66 0.66 0.59 0.60 0.55 0.56 0.44 0.45 2.24 2.27
CHACHAGUALA 6.80 0.88 0.93 0.62 0.62 0.96 0.96 0.69 0.69 3.14 3.21
EL NÍSPERO 22.50 0.19 0.60 0.10 0.58 0.11 0.11 0.12 0.55 0.52 1.85
PHP-NISPERO 2 6.00 2.15 2.15 1.04 1.04 0.90 0.91 0.37 0.37 4.45 4.46
CHURUNE (INVERSA) 3.00 1.00 1.10 0.47 0.47 0.39 0.39 0.27 0.28 2.14 2.24
CORRAL DE PIEDRA(ENERCO) 2.78 0.05 0.06 0.04 0.04 0.04 0.04 0.03 0.03 0.16 0.18
PENCALIGUE(HIDROCCI) 13.00 2.31 2.53 1.22 1.23 1.15 1.16 0.74 0.75 5.43 5.66
SAN ALEJO 2.20 0.17 0.29 0.09 0.10 0.08 0.08 0.02 0.02 0.36 0.48
CUYAGUAL 7.00 2.11 2.25 1.26 1.27 1.88 1.89 1.38 1.39 6.63 6.80
RÍO FRIO 3.87 0.62 0.69 0.34 0.34 0.11 0.11 0.10 0.11 1.17 1.25
45
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
DEMANDA ENEE Y DEMANDA SISTEMA
SOLAR 510.78 83.93 83.94 83.76 84.24 87.93 88.41 82.52 83.00 338.13 339.59
ENERBASA (PAVANA SOLAR) 25.00 3.14 3.14 3.04 3.06 3.20 3.22 2.98 3.01 12.36 12.43
CENTROAMERICANA MARCOVIA 35.00 6.27 6.27 6.39 6.44 6.71 6.75 6.38 6.42 25.74 25.88
COHESSA 50.00 9.40 9.41 9.24 9.29 9.44 9.49 8.90 8.94 36.99 37.14
SOPOSA 50.00 9.49 9.49 9.12 9.16 9.14 9.18 8.52 8.56 36.27 36.40
MECER 25.00 4.37 4.37 4.41 4.43 4.74 4.75 4.23 4.25 17.76 17.81
LLANOS DEL SUR 14.81 2.21 2.21 2.12 2.12 2.25 2.25 2.13 2.14 8.70 8.72
EL POLLITO 20.00 2.46 2.46 2.53 2.54 2.62 2.63 2.50 2.51 10.11 10.14
FOTERSA (SOLAR DEL PACIFICO I) 20.00 3.49 3.49 3.57 3.59 3.77 3.78 3.67 3.68 14.49 14.54
CINCO ESTRELLAS (ECSA) 50.00 7.81 7.81 7.81 7.89 7.90 7.98 7.90 7.97 31.43 31.65
CHOLUTECA I (SERSA) 20.00 3.44 3.44 3.60 3.63 3.84 3.86 3.59 3.60 14.48 14.54
CHOLUTECA II (SERSA) 30.00 4.97 4.97 5.03 5.05 5.45 5.48 5.22 5.25 20.68 20.75
FOTOVOLTAICA NACAOME II (PRODERSSA) 50.00 7.32 7.32 7.32 7.36 7.86 7.90 7.40 7.44 29.90 30.02
FOTOVOLTAICA NACAOME I (PACIFIC SOLAR) 50.00 8.15 8.15 8.16 8.20 8.89 8.94 7.97 8.02 33.16 33.31
HELIOS 25.00 4.90 4.90 4.85 4.87 5.15 5.17 4.71 4.72 19.61 19.66
LAS LAJAS 10.00 1.54 1.54 1.51 1.52 1.57 1.58 1.47 1.48 6.09 6.11
FRAY LAZARO 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRADOS-SUR 30.97 4.97 4.97 5.05 5.09 5.39 5.44 4.95 5.00 20.36 20.49
GEOTÉRMICAS 39.00 23.89 29.50 20.58 20.58 22.11 27.60 18.79 23.66 85.36 101.34
GEOPLATANARES 39.00 23.89 29.50 20.58 20.58 22.11 27.60 18.79 23.66 85.36 101.34
TÉRMICAS 974.85 265.17 320.49 283.40 2182.09 414.07 485.85 436.82 498.40 1400.07 1652.44
BECOSA 105.00 23.40 56.97 30.77 68.26 31.95 76.74 26.79 65.85 112.91 267.82
CEIBA TERMICA * 10.00 0.00 0.00 0.00 0.00 0.10 0.10 1.77 1.77 1.87 1.87
EMCE CHOLOMA 50.00 0.00 0.00 0.00 0.00 5.49 5.54 9.14 9.14 14.63 14.69
LAEISZ REGULETO 30.00 0.84 0.90 3.80 3.89 13.90 13.92 18.69 18.71 37.23 37.41
ENERSA 230.00 114.64 114.64 121.06 121.10 152.83 152.83 138.46 138.46 526.99 527.04
ENERSA COGENERACION 10.00 0.00 0.04 0.06 0.09 0.22 0.34 4.23 4.25 4.51 4.73
ELCATEX 21.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
GREEN VALEY** 11.00 0.11 3.67 0.13 3.78 0.20 2.42 0.17 3.02 0.61 12.90
LAEISZ CEIBA TERMICA 22.00 2.33 2.33 6.33 6.33 12.15 12.15 12.91 12.91 33.71 33.71
LAEISZ JUTICALPA 15.00 0.06 0.06 0.00 0.00 0.13 0.13 0.44 0.44 0.63 0.63
LAEISZ SAN ISIDRO 20.00 8.53 8.53 11.46 11.47 14.51 14.52 14.29 14.29 48.80 48.80
LA PUERTA* 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31 0.31 0.31 0.31
LUFUSSA III 240.00 107.28 107.28 96.80 96.92 140.79 140.84 142.51 142.57 487.38 487.60
LUFUSSA VALLE 70.00 0.83 1.00 1.63 1.84 10.71 10.90 20.35 20.49 33.52 34.23
SANTA FE * 4.80 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01
PLANTA TÉRMICA LAEISZ 22.60 0.00 0.02 0.00 0.00 1.43 1.47 3.71 3.71 5.15 5.21
PECSA 54.00 2.13 20.04 2.78 24.53 7.99 31.56 8.20 26.80 21.11 102.93
EL FARO 43.65 5.02 5.02 7.75 7.81 16.68 17.29 20.51 21.26 49.96 51.38
ELCOSA 80.00 0.62 0.74 0.84 0.95 4.98 5.07 14.32 14.40 20.76 21.16
INTERCONEXIÓN 8.85 8.85 5.07 5.07 6.64 6.64 10.44 10.44 31.00 31.00
TOTAL 2,829.89 787.18 892.46 743.97 852.35 876.96 993.45 871.30 978.56 3,279.42 3,716.82
46
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN DEL MERCADO
DEPARTAMENTO POSDESPACHO
47
RESUMEN DE PRECIOS EX POST
48
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN MERCADO
DEPARATAMENTO POSDESPACHO
PRECIOS EX POST ($/MWH) POR BANDA HORARIA
419.50
400.00
386.21
350.00
300.00
250.00
200.00
176.98
161.58
150.00
117.50 123.11
100.00 100.68 104.49
83.41 87.47 81.86
50.00
9.45
0.00
ENERO FEBRERO MARZO ABRIL
MIN MED MÁXIMO
NOTA: Este apartado se refiere al valor mínimo, la media y el valor máximo del subconjunto conformado por el precio promedio de cada período de mercado durante el mes.
49
MERCADO DE OPORTUNIDAD NACIONAL
50
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN MERCADO
DEPARATAMENTO POSDESPACHO
RESUMEN MENSUAL DE PLANTAS QUE PARTICIPAN EN EL MERCADO DE OPORTUNIDAD 2023
LAEIZ- JUTICALPA CISA-LA ESPERANZA PEÑA BLANCA GEOPLATANARES RIO BLANCO CHURUNE
MES
KWH PAGO(USD$) (USD$/KWH) KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH
ENE 57,248.00 17,476.67 0.3053 1,123,112.75 119,564.86 0.1065 781,251.78 79,273.01 0.1015 35,985.04 2,901.74 0.0806 3,620,846.02 367,374.30 0.1015 176.81 17.41 0.0985
FEB 0.00 0.00 0.0000 624,158.50 68,564.53 0.1099 606,680.35 63,788.20 0.1051 0.00 0.00 0.0000 2,634,606.68 276,796.03 0.1051 0.00 0.00 0.0000
MAR. 134,536.00 42,541.09 0.3162 831,969.00 107,475.38 0.1292 512,074.97 60,695.93 0.1185 0.00 0.00 0.0000 2,487,313.98 295,343.56 0.1187 0.00 0.00 0.0000
ABR. 439,800.00 122,406.56 0.2783 456,074.50 61,340.65 0.1345 311,061.94 38,491.68 0.1237 0.00 0.00 0.0000 1,931,620.18 240,777.70 0.1247 0.00 0.00 0.0000
TOTAL 631,584.00 182,424.32 0.2888 3,035,314.75 356,945.42 0.1176 2,211,069.04 242,248.82 0.1096 35,985.04 2,901.74 0.0806 10,674,386.86 1,180,291.59 0.1106 176.81 17.41 0.0985
ENE -12,106.19 2,969.72 -0.2453 2,132,744.35 217,056.86 0.1018 641,904.00 71,570.71 0.1115 682,164.77 67,730.02 0.0993 134,890.50 13,370.49 0.0991 828,943.00 102,438.02 0.1236
FEB. -28,905.38 -1,854.70 0.0642 2,780,593.04 301,497.09 0.1084 1,133,904.00 123,570.08 0.1090 373,532.48 39,173.61 0.1049 107,136.50 11,257.75 0.1051 1,629,878.00 206,869.25 0.1269
MAR. 1,432,948.69 423,990.94 0.2959 7,988,790.24 949,259.33 0.1188 2,493,900.00 293,199.54 0.1176 280,387.07 33,150.61 0.1182 87,902.50 10,335.14 0.1176 10,706,603.00 1,531,780.20 0.1431
ABR. 3,714,038.00 970,411.03 0.2613 8,204,948.57 1,012,062.05 0.1233 2,764,776.00 349,614.62 0.1265 166,701.66 20,301.78 0.1218 80,806.00 10,037.38 0.1242 20,352,376.00 2,800,964.33 0.1376
TOTAL 5,105,975.12 1,395,516.99 0.2733 21,107,076.20 2,479,875.33 0.1175 7,034,484.00 837,954.95 0.1191 1,502,785.98 160,356.02 0.1067 410,735.50 45,000.76 0.1096 33,517,800.00 4,642,051.80 0.1385
ENE 616,888.13 87,237.93 0.1414 1,012,044.37 104,698.32 0.1035 3,912,449.13 416,520.34 0.1065 1,793,087.15 192,281.02 0.1072 130,695.00 12,883.62 0.0986 114,639,563.39 11,932,960.34 0.1041
FEB. 840,901.00 119,326.30 0.1419 697,525.99 74,871.93 0.1073 1,805,702.20 199,810.57 0.1107 1,390,892.88 155,691.81 0.1119 20,989.00 2,242.06 0.1068 121,064,855.05 12,801,351.23 0.1057
MAR. 4,982,929.88 774,936.26 0.1555 542,710.47 65,443.00 0.1206 1,155,335.23 142,036.46 0.1229 682,684.75 81,566.91 0.1195 64,457.00 7,374.19 0.1144 152,826,971.48 18,077,017.69 0.1183
ABR. 14,322,583.12 2,061,287.04 0.1439 355,116.30 44,033.04 0.1240 542,480.44 66,466.18 0.1225 807,109.69 123,153.83 0.1526 222,714.00 26,749.78 0.1201 138,457,064.24 17,276,278.52 0.1248
TOTAL 20,763,302.13 3,042,787.53 0.1465 2,607,397.13 289,046.29 0.1109 7,415,967.00 824,833.55 0.1112 4,673,774.47 552,693.57 0.1183 438,855.00 49,249.65 0.1122 526,988,454.16 60,087,607.78 0.1140
AZUNOSA CAHSA EMCE CHOLOMA ACUMULADO
MES
KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH KWH PAGO(USD$) USD$/KWH
ENE 3,755,856.02 377,088.50 0.1004 4,188,548.87 417,626.00 0.0997 0.00 0.00 0.0000 140,076,292.89 14,603,039.88 0.1043
FEB. 4,698,052.08 498,085.99 0.1060 7,863,052.96 806,054.18 0.1025 0.00 0.00 0.0000 148,243,555.33 15,747,095.91 0.1062
MAR. 5,160,061.69 614,675.73 0.1191 8,180,191.58 935,897.60 0.1144 5,485,684.91 778,789.90 0.1420 206,037,452.44 25,225,509.46 0.1224
ABR. 4,772,474.08 598,080.72 0.1253 8,387,803.64 1,024,371.74 0.1221 9,142,268.50 1,271,943.98 0.1391 215,431,816.86 28,118,772.61 0.1305
TOTAL 18,386,443.87 2,087,930.94 0.1136 28,619,597.05 3,183,949.52 0.1113 14,627,953.41 2,050,733.88 0.1402 709,789,117.52 83,694,417.86 0.1179
LAEIZ- JUTICALPA CISA-LA ESPERANZA PEÑA BLANCA GEOPLATANARES RIO BLANCO CHURUNE PLANTA TÉRMICA LAEISZ
51
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN MERCADO
DEPARATAMENTO POSDESPACHO
LAEIZ- JUTICALPA
PARTICIPACION DE PLANTAS EN EL MERCADO DE ABRIL 2023
CISA-LA ESPERANZA
PEÑA BLANCA
GEOPLATANARES
RIO BLANCO
CHURUNE
2%
PLANTA TÉRMICA LAEISZ
4% PECSA
64% EL FARO
4% CECECAPA
0% ZACAPA
0%
1%
0% LUV
2%
ELCOSA
4% MANGUNGO
LA GLORIA
1%
0% CUYAMAPA
EECOPALSA
9% ENERSA
AZUNOSA
CAHSA
7%
0%
0%
0%
0% EMCE
52
OPERADOR DEL SISTEMA
GERENCIA OPERACIÓN MERCADO
DEPARATAMENTO POSDESPACHO
53
TRANSACCIONES DE ENERGÍA CON EL
MERCADO DE OPORTUNIDAD REGIONAL
54
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
COMPRAS
MER 2023
AGENTE PAIS ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
MWh 7,700.40 5,496.96 4,501.20 2,599.20 20,297.76
SUBTOTAL
CA US$ 925,053.73 672,232.66 546,043.81 318,594.85 2,461,925.05
CONTRATOS
US$/MWh 120.13 122.29 121.31 122.57 121.29
MWh 1,542.61 394.96 2,795.70 7,670.79 12,404.07
OPORTUNIDAD CA US$ 121,424.41 36,329.37 357,838.83 1,278,757.84 1,794,350.44
US$/MWh 78.71 91.98 128.00 166.70 144.66
MWh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EMERGENCIA CA US$ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
US$/MWh 0.00 0.00 0.00
MWh 9,243.01 5,891.92 7,296.90 10,269.99 32,701.83
TOTAL
CA US$ 1,046,478.14 708,562.03 903,882.64 1,597,352.69 4,256,275.49
COMPRAS
US$/MWh 113.22 120.26 123.87 155.54 130.15
COMPRAS/PAÍS
PAÍS ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
MWh 7,700.40 5,496.96 4,501.20 2,599.20 20,297.76
GUATEMALA US$ 925,053.73 672,232.66 546,043.81 318,594.85 2,461,925.05
US$/MWh 120.13 122.29 121.31 122.57 121.29
MWh 7,700.40 5,496.96 4,501.20 2,599.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,297.76
TOTAL US$ 925,053.73 672,232.66 546,043.81 318,594.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,461,925.05
US$/MWh 120.13 122.29 121.31 122.57 121.29
VENTAS
MER 2023
AGENTE PAIS ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
MWh 0.00 0.00 180.00 0.00 180.00
OPORTUNIDAD CA US$ 0.00 0.00 27,489.00 0.00 27,489.00
US$/MWh 0.00 0.00 152.72 0.00 152.72
55
RESUMEN DE TRANSACCIONES ECONÓMICAS
(DTER)
56
OPERADOR DEL SISTEMA
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
RESUMEN DEL DOCUMENTO DE TRANSACCIONES ECONÓMICAS
REGIONALES (DTER): RMER SIN PDC. 2023
OS/OM: OPERADOR DEL SISTEMA
MES ENERO FEBRERO MARZO ABRIL
REF. RUBRO/TRANSACCIÓN CARGO ABONO ABONO CARGO ABONO CARGO ABONO
100 ENERGÍA
110 Comprometidas en Contrato
111 Transacciones Programadas por Compromisos Contractuales
120 No Comprometidas en Contrato
121 Transacción Programada no Comprometida en Contratos por Retiro (TPNCret) 121,424.41 0.00 36,329.37 0.00 357,838.83 0.00 1,278,757.84 0.00
122 Transacción Programada no Comprometida en Contratos por Inyección (TPNCiny) 0.00 0.00 0.00 0.00 0.00 27,489.00 0.00 12,183.92
190 SUBTOTAL 121,424.41 0.00 36,329.37 0.00 357,838.83 27,489.00 1,278,757.84 12,183.92
200 SERVICIO DE TRANSMISIÓN
210 Cargo en el Mercado de Oportunidad Regional Asociado al Cumplimiento del Compromiso Contractual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
220 (CMORC)
Cargo variable de Transmisión neto RTR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
230 Cargo variable de Transmisión neto no RTR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
290 SUBTOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
300 TRANSACCIONES POR DESVIACIONES EN TIEMPO REAL
310 Desviaciones Normales 0.00 41,724.68 0.00 45,153.62 0.00 65,438.47 0.00 71,712.93
320 Desviaciones Significativas Autorizadas 0.00 0.00 0.00 2,837.76 0.00 862.03 0.00 0.00
330 Desviaciones Significativas no Autorizadas 13,032.99 0.00 19,955.99 0.00 14,508.70 0.00 8,454.44 0.00
340 Desviaciones Graves 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
341 Desviaciones Graves Tipo A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
342 Desviaciones Graves Tipo B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
343 Desviaciones Graves Tipo C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
344 Desviaciones Graves Tipo D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
345 Desviaciones Graves No Responsable de la Falla 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
346 Desviaciones Graves Responsable de la Falla 0.00 0.00 1,338.76 0.00 382.71 0.00 0.00 1,253.34
390 SUBTOTAL 13,032.99 41,724.68 21,294.75 47,991.38 14,891.41 66,300.50 8,454.44 72,966.27
57
ENERGÍA NO SUMINISTRADA
58
CENTRO NACIONAL DE DESPACHO
GERENCIA DE MERCADO
DEPARTAMENTO POSDESPACHO
ENERGIA NO SUMINISTRADA
CAUSA APERTURA HRS %
(KWH)
59
ENERGIA NO SUMINISTRADA MARZO 2022 A MARZO 2023
kWh
Apert
hrs
ENS Sistema kWh
2,100.00 15,000,000
13,500,000
1,800.00
12,000,000
1,500.00 10,500,000
Hrs/Apert
1,200.00 9,000,000
7,500,000
900.00 6,000,000
600.00 4,500,000
3,000,000
300.00
1,500,000
0.00 0
Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr
JUNIO
MARZO
kWh kWh
Apert
hrs ENS Mantenimiento kWh
Apert
hrs
ENS Fallas kWh
500.00 2,500,000 2,800,000
2,250,000 750.00 2,400,000
400.00 2,000,000
1,750,000 600.00 2,000,000
Hrs/Apert
Hrs/Apert
300.00 1,500,000
1,600,000
1,250,000 450.00
kWh kWh
Apert
hrs
ENS Reducción de Carga kWh
Apert
hrs
ENS Consecuencia kWh
600 2,800,000 750.00 3,600,000
3,300,000
500 2,400,000
625.00 3,000,000
2,700,000
2,000,000
400 500.00 2,400,000
Hrs/Apert
60
RESUMEN DE FALLAS EN EL SISTEMA
INTERCONECTADO NACIONAL
61
RESUMEN DE APERTURAS POR FALLA ABRIL 2023
ABRIL 2023
KWH NO KWH
AREA APERT HRS
ENTREGADOS RACIONADO
GENERACION
HIDRO DE EMBALSE 4 168 192,963 0
HIDRO EMPUNTABLE 1 0 1,300 0
HIDRO DE PASADA 16 75 132,935 0
EÓLICAS 0 0 0 0
BIOMASA 28 237 5,360,492 0
SOLAR 11 9 6,533 0
GEOTERMICA 6 3 43,948 0
TÉRMICAS 294 2,319 17,139,664 0
TOTAL GENERACIÓN 360 2,813 22,877,834 0
TRANSMISIÓN
LINEAS 51 94 1,528,573 851
LINEAS DE INTERCONEXIÓN 6 20 1,194,893
SUBESTACIONES 27 90 688,349 0
TOTAL TRANSMISIÓN 84 204 3,411,815 851
DISTRIBUCION
DIST CENTRO 74 34 224,546 224,546
DIST CENTRO REGIONALES 88 72 445,630 445,630
DIST SUR 40 16 174,637 174,637
TOTAL DIST CENTRO SUR 202 122 844,812 844,812
SAN PEDRO SULA 88 61 514,746 514,746
DIST NORTE REGIONAL 49 32 156,288 156,288
YORO 10 9 31,337 31,337
OCCIDENTE 3 10 23,327 23,327
TOTAL DIST NOR_OCCIDENTE 150 111 725,698 725,698
DIST LIT ATLANTICO 11 13 71,040 71,040
DIST LIT ATL REGIONALES 30 14 91,509 91,509
TOTAL DIST LIT ATLANTICO 41 28 162,549 162,549
62
RESUMEN DE FALLAS PERIODO ABRIL 2022 - ABRIL 2023
kWh kWh
Apert
hrs Sistema kWh
Apert
hrs
Generación kWh
Hrs/Apert
2,400.0 20,000,000
Hrs/Apert
2000 15,000,000
2,000.0
15,000,000 1600
1,600.0
1200 10,000,000
1,200.0 10,000,000
800.0 800
5,000,000 5,000,000
400.0 400
0.0 0 0 0
Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr
ABRIL ABRIL
kWh kWh
Apert
hrs
Transmisión kWh
Apert
hrs
Distribución kWh
600 4,000,000 600 3,000,000
3,500,000
500 500 2,500,000
3,000,000
Hrs/Apert
Hrs/Apert
400 400 2,000,000
2,500,000
1,500,000
200 200 1,000,000
1,000,000
100 100 500,000
500,000
0 0 0 0
Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr Abr May Jun Jul Ago Sep Oct Nov Dic Ene Feb Mar Abr
ABRIL ABRIL
63
RESUMEN DE MANTENIMIENTOS EN EL
SISTEMA INTERCONECTADO NACIONAL
64
RESUMEN DE APERTURAS POR MANTENIMIENTO (ABRIL) 2023
ABRIL 2023.
AREA APERTURA HRS MANTENIMIENTO
GENERACION
GENERACION SIN 110.00 1,568.35 ORDEN OPERACIÓN
TOTAL GENERACIÓN 110.00 1,568.35
TRANSMISION
LINEAS 28.00 149.23 ORDEN OPERACIÓN
SUBESTACIONES 98.00 444.18 ORDEN OPERACIÓN
TOTAL TRANSMISIÓN 126.00 593.41
DISTRIBUCION
DIST CENTRO 7.00 30.52 ORDEN OPERACIÓN
DIST CENTRO REGIONALES 3.00 21.22 ORDEN OPERACIÓN
DIST SUR 0.00 0.00 ORDEN OPERACIÓN
TOTAL DIST CENTRO SUR 10.00 51.74
SAN PEDRO SULA 17.00 79.30 ORDEN OPERACIÓN
DIST NORTE REGIONAL 1.00 0.05 ORDEN OPERACIÓN
OCCIDENTE 3.00 6.38 ORDEN OPERACIÓN
TOTAL DIST NOR_OCCIDENTE 21.00 85.73
65
RESUMEN MANTENIMIENTO MARZO 2022 - MARZO 2023
hrs
Apert Mantenimiento Sistema
4,000.00 350
300
3,000.00
250
Aperturas
Hrs
200
2,000.00
150
100
1,000.00
50
0.00 0
Mar Abr May Jun Jul Aug Sep Oct Nov Dic Ene Feb Mar
MARZO
hrs hrs
Apert Mant.Transmision/Subestación Apert Mantenimiento Generación
1000 180 2400 140
160 120
800 140 1800
100
120
Aperturas
Aperturas
Hrs
Hrs
600 80
100
1200
80 60
400
60
40
600
200 40
20
20
0 0 0 0
Mar Abr May Jun Jul Aug Sep Oct Nov Dic Ene Feb Mar Mar Abr May Jun Jul Aug Sep Oct Nov Dic Ene Feb Mar
MARZO MARZO
hrs hrs
Apert Mantenimiento Interconexion Apert Mantenimiento Distribución
240 500 80
9 70
400
180 60
Aperturas
Aperturas
50
Hrs
Hrs
6 300
120 40
200 30
3
60 20
100
10
0 0 0 0
Mar Abr May Jun Jul Aug Sep Oct Nov Dic Ene Feb Mar Mar Abr May Jun Jul Aug Sep Oct Nov Dic Ene Feb Mar
MARZO MARZO
66
ANEXOS FALLAS
67
ANEXOS 1- FALLAS EN GENERACIÓN
68
FALLAS PROPIAS DE GENERACIÓN
HIDROELÉCTRICA EMPUNTABLE, ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
CA EL CAJON 'U003 POTENCIA INVERSA 1 0.33 23,750.00 0.00
Total 'U003 1 0.33 23,750.00 0.00
LA[R] ARENAL 'U001 FALLA ELECTRICA 1 4.43 110,434.34 0.00
LA[R] ARENAL 'U001 FALLA EN LA PLANTA 1 70.30 0.00 0.00
Total 'U001 2 74.73 110,434.34 0.00
LA[R] ARENAL 'U003 FALLA EN LA PLANTA 1 93.30 58,779.00 0.00
Total 'U003 1 93.30 58,779.00 0.00
Total general 4 168.37 192,963.34 0.00
69
FALLAS PROPIAS DE GENERACIÓN
HIDROELÉCTRICA EMPUNTABLE, ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
LA[R] PLANTA OJO DE AGUA 'U003 FALLA EN LA PLANTA 1 0.43 1,300.00 0.00
Total 'U003 1 0.43 1,300.00 0.00
Total general 1 0.43 1,300.00 0.00
70
FALLAS PROPIAS EN GENERACIÓN
HIDROELÉCTRICA DE PASADA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
CA CECECAPA U001 FALLA EN LA PLANTA 1 64.87 103,786.67 0.00
Total U001 1 64.87 103,786.67 0.00
CA PENCALIGUE 'U001 FALLA EN LA PLANTA 1 5.52 22,066.67 0.00
Total 'U001 1 5.52 22,066.67 0.00
CE[R] CORONADO U001 FALLA EN LA PLANTA 4 0.53 1,920.00 0.00
Total U001 4 0.53 1,920.00 0.00
CE[R] LA ESPERANZA U001 FALLA EN LA PLANTA 1 0.27 266.67 0.00
Total U001 1 0.27 266.67 0.00
CE[R] ZINGUIZAPA U001 BAJO NIVEL DE EMBALSE 1 1.27 760.00 0.00
CE[R] ZINGUIZAPA U001 FALLA EN LA PLANTA 1 0.00 0.00 0.00
Total U001 2 1.27 760.00 0.00
LA[R] RIO BETULIA 'U001 FALLA EN LA PLANTA 5 1.25 1,681.67 0.00
Total 'U001 5 1.25 1,681.67 0.00
NO CUYAGUAL U001 FALLA EN LA PLANTA 1 1.37 1,913.33 0.00
Total U001 1 1.37 1,913.33 0.00
NO[R] CORTECITO 'U001 FALLA EN LA PLANTA 1 0.30 540.00 0.00
Total 'U001 1 0.30 540.00 0.00
Total general 16 75.37 132,935.00 0.00
71
FALLAS PROPIAS EN GENERACIÓN
BIOMASA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
CE TRES VALLES 'U001 FALLA EN CIRCUITO ASOCIADO A LA PLANT 1 0.25 1,250.00 0.00
CE TRES VALLES 'U001 FALLA EN LA PLANTA 2 0.28 3,611.67 0.00
CE TRES VALLES 'U001 PROBLEMA EN PROCESO DE PRODUCCION 1 4.45 66,750.00 0.00
Total 'U001 4 4.98 71,611.67 0.00
NO CAHSA 'U000 LLUVIASCON DESC. ELECT ATMFE (NC) 1 2.87 80,266.67 0.00
Total 'U000 1 2.87 80,266.67 0.00
NO CAHSA 'U001 FALLA EN LA PLANTA 1 0.15 1,791.00 0.00
Total 'U001 1 0.15 1,791.00 0.00
NO CAHSA 'U005 DESCONOCIDA MAYOR DE 3 MIN. 1 0.18 977.17 0.00
NO CAHSA 'U005 FALLA EN LA PLANTA 1 0.17 1,211.67 0.00
NO CAHSA 'U005 FALLAS EN AUXILIARES 1 0.45 2,160.00 0.00
Total 'U005 3 0.80 4,348.83 0.00
NO GREEN POWER 'U001 DESCONOCIDA MAYOR DE 3 MIN. 1 0.57 19,136.33 0.00
NO GREEN POWER 'U001 FALLA EN CALDERA 2 92.93 4,061,186.75 0.00
NO GREEN POWER 'U001 FALLA EN LA PLANTA 3 2.52 110,838.67 0.00
NO GREEN POWER 'U001 FUGA DE AGUA DE ENFRIAMIENTO 1 0.13 5,904.00 0.00
NO GREEN POWER 'U001 PROBLEMA EN GENERADOR 1 2.65 115,222.00 0.00
NO GREEN POWER 'U001 PROBLEMA EN PROCESO DE PRODUCCION 1 0.73 32,193.34 0.00
Total 'U001 9 99.53 4,344,481.09 0.00
NO IHSA U001 FALLA EN CALDERA 1 101.88 509,416.69 0.00
NO IHSA U001 FALLA EN LA PLANTA 1 1.30 9,373.00 0.00
Total U001 2 103.18 518,789.69 0.00
SU TERM LA GRECIA 'U001 FALLA EN CALDERA 2 1.90 2,392.50 0.00
SU TERM LA GRECIA 'U001 FALLA EN LA PLANTA 1 0.00 0.00 0.00
Total 'U001 3 1.90 2,392.50 0.00
SU TERM LA GRECIA 'U002 FALLA EN CIRCUITO ASOCIADO A LA PLANT 1 22.43 327,526.69 0.00
SU TERM LA GRECIA 'U002 FALLA EN CALDERA 1 0.62 6,616.83 0.00
SU TERM LA GRECIA 'U002 FALLA EN LA PLANTA 1 0.00 0.00 0.00
SU TERM LA GRECIA 'U002 PROB. SISTEMA ENFRIAMIENTO 1 0.00 0.00 0.00
SU TERM LA GRECIA 'U002 PROBLEMA EN PROCESO DE PRODUCCION 1 0.33 2,666.67 0.00
Total 'U002 5 23.38 336,810.19 0.00
Total general 28 236.80 5,360,491.64 0.00
72
FALLAS PROPIAS EN GENERACIÓN
SOLAR , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
NO PFV EL POLLITO 'U001 FALLA EN CIRCUITO ASOCIADO A LA PLANTA 1 0.25 1,550.00 0.00
Total 'U001 1 0.25 1,550.00 0.00
SU ENERBASA 'U001 FALLA EN LA PLANTA 1 0.88 574.17 0.00
Total 'U001 1 0.88 574.17 0.00
SU MARCOVIA U001 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 350.50 0.00
SU MARCOVIA U001 FALLA EN CIRCUITO ASOCIADO A LA PLANTA 3 1.57 1,972.67 0.00
Total U001 4 1.62 2,323.17 0.00
SU NACAOME II 'U001 DESCONOCIDA MAYOR DE 3 MIN. 1 0.02 706.33 0.00
SU NACAOME II 'U001 FALLA EN LA PLANTA 1 0.03 1,379.00 0.00
Total 'U001 2 0.05 2,085.33 0.00
SU SERSA CHOLUTECA I U001 FALLA EN CIRCUITO ASOCIADO A LA PLANTA 1 3.12 0.00 0.00
SU SERSA CHOLUTECA I U001 FALLA EN SENSORES 1 0.57 0.00 0.00
Total U001 2 3.68 0.00 0.00
SU SERSA CHOLUTECA II 'U001 FALLA EN CIRCUITO ASOCIADO A LA PLANTA 1 2.78 0.00 0.00
Total 'U001 1 2.78 0.00 0.00
Total general 11 9.27 6,532.67 0.00
73
FALLAS PROPIAS EN GENERACIÓN,GEOTERMICA
ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
CA GEOPLATANARES 'U001 BAJA PRESION DE VAPOR 2 1.80 20,672.00 0.00
CA GEOPLATANARES 'U001 FALLA EN LA PLANTA 2 0.72 11,014.50 0.00
Total 'U001 4 2.52 31,686.50 0.00
CA GEOPLATANARES 'U002 FALLA EN LA PLANTA 2 0.73 12,261.00 0.00
Total 'U002 2 0.73 12,261.00 0.00
Total general 6 3.25 43,947.50 0.00
74
FALLAS PROPIAS EN GENERACIÓN
TÉRMICA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
CE SANTA FE 'U004 DESCONOCIDA MAYOR DE 3 MIN. 1 0.00 0.00 0.00
Total 'U004 1 0.00 0.00 0.00
CE[R] LAEISZ JUTICALPA 'U001 DESCONOCIDA Y CON REVISION 1 1.62 16,199.00 0.00
Total 'U001 1 1.62 16,199.00 0.00
LA CEIBA TERMICA 'U002 FALLA EN CALDERA 1 8.80 0.00 0.00
LA CEIBA TERMICA 'U002 FUGA DE COMBUSTIBLE 1 4.00 20,000.00 0.00
LA CEIBA TERMICA 'U002 FUGAS DE ACEITE 1 12.95 64,750.00 0.00
LA CEIBA TERMICA 'U002 PROB. SISTEMA ENFRIAMIENTO 1 1.55 0.00 0.00
Total 'U002 4 27.30 84,750.00 0.00
LA CEIBA TERMICA 'U003 FALLA EN CILINDRO 1 14.17 70,833.34 0.00
LA CEIBA TERMICA 'U003 FALLA EN LA PLANTA 2 20.92 104,583.33 0.00
LA CEIBA TERMICA 'U003 GASES EN EL CARTER 1 4.60 8,740.00 0.00
Total 'U003 4 39.68 184,156.66 0.00
LA LA ENSENADA 'U002 FALLA EN ARRANQUE DE LA UNIDAD 2 9.52 0.00 0.00
LA LA ENSENADA 'U002 FALLA EN CILINDRO 1 6.57 52,533.33 0.00
LA LA ENSENADA 'U002 FALLA EN SENSORES 1 0.28 2,266.67 0.00
LA LA ENSENADA 'U002 FUGA DE COMBUSTIBLE 1 2.08 16,666.67 0.00
Total 'U002 5 18.45 71,466.66 0.00
LA LA ENSENADA 'U003 ALTA TEMPERATURA DE CILINDROS 1 2.52 4,278.33 0.00
Total 'U003 1 2.52 4,278.33 0.00
LA LA ENSENADA 'U004 FALLA EN CILINDRO 1 5.47 43,733.33 0.00
LA LA ENSENADA 'U004 FALLA EN SENSORES 1 4.20 33,600.00 0.00
LA LA ENSENADA 'U004 FALLAS EN AUXILIARES 1 12.15 97,200.01 0.00
LA LA ENSENADA 'U004 PROB EN INYECTORES 1 1.95 15,600.00 0.00
Total 'U004 4 23.77 190,133.34 0.00
LA LA ENSENADA 'U005 FALLA BOMBA DE INYECCION 1 4.53 36,266.67 0.00
LA LA ENSENADA 'U005 FALLA EN CILINDRO 1 7.47 59,733.34 0.00
LA LA ENSENADA 'U005 FALLAS EN AUXILIARES 1 0.48 0.00 0.00
Total 'U005 3 12.48 96,000.00 0.00
LA LA ENSENADA 'U006 FALLAS EN AUXILIARES 2 1.27 3,600.00 0.00
LA LA ENSENADA 'U006 PROB. DE SOBRETEMPERATURA 1 10.27 82,133.33 0.00
LA LA ENSENADA 'U006 PROBLEMA EN GENERADOR 1 0.77 6,133.33 0.00
Total 'U006 4 12.30 91,866.66 0.00
LA LA ENSENADA 'U007 FILTRO PRINCIPAL ACEITE 1 0.92 0.00 0.00
LA LA ENSENADA 'U007 BAJA TEMPERATURA 1 5.48 5,647.83 0.00
LA LA ENSENADA 'U007 DESCONOCIDA MAYOR DE 3 MIN. 1 0.17 1,333.33 0.00
LA LA ENSENADA 'U007 FALLA EN ARRANQUE DE LA UNIDAD 1 2.82 0.00 0.00
LA LA ENSENADA 'U007 FALLA EN CILINDRO 1 3.18 25,466.67 0.00
LA LA ENSENADA 'U007 PROBLEMA EN GENERADOR 1 0.58 4,666.67 0.00
LA LA ENSENADA 'U007 PROBLEMA SISTEMA COMBUSTIBLE 1 0.78 0.00 0.00
Total 'U007 7 13.93 37,114.50 0.00
LA LA ENSENADA 'U008 PROBLEMA EN GENERADOR 1 1.12 8,933.33 0.00
Total 'U008 1 1.12 8,933.33 0.00
LA LA ENSENADA 'U009 FILTRO PRINCIPAL ACEITE 1 1.60 0.00 0.00
LA LA ENSENADA 'U009 ALTA TEMPERATURA EN BANCADA 1 11.35 90,800.00 0.00
LA LA ENSENADA 'U009 BAJA PRESION DE ACEITE 1 0.73 5,866.67 0.00
LA LA ENSENADA 'U009 FALLA EN LA PLANTA 1 12.70 101,599.99 0.00
LA LA ENSENADA 'U009 FALLAS EN AUXILIARES 1 1.75 980.00 0.00
LA LA ENSENADA 'U009 FUGAS DE ACEITE 1 1.88 15,066.67 0.00
Total 'U009 6 30.02 214,313.33 0.00
LA LA ENSENADA 'U010 FILTRO PRINCIPAL ACEITE 1 1.78 11,021.00 0.00
LA LA ENSENADA 'U010 FALLAS EN AUXILIARES 1 0.43 3,466.67 0.00
LA LA ENSENADA 'U010 PROB EN TURBOCARGADOR 1 8.57 68,533.34 0.00
LA LA ENSENADA 'U010 PROBLEMA EN GENERADOR 1 0.92 7,333.33 0.00
Total 'U010 4 11.70 90,354.34 0.00
LA LAEISZ CEIBA 'U001 ALTA TEMP GASES ESCAPE 1 0.30 2,400.00 0.00
Total 'U001 1 0.30 2,400.00 0.00
LA PLTA. TERMICA LAIESZ U001 LLUVIAS EN EL AREA (NC) 1 15.17 137,258.33 0.00
Total U001 1 15.17 137,258.33 0.00
75
FALLAS PROPIAS EN GENERACIÓN
TÉRMICA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
NO BECOSA 'U002 PROB. DE SOBRETEMPERATURA 1 1.20 42,432.00 0.00
Total 'U002 1 1.20 42,432.00 0.00
NO ELCOSA 'U003 ALTA TEMPERATURA DE CILINDROS 1 3.53 0.00 0.00
Total 'U003 1 3.53 0.00 0.00
NO ELCOSA 'U004 GASES EN EL CARTER 1 1.05 10,500.00 0.00
Total 'U004 1 1.05 10,500.00 0.00
NO ELCOSA 'U005 FUGA DE COMBUSTIBLE 1 0.22 0.00 0.00
Total 'U005 1 0.22 0.00 0.00
NO ELCOSA 'U006 SOBREVELOCIDAD 2 1.22 5,956.67 0.00
Total 'U006 2 1.22 5,956.67 0.00
NO ELCOSA 'U007 FUGA DE COMBUSTIBLE 1 4.30 43,000.00 0.00
Total 'U007 1 4.30 43,000.00 0.00
NO ELCOSA 'U008 FUGA DE AIRE 1 0.40 4,000.00 0.00
NO ELCOSA 'U008 FUGA DE COMBUSTIBLE 1 8.58 85,575.84 0.00
NO ELCOSA 'U008 PROB EN EL GOBERNADOR 1 0.60 6,000.00 0.00
Total 'U008 3 9.58 95,575.84 0.00
NO ENERSA 'U002 FALLA EN ARRANQUE DE LA UNIDAD 1 152.15 0.00 0.00
NO ENERSA 'U002 FALLA EN CILINDRO 1 13.35 0.00 0.00
NO ENERSA 'U002 FALLA EN EL SISTEMA DE ACEITE 1 38.88 673,070.44 0.00
Total 'U002 3 204.38 673,070.44 0.00
NO ENERSA 'U004 FILTRO PRINCIPAL ACEITE 1 1.52 27,300.00 0.00
NO ENERSA 'U004 ALTA TEMPERATURA DE CILINDROS 1 1.55 25,931.50 0.00
NO ENERSA 'U004 FALLA EN CILINDRO 1 5.78 0.00 0.00
Total 'U004 3 8.85 53,231.50 0.00
NO ENERSA 'U005 ALTA TEMPERATURA DE CILINDROS 1 0.88 16,209.17 0.00
NO ENERSA 'U005 PROB EN TURBOCARGADOR 1 2.73 43,050.00 0.00
NO ENERSA 'U005 PROB. SISTEMA LUBRICACION 1 3.73 67,200.01 0.00
Total 'U005 3 7.35 126,459.18 0.00
NO ENERSA 'U006 ALTA TEMPERATURA DE CILINDROS 1 1.33 24,000.00 0.00
NO ENERSA 'U006 FALLA EN CILINDRO 1 37.45 678,219.56 0.00
NO ENERSA 'U006 FALLAS EN AUXILIARES 1 3.48 0.00 0.00
NO ENERSA 'U006 FUGA DE COMBUSTIBLE 1 3.22 57,900.00 0.00
NO ENERSA 'U006 PROB. DE SOBRETEMPERATURA 1 2.75 0.00 0.00
NO ENERSA 'U006 PROB. SISTEMA LUBRICACION 1 0.42 7,587.50 0.00
NO ENERSA 'U006 PROBLEMA EN GENERADOR 1 1.60 28,800.00 0.00
Total 'U006 7 50.25 796,507.07 0.00
NO ENERSA 'U008 BAJA PRESION SIST COMBUSTIBLE 1 0.18 3,300.00 0.00
NO ENERSA 'U008 FALLA EN CALDERA 1 2.28 4,589.50 0.00
NO ENERSA 'U008 FALLA EN CILINDRO 1 4.68 84,300.00 0.00
NO ENERSA 'U008 FALLA EN PLC 1 0.37 6,600.00 0.00
NO ENERSA 'U008 FUGAS DE ACEITE 1 0.98 2,507.50 0.00
Total 'U008 5 8.50 101,297.00 0.00
NO ENERSA 'U009 ALTA TEMP CABEZA DE BIELA 1 33.60 327,263.97 0.00
NO ENERSA 'U009 ALTA TEMPERATURA DE CILINDROS 1 2.25 39,082.50 0.00
NO ENERSA 'U009 FALLA EN LA PLANTA 1 0.32 5,741.17 0.00
NO ENERSA 'U009 PROB EN TURBOCARGADOR 1 0.15 1,200.00 0.00
NO ENERSA 'U009 PROBLEMA EN GENERADOR 1 0.47 8,400.00 0.00
Total 'U009 5 36.78 381,687.64 0.00
NO ENERSA 'U010 BAJA PRESION SIST COMBUSTIBLE 1 0.33 6,000.00 0.00
NO ENERSA 'U010 FALLA EN LA PLANTA 1 476.12 0.00 0.00
NO ENERSA 'U010 FUGAS DE ACEITE 1 1.68 30,300.00 0.00
Total 'U010 3 478.13 36,300.00 0.00
NO ENERSA 'U011 ALTA TEMP CABEZA DE BIELA 1 15.47 283,504.00 0.00
NO ENERSA 'U011 BAJO NIVEL DE ACEITE 1 1.03 0.00 0.00
NO ENERSA 'U011 FUGA DE COMBUSTIBLE 1 3.50 63,000.00 0.00
Total 'U011 3 20.00 346,504.00 0.00
NO ENERSA 'U012 FUGAS DE ACEITE 1 1.77 26,500.00 0.00
Total 'U012 1 1.77 26,500.00 0.00
NO ENERSA 'U013 ALTA TEMPERATURA DE CILINDROS 2 5.03 90,754.00 0.00
NO ENERSA 'U013 PROB. SISTEMA LUBRICACION 1 1.78 32,100.00 0.00
Total 'U013 3 6.82 122,854.00 0.00
NO ENERSA 'U014 ALTA TEMPERATURA DE CILINDROS 1 4.00 72,000.00 0.00
NO ENERSA 'U014 FALLA EN ARRANQUE DE LA UNIDAD 1 0.30 0.00 0.00
76
FALLAS PROPIAS EN GENERACIÓN
TÉRMICA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
NO ENERSA 'U014 FALLA EN CILINDRO 1 0.87 15,600.00 0.00
NO ENERSA 'U014 FALLA EN LA PLANTA 1 3.23 0.00 0.00
Total 'U014 4 8.40 87,600.00 0.00
NO ENERSA 'U015 PROBLEMA EN GENERADOR 1 286.77 5,161,800.00 0.00
Total 'U015 1 286.77 5,161,800.00 0.00
NO PECSA 'U001 ALTA TEMP AGUA SIST. ENFRIAM. 1 0.07 848.67 0.00
NO PECSA 'U001 ALTA TEMPERATURA DE ACEITE 1 0.20 2,576.00 0.00
NO PECSA 'U001 ALTA TEMPERATURA DE CILINDROS 10 5.63 72,791.00 0.00
NO PECSA 'U001 DESCONOCIDA MAYOR DE 3 MIN. 2 0.15 2,542.50 0.00
NO PECSA 'U001 FALLA EN CALDERA 1 0.10 1,800.00 0.00
NO PECSA 'U001 FALLA EN LA PLANTA 4 2.82 23,037.17 0.00
NO PECSA 'U001 FUGAS DE ACEITE 2 0.98 17,700.00 0.00
Total 'U001 21 9.95 121,295.34 0.00
NO PECSA 'U002 ALTA TEMPERATURA DE ACEITE 1 0.20 2,390.00 0.00
NO PECSA 'U002 ALTA TEMPERATURA DE CILINDROS 14 4.77 34,891.33 0.00
NO PECSA 'U002 BAJA TEMPERATURA 1 0.10 1,800.00 0.00
NO PECSA 'U002 DESCONOCIDA MAYOR DE 3 MIN. 5 0.42 6,213.00 0.00
NO PECSA 'U002 FALLA EN VALVULA ADMISION 1 2.08 37,500.00 0.00
NO PECSA 'U002 FALLA EN CALDERA 2 123.97 2,017,799.75 0.00
NO PECSA 'U002 FALLA EN CILINDRO 2 5.95 41,097.00 0.00
NO PECSA 'U002 FALLA EN LA PLANTA 4 1.85 27,323.33 0.00
Total 'U002 30 139.33 2,169,014.42 0.00
NO PECSA 'U003 ALTA TEMPERATURA DE CILINDROS 3 1.78 21,452.00 0.00
NO PECSA 'U003 ALTA TEMPERATURA EN BANCADA 1 1.43 25,083.33 0.00
NO PECSA 'U003 FALLA BOMBA DE INYECCION 1 0.92 16,500.00 0.00
NO PECSA 'U003 FALLA EN CALDERA 1 0.13 0.00 0.00
NO PECSA 'U003 FALLA EN LA PLANTA 1 7.65 70,839.00 0.00
NO PECSA 'U003 FALLAS EN AUXILIARES 3 64.65 157,500.00 0.00
NO PECSA 'U003 PROB. DE SOBRETEMPERATURA 1 7.75 0.00 0.00
NO PECSA 'U003 PROBLEMA SISTEMA COMBUSTIBLE 1 0.05 900.00 0.00
Total 'U003 12 84.37 292,274.33 0.00
NO TER EMCE CHOLOM 'U001 ALTA TEMP GASES ESCAPE 1 1.18 13,016.67 0.00
NO TER EMCE CHOLOM 'U001 ALTA TEMPERATURA DE CILINDROS 3 44.57 139,536.00 0.00
NO TER EMCE CHOLOM 'U001 BAJA PRESION DE AIRE 1 1.82 0.00 0.00
NO TER EMCE CHOLOM 'U001 BAJA TEMPERATURA 1 7.00 20,440.00 0.00
NO TER EMCE CHOLOM 'U001 BAJO NIVEL DE COMBUSTIBLE 1 4.17 41,666.66 0.00
NO TER EMCE CHOLOM 'U001 FALLAS EN AUXILIARES 1 5.78 0.00 0.00
Total 'U001 8 64.52 214,659.33 0.00
NO TER EMCE CHOLOM 'U002 ALTA TEMPERATURA DE CILINDROS 3 40.42 413,575.86 0.00
NO TER EMCE CHOLOM 'U002 BAJA PRESION DE AIRE 1 1.95 0.00 0.00
NO TER EMCE CHOLOM 'U002 BAJO NIVEL 1 0.37 3,809.67 0.00
NO TER EMCE CHOLOM 'U002 BAJO NIVEL DE COMBUSTIBLE 1 5.82 58,166.66 0.00
NO TER EMCE CHOLOM 'U002 FALLA EN ARRANQUE DE LA UNIDAD 1 15.88 0.00 0.00
NO TER EMCE CHOLOM 'U002 FALLA EN CILINDRO 1 10.02 0.00 0.00
NO TER EMCE CHOLOM 'U002 FALLA EN LA PLANTA 2 1.87 13,188.67 0.00
NO TER EMCE CHOLOM 'U002 FALLA REGULACION POTENCIA 1 2.70 29,700.00 0.00
NO TER EMCE CHOLOM 'U002 FUGA DE AGUA DE ENFRIAMIENTO 1 20.47 0.00 0.00
NO TER EMCE CHOLOM 'U002 FUGA DE AIRE DE SOBREALIMENTACION 1 6.72 67,166.67 0.00
NO TER EMCE CHOLOM 'U002 FUGAS DE ACEITE 1 1.15 5,646.50 0.00
NO TER EMCE CHOLOM 'U002 GASES EN EL CARTER 3 22.03 83,071.66 0.00
NO TER EMCE CHOLOM 'U002 POTENCIA INVERSA 2 1.38 13,478.67 0.00
NO TER EMCE CHOLOM 'U002 PROBLEMAS EN LA EXCITACION 2 2.07 22,733.33 0.00
Total 'U002 21 132.83 710,537.69 0.00
NO TER EMCE CHOLOM 'U003 BAJA PRESION DE AIRE 1 1.95 0.00 0.00
NO TER EMCE CHOLOM 'U003 FALLA EN LA PLANTA 1 0.02 178.33 0.00
NO TER EMCE CHOLOM 'U003 FALLAS EN AUXILIARES 1 2.33 0.00 0.00
Total 'U003 3 4.30 178.33 0.00
NO TER EMCE CHOLOM 'U005 ALTA TEMP AGUA SIST. ENFRIAM. 1 0.98 9,184.33 0.00
NO TER EMCE CHOLOM 'U005 ALTA TEMPERATURA DE CILINDROS 3 52.17 8,085.67 0.00
NO TER EMCE CHOLOM 'U005 BAJA PRES DE AGUA DE ENFRIAM. 2 144.93 1,148,160.62 0.00
NO TER EMCE CHOLOM 'U005 BAJA PRESION DE AIRE 1 1.95 0.00 0.00
NO TER EMCE CHOLOM 'U005 BAJA PRESION SIST COMBUSTIBLE 1 1.33 0.00 0.00
77
FALLAS PROPIAS EN GENERACIÓN
TÉRMICA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
NO TER EMCE CHOLOM 'U005 BAJO NIVEL DE COMBUSTIBLE 1 6.72 67,166.67 0.00
NO TER EMCE CHOLOM 'U005 FALLA EN CILINDRO 1 7.45 81,950.00 0.00
NO TER EMCE CHOLOM 'U005 FALLA EN LA PLANTA 3 3.38 16,089.50 0.00
NO TER EMCE CHOLOM 'U005 FALLA EN RADIADOR 1 4.52 2,122.83 0.00
NO TER EMCE CHOLOM 'U005 PROBLEMAS EN LA EXCITACION 1 0.80 8,800.00 0.00
Total 'U005 15 224.23 1,341,559.62 0.00
NO[R] EL FARO 'U002 FUGA DE AGUA DE ENFRIAMIENTO 1 11.23 15,614.33 0.00
NO[R] EL FARO 'U002 FUGA DE AIRE DE SOBREALIMENTACION 1 16.75 113,900.00 0.00
Total 'U002 2 27.98 129,514.33 0.00
NO[R] EL FARO 'U004 PROB EN TURBOCARGADOR 1 0.18 1,261.33 0.00
NO[R] EL FARO 'U004 PROBLEMA EN GENERADOR 1 1.47 0.00 0.00
Total 'U004 2 1.65 1,261.33 0.00
NO LA PUERTA 'U001 FUGAS DE ACEITE 1 0.38 4,216.67 0.00
NO LA PUERTA 'U001 PROB. MECANICOS 1 1.08 0.00 0.00
NO LA PUERTA 'U001 PROBLEMAS EN LA EXCITACION 2 42.33 635,000.00 0.00
Total 'U001 4 44 639217 0
SU LUFUSSA III 'U001 ALTA TEMPERATURA DE CILINDROS 1 29.80 447,893.97 0.00
SU LUFUSSA III 'U001 PROB. MECANICOS 1 0.22 3,399.50 0.00
Total 'U001 2 30.02 451,293.47 0.00
SU LUFUSSA III 'U002 ALTA TEMPERATURA DE CILINDROS 1 1.72 29,183.33 0.00
SU LUFUSSA III 'U002 BAJA TEMPERATURA 1 1.08 14,278.33 0.00
SU LUFUSSA III 'U002 FALLA ELECTRICA 2 0.75 12,203.33 0.00
SU LUFUSSA III 'U002 FALLAS EN AUXILIARES 4 4.45 74,565.00 0.00
SU LUFUSSA III 'U002 GASES EN EL CARTER 1 0.30 5,100.00 0.00
Total 'U002 9 8.30 135,330.00 0.00
SU LUFUSSA III 'U003 ALTA TEMPERATURA DE CILINDROS 1 3.15 49,707.00 0.00
SU LUFUSSA III 'U003 BAJA PRESION DE ACEITE 1 1.12 18,358.00 0.00
SU LUFUSSA III 'U003 SOBREVELOCIDAD 1 0.10 1,051.00 0.00
Total 'U003 3 4.37 69,116.00 0.00
SU LUFUSSA III 'U004 ALTA TEMPERATURA DE ACEITE 2 0.27 1,284.00 0.00
SU LUFUSSA III 'U004 FALLA EN ARRANQUE DE LA UNIDAD 1 1.08 0.00 0.00
SU LUFUSSA III 'U004 FALLA EN LA PLANTA 1 0.67 0.00 0.00
Total 'U004 4 2.02 1,284.00 0.00
SU LUFUSSA III 'U005 FUGA DE AIRE 1 0.93 0.00 0.00
Total 'U005 1 0.93 0.00 0.00
SU LUFUSSA III 'U006 ALTA TEMPERATURA DE CILINDROS 1 0.07 1,133.33 0.00
Total 'U006 1 0.07 1,133.33 0.00
SU LUFUSSA III 'U007 FALLA EN PLC 1 0.63 10,766.67 0.00
SU LUFUSSA III 'U007 FALLAS EN AUXILIARES 2 0.98 16,716.67 0.00
Total 'U007 3 1.62 27,483.33 0.00
SU LUFUSSA III 'U009 FALLA EN LA PLANTA 1 0.03 566.67 0.00
SU LUFUSSA III 'U009 PROBLEMA SISTEMA COMBUSTIBLE 1 0.22 3,111.33 0.00
Total 'U009 2 0.25 3,678.00 0.00
SU LUFUSSA III 'U010 BAJA PRESION SIST COMBUSTIBLE 1 0.15 1,168.50 0.00
SU LUFUSSA III 'U010 FALLA EN CILINDRO 1 1.38 23,516.67 0.00
SU LUFUSSA III 'U010 FALLA EN PLC 1 0.57 9,633.33 0.00
SU LUFUSSA III 'U010 FUGA DE COMBUSTIBLE 1 5.30 90,100.01 0.00
SU LUFUSSA III 'U010 PROB. MECANICOS 1 1.02 0.00 0.00
SU LUFUSSA III 'U010 PROBLEMA SISTEMA COMBUSTIBLE 1 0.22 3,490.50 0.00
Total 'U010 6 8.63 127,909.01 0.00
SU LUFUSSA III 'U011 ALTA TEMP AGUA SIST. ENFRIAM. 1 1.92 32,583.34 0.00
Total 'U011 1 1.92 32,583.34 0.00
SU LUFUSSA III 'U012 ALTA TEMP AGUA SIST. ENFRIAM. 1 0.58 9,012.50 0.00
SU LUFUSSA III 'U012 ALTA TEMPERATURA DE ACEITE 2 0.92 0.00 0.00
SU LUFUSSA III 'U012 ALTA TEMPERATURA DE CILINDROS 1 1.08 18,416.67 0.00
SU LUFUSSA III 'U012 FALLA EN CILINDRO 1 0.17 2,833.33 0.00
SU LUFUSSA III 'U012 FALLAS EN AUXILIARES 1 4.68 79,616.67 0.00
SU LUFUSSA III 'U012 SOBREVELOCIDAD 1 0.37 3,666.67 0.00
Total 'U012 7 7.80 113,545.84 0.00
SU LUFUSSA III 'U013 BAJA PRESION SIST COMBUSTIBLE 1 0.10 1,285.00 0.00
SU LUFUSSA III 'U013 PROBLEMA SISTEMA COMBUSTIBLE 1 0.22 3,583.67 0.00
Total 'U013 2 0.32 4,868.67 0.00
SU LUFUSSA III 'U014 ALTA TEMPERATURA DE CILINDROS 1 0.62 10,483.33 0.00
SU LUFUSSA III 'U014 BAJA PRESION DE ACEITE 1 0.05 850.00 0.00
SU LUFUSSA III 'U014 FALLA EN RADIADOR 1 1.70 2,244.00 0.00
SU LUFUSSA III 'U014 PROBLEMA SISTEMA COMBUSTIBLE 1 0.20 3,004.00 0.00
Total 'U014 4 2.57 16,581.33 0.00
SU LUFUSSA III 'U015 BAJA TEMPERATURA 1 0.07 431.33 0.00
78
FALLAS PROPIAS EN GENERACIÓN
TÉRMICA , ABRIL 2023
ABRIL 2023
AREA SUBESTACION UNIDAD CAUSA
APERT HRS KWH NE KWH NR
SU LUFUSSA III 'U015 DESCONOCIDA MAYOR DE 3 MIN. 1 0.32 0.00 0.00
SU LUFUSSA III 'U015 FALLA EN LA PROTECCION 1 1.08 18,416.67 0.00
Total 'U015 3 1.47 18,848.00 0.00
SU LUFUSSA III 'U016 BAJA PRES DE AGUA DE ENFRIAM. 1 0.25 2,485.00 0.00
SU LUFUSSA III 'U016 PROB EN TURBOCARGADOR 1 0.73 12,466.67 0.00
Total 'U016 2 0.98 14,951.67 0.00
SU LUFUSSA VALLE 'U001 BAJA PRES DE AGUA DE ENFRIAM. 2 0.50 3,667.50 0.00
SU LUFUSSA VALLE 'U001 SOBREVELOCIDAD 4 121.45 1,012,747.83 0.00
Total 'U001 6 121.95 1,016,415.33 0.00
SU LUFUSSA VALLE 'U002 ACCION HUMANA INVOLUNTARIA (NC) 1 0.07 666.67 0.00
SU LUFUSSA VALLE 'U002 ALTA TEMP AGUA SIST. ENFRIAM. 1 0.15 69.00 0.00
SU LUFUSSA VALLE 'U002 ALTA TEMP EN CAMISAS 1 29.58 0.00 0.00
SU LUFUSSA VALLE 'U002 FALLA EN LA PLANTA 1 0.10 1,000.00 0.00
SU LUFUSSA VALLE 'U002 FALLA EN PROGRAMA PLC 1 0.03 333.33 0.00
Total 'U002 5 29.93 2,069.00 0.00
SU LUFUSSA VALLE 'U005 FALLAS EN AUXILIARES 1 0.18 1,833.33 0.00
Total 'U005 1 0.18 1,833.33 0.00
SU LUFUSSA VALLE 'U006 FALLA EN LA PROTECCION 1 1.83 18,333.33 0.00
SU LUFUSSA VALLE 'U006 FUGA DE AIRE DE SOBREALIMENTACION 1 0.63 6,903.33 0.00
Total 'U006 2 2.47 25,236.67 0.00
SU LUFUSSA VALLE 'U007 ALTA TEMP AGUA SIST. ENFRIAM. 2 0.28 2,053.50 0.00
SU LUFUSSA VALLE 'U007 BAJA PRES DE AGUA DE ENFRIAM. 9 1.50 14,808.00 0.00
SU LUFUSSA VALLE 'U007 FALLA ELECTRICA 1 9.08 95,647.49 0.00
SU LUFUSSA VALLE 'U007 FALLA EN LA PLANTA 2 0.28 2,983.50 0.00
Total 'U007 14 11.15 115,492.49 0.00
Total general 294 2,319.35 17,139,664.02 0.00
79
ANEXOS 2- FALLAS EN TRANSMISIÓN
80
FALLAS PROPIAS DE
TRANSMISIÓN, ABRIL 2023
ABRIL 2023
AREA SUBESTACION LINEA CAUSA
APERT HRS KWH NE KWH NR
CA CAÑAVERAL 'L429 FALLA EN CRUCETE 1 0.00 0.00 0.00
Total 'L429 1 0.00 0.00 0.00
CA CAÑAVERAL 'L550 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 1,753.00 0.00
CA CAÑAVERAL 'L550 RAMAS SOBRE LA LINEA 1 0.10 1,026.00 0.00
Total 'L550 2 0.20 2,779.00 0.00
CA EL NISPERO 'L429 DERRUMBES (NC) 1 0.37 0.00 0.00
Total 'L429 1 0.37 0.00 0.00
CA EL NISPERO 'L430 DESCONOCIDA MAYOR DE 3 MIN. 1 0.13 1,581.33 0.00
Total 'L430 1 0.13 1,581.33 0.00
CA RIO LINDO 'L502 DESCONOCIDA MAYOR DE 3 MIN. 1 1.48 771.33 0.00
Total 'L502 1 1.48 771.33 0.00
CE AMARATECA 'L558 DESCONOCIDA MAYOR DE 3 MIN. 1 3.08 189,224.17 0.00
CE AMARATECA 'L558 OBJETOS EN LA LINEA (NC) 1 4.73 352,633.34 0.00
CE AMARATECA 'L558 POSTES O TORRES CHOCADAS (NC) 1 1.42 119,708.33 0.00
Total 'L558 3 9.23 661,565.84 0.00
CE LA LEONA 'L406 PUENTE DANADO (ROTO) 1 33.72 35,739.66 0.00
Total 'L406 1 33.72 35,739.66 0.00
CE LAINEZ 'L421 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 466.67 466.67
Total 'L421 1 0.12 466.67 466.67
CE SANTA FE 'L552 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 1,198.33 0.00
Total 'L552 1 0.08 1,198.33 0.00
CE[R] COMAYAGUA 'L558 DESCONOCIDA MAYOR DE 3 MIN. 2 1.83 112,783.50 0.00
Total 'L558 2 1.83 112,783.50 0.00
CE[R] DANLI 'L424 DESCONOCIDA MAYOR DE 3 MIN. 1 2.75 23,237.50 0.00
Total 'L424 1 2.75 23,237.50 0.00
CE[R] GUAIMACA 'L441 LLUVIAS EN EL AREA (NC) 1 0.20 5,408.00 0.00
Total 'L441 1 0.20 5,408.00 0.00
CE[R] GUAIMACA 'L442 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 2,776.00 0.00
CE[R] GUAIMACA 'L442 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 182.50 0.00
CE[R] JUTICALPA 'L442 DESCONOCIDA Y CON REVISION 1 0.02 440.00 0.00
Total 'L442 3 0.13 3,398.50 0.00
CE[R] JUTICALPA 'L443 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 772.00 0.00
Total 'L443 1 0.05 772.00 0.00
CE[R] JUTICALPA II 'L650 ALTO VOLTAJE 3 5.67 0.00 0.00
CE[R] JUTICALPA II 'L650 BAJO VOLTAJE 1 0.10 60.00 0.00
CE[R] JUTICALPA II 'L650 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 2,470.00 0.00
CE[R] JUTICALPA II 'L650 OSCILACIONES DE VOLTAJE 6 8.42 0.00 0.00
CE[R] PATUCA III 'L650 ALTO VOLTAJE 1 0.23 23.33 0.00
Total 'L650 12 14.52 2,553.33 0.00
LA LA ENSENADA 'L518 LLUVIAS EN EL AREA (NC) 1 0.07 401.33 0.00
LA SAN ISIDRO 'L518 DESCONOCIDA MAYOR DE 3 MIN. 1 0.18 1,989.17 0.00
LA SAN ISIDRO 'L518 LLUVIAS EN EL AREA (NC) 1 0.35 3,916.50 0.00
Total 'L518 3 0.60 6,307.00 0.00
LA[R] TELA 'L516 DESCONOCIDA MAYOR DE 3 MIN. 1 0.15 4,950.00 0.00
Total 'L516 1 0.15 4,950.00 0.00
NO BERMEJO 'L509 DESCONOCIDA MAYOR DE 3 MIN. 1 0.13 24.00 0.00
Total 'L509 1 0.13 24.00 0.00
NO CHOLOMA 'L274 FALLA EN LA LINEA 1 7.28 0.00 0.00
Total 'L274 1 7.28 0.00 0.00
NO CHOLOMA 'L513 LLUVIAS EN EL AREA (NC) 1 3.93 123,900.00 0.00
Total 'L513 1 3.93 123,900.00 0.00
NO SAN PEDRO SULA 'L523 ROR PERSONAL DE CONTROL ELECTRON 1 0.52 1,741.17 0.00
Total 'L523 1 0.52 1,741.17 0.00
NO SAN PEDRO SULA 'L527 RAMAS SOBRE LA LINEA 1 3.15 298,525.47 0.00
Total 'L527 1 3.15 298,525.47 0.00
NO SAN PEDRO SULA 'L530 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 1,208.67 0.00
Total 'L530 1 0.07 1,208.67 0.00
NO SANTA MARTA 'L529 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 350.00 0.00
Total 'L529 1 0.08 350.00 0.00
NO VILLANUEVA 'L504 DESCONOCIDA MAYOR DE 3 MIN. 1 1.85 3,885.00 0.00
81
FALLAS PROPIAS DE
TRANSMISIÓN, ABRIL 2023
ABRIL 2023
AREA SUBESTACION LINEA CAUSA
APERT HRS KWH NE KWH NR
Total 'L504 1 1.85 3,885.00 0.00
NO[R] MORAZAN 'L414 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 346.50 0.00
Total 'L414 1 0.05 346.50 0.00
NO[R] PROGRESO 'L410 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 384.00 384.00
Total 'L410 1 0.07 384.00 384.00
NO[R] PROGRESO 'L412 FALLA EN LA LINEA 1 4.03 48,803.33 0.00
Total 'L412 1 4.03 48,803.33 0.00
NO[R] PROGRESO 'L529 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 0.00 0.00
Total 'L529 1 0.12 0.00 0.00
SU LOS PRADOS 'L361 DESCONOCIDA MAYOR DE 3 MIN. 1 4.35 103,356.01 0.00
Total 'L361 1 4.35 103,356.01 0.00
SU SANTA LUCIA 'L637 DESCONOCIDA MAYOR DE 3 MIN. 2 2.75 82,536.67 0.00
Total 'L637 2 2.75 82,536.67 0.00
Total general 51 93.95 1,528,572.82 850.67
82
ANEXOS 3- FALLAS EN DISTRIBUCIÓN
83
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA CENTRO
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
CE AMARATECA 'L335 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 663.83 663.83
CE AMARATECA 'L335 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 263.00 263.00
Total 'L335 3 0.17 926.83 926.83
CE CERRO DE HULA 'L345 AISLADORES DANADOS (ARQUEADOS) 1 1.60 8,080.00 8,080.00
CE CERRO DE HULA 'L345 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.12 571.50 571.50
Total 'L345 4 1.72 8,651.50 8,651.50
CE LA CAÑADA 'L272 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 218.33 218.33
Total 'L272 2 0.05 218.33 218.33
CE LA CAÑADA 'L273 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 260.67 260.67
Total 'L273 1 0.07 260.67 260.67
CE LA LEONA 'L231 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 76.83 76.83
Total 'L231 1 0.02 76.83 76.83
CE LA LEONA 'L232 DESCONOCIDA MAYOR DE 3 MIN. 2 0.30 1,875.00 1,875.00
Total 'L232 2 0.30 1,875.00 1,875.00
CE LA LEONA 'L233 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 182.17 182.17
Total 'L233 2 0.08 182.17 182.17
CE LA LEONA 'L234 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 146.50 146.50
Total 'L234 1 0.05 146.50 146.50
CE LAINEZ 'L262 DESCONOCIDA MAYOR DE 3 MIN. 1 0.03 313.00 313.00
CE LAINEZ 'L262 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.07 272.83 272.83
Total 'L262 3 0.10 585.83 585.83
CE LAINEZ 'L263 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 51.33 51.33
Total 'L263 1 0.03 51.33 51.33
CE LAINEZ 'L264 DESCONOCIDA MAYOR DE 3 MIN. 2 0.15 453.83 453.83
CE LAINEZ 'L264 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 571.00 571.00
Total 'L264 4 0.23 1,024.83 1,024.83
CE LAINEZ 'L266 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 71.00 71.00
Total 'L266 1 0.03 71.00 71.00
CE LAINEZ 'L267 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 74.17 74.17
Total 'L267 1 0.08 74.17 74.17
CE MIRAFLORES 'L235 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 277.50 277.50
Total 'L235 1 0.08 277.50 277.50
CE MIRAFLORES 'L236 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 227.00 227.00
Total 'L236 1 0.05 227.00 227.00
CE MIRAFLORES 'L237 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 248.00 248.00
Total 'L237 1 0.07 248.00 248.00
CE MIRAFLORES 'L238 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 82.17 82.17
Total 'L238 1 0.02 82.17 82.17
CE MIRAFLORES 'L239 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 340.67 340.67
CE MIRAFLORES 'L239 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 200.00 200.00
CE MIRAFLORES 'L239 FALLA EN RAMAL 1 0.10 395.00 395.00
Total 'L239 4 0.27 935.67 935.67
CE SANTA FE 'L227 PUENTE DANADO (ROTO) 1 1.85 12,043.50 12,043.50
CE SANTA FE 'L227 RAMAS SOBRE LA LINEA 1 6.95 66,233.50 66,233.50
Total 'L227 2 8.80 78,277.00 78,277.00
CE SANTA FE 'L228 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 272.67 272.67
Total 'L228 1 0.03 272.67 272.67
CE SANTA FE 'L291 DESCONOCIDA MAYOR DE 3 MIN. 4 0.65 3,970.17 3,970.17
CE SANTA FE 'L291 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 223.00 223.00
CE SANTA FE 'L291 LINEA SUELTA DE AISLADOR 1 2.05 9,430.00 9,430.00
Total 'L291 6 2.73 13,623.17 13,623.17
CE SANTA FE 'L306 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 105.50 105.50
CE SANTA FE 'L306 LINEA ROTA 1 5.58 22,445.00 22,445.00
Total 'L306 2 5.63 22,550.50 22,550.50
CE SANTA FE 'L307 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 126.33 126.33
Total 'L307 1 0.03 126.33 126.33
CE SUYAPA 'L251 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 638.00 638.00
CE SUYAPA 'L251 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 346.50 346.50
Total 'L251 2 0.12 984.50 984.50
CE SUYAPA 'L252 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 31.67 31.67
Total 'L252 1 0.03 31.67 31.67
CE SUYAPA 'L254 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 344.67 344.67
CE SUYAPA 'L254 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.10 536.00 536.00
84
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA CENTRO
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
Total 'L254 3 0.17 880.67 880.67
CE SUYAPA 'L255 CAJA CORTACIRCUITO CON FALLA 1 1.63 15,696.33 15,696.33
CE SUYAPA 'L255 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 220.00 220.00
Total 'L255 2 1.67 15,916.33 15,916.33
CE SUYAPA 'L256 DESCONOCIDA MAYOR DE 3 MIN. 1 0.13 1,710.67 1,710.67
Total 'L256 1 0.13 1,710.67 1,710.67
CE SUYAPA 'L257 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 200.00 200.00
Total 'L257 1 0.05 200.00 200.00
CE SUYAPA 'L258 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 97.83 97.83
Total 'L258 1 0.02 97.83 97.83
CE TONCONTIN 'L295 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 529.50 529.50
Total 'L295 2 0.08 529.50 529.50
CE TONCONTIN 'L296 DESCONOCIDA MAYOR DE 3 MIN. 1 1.23 13,061.00 13,061.00
CE TONCONTIN 'L296 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.07 533.67 533.67
CE TONCONTIN 'L296 RAMAS SOBRE LA LINEA 1 5.77 40,712.67 40,712.67
Total 'L296 5 7.07 54,307.34 54,307.34
CE TONCONTIN 'L297 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.15 1,407.33 1,407.33
Total 'L297 4 0.15 1,407.33 1,407.33
CE TONCONTIN 'L298 RAMAS SOBRE LA LINEA 1 2.13 14,016.00 14,016.00
Total 'L298 1 2.13 14,016.00 14,016.00
CE ZAMORANO 'L383 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 108.00 108.00
Total 'L383 1 0.03 108.00 108.00
CE ZAMORANO 'L384 DESCONOCIDA MAYOR DE 3 MIN. 1 1.32 3,331.17 3,331.17
CE ZAMORANO 'L384 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.13 259.50 259.50
Total 'L384 4 1.45 3,590.67 3,590.67
Total general 74 33.75 224,545.50 224,545.50
85
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
SISTEMAS REGIONALES, AREA CENTRO
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
CE[R] CATACAMAS 'L375 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.12 1,184.00 1,184.00
Total 'L375 3 0.12 1,184.00 1,184.00
CE[R] CATACAMAS 'L376 DESCONOCIDA MAYOR DE 3 MIN. 1 0.28 501.50 501.50
CE[R] CATACAMAS 'L376 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 78.67 78.67
CE[R] CATACAMAS 'L376 FALLA EN RAMAL 1 1.08 780.00 780.00
Total 'L376 3 1.40 1,360.17 1,360.17
CE[R] CHICHICASTE 'L362 DESCONOCIDA MAYOR DE 3 MIN. 6 8.12 13,213.50 13,213.50
CE[R] CHICHICASTE 'L362 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 167.67 167.67
CE[R] CHICHICASTE 'L362 FALLA EN RAMAL 1 4.25 7,735.00 7,735.00
Total 'L362 9 12.45 21,116.17 21,116.17
CE[R] COMAYAGUA 'L316 CUCHILLA CC ARQUEADA 1 0.47 3,556.00 3,556.00
CE[R] COMAYAGUA 'L316 DESCONOCIDA MAYOR DE 3 MIN. 2 0.22 1,565.67 1,565.67
CE[R] COMAYAGUA 'L316 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 436.17 436.17
CE[R] COMAYAGUA 'L316 PRUEBA DE CIERRE POR PERSONAL DE DISTRB. 1 1.37 9,102.00 9,102.00
Total 'L316 6 2.13 14,659.83 14,659.83
CE[R] COMAYAGUA 'L317 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 729.33 729.33
CE[R] COMAYAGUA 'L317 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 260.33 260.33
CE[R] COMAYAGUA 'L317 FALLA EN RAMAL 1 0.12 1,480.50 1,480.50
Total 'L317 4 0.27 2,470.17 2,470.17
CE[R] COMAYAGUA 'L325 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 841.33 841.33
CE[R] COMAYAGUA 'L325 FALLA EN RAMAL 1 7.42 71,867.50 71,867.50
Total 'L325 2 7.48 72,708.83 72,708.83
CE[R] COMAYAGUA 'L326 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.13 1,239.67 1,239.67
CE[R] COMAYAGUA 'L326 LLUVIAS EN EL AREA (NC) 1 3.90 25,740.00 25,740.00
Total 'L326 5 4.03 26,979.66 26,979.66
CE[R] COMAYAGUA 'L386 DESCONOCIDA MAYOR DE 3 MIN. 2 0.17 1,532.67 1,532.67
CE[R] COMAYAGUA 'L386 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 254.67 254.67
CE[R] COMAYAGUA 'L386 LLUVIAS EN EL AREA (NC) 1 2.00 13,160.00 13,160.00
Total 'L386 4 2.20 14,947.33 14,947.33
CE[R] DANLI 'L389 DESCONOCIDA MAYOR DE 3 MIN. 2 0.18 1,319.67 1,319.67
CE[R] DANLI 'L389 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 80.00 80.00
Total 'L389 3 0.20 1,399.67 1,399.67
CE[R] EL PORVENIR 'L342 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 529.67 529.67
CE[R] EL PORVENIR 'L342 FALLA EN RAMAL 1 1.88 15,537.50 15,537.50
CE[R] EL PORVENIR 'L342 LLUVIAS EN EL AREA (NC) 2 3.58 8,463.83 8,463.83
Total 'L342 4 5.58 24,531.00 24,531.00
CE[R] GUAIMACA 'L377 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 209.50 209.50
CE[R] GUAIMACA 'L377 LLUVIAS EN EL AREA (NC) 1 0.18 852.50 852.50
CE[R] GUAIMACA 'L377 PRUEBA DE CIERRE POR PERSONAL DE DISTRB. 1 0.05 54.50 54.50
Total 'L377 4 0.28 1,116.50 1,116.50
CE[R] GUAIMACA 'L378 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 270.33 270.33
CE[R] GUAIMACA 'L378 FALLA EN RAMAL 1 0.22 2,840.50 2,840.50
CE[R] GUAIMACA 'L378 LINEA ROTA 1 7.07 53,494.67 53,494.67
CE[R] GUAIMACA 'L378 PUENTE DANADO (ROTO) 1 1.18 9,253.67 9,253.67
Total 'L378 4 8.50 65,859.17 65,859.17
CE[R] JUTICALPA 'L380 DESCONOCIDA MAYOR DE 3 MIN. 17 5.35 39,692.17 39,692.17
CE[R] JUTICALPA 'L380 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.13 1,780.33 1,780.33
CE[R] JUTICALPA 'L380 FALLA EN RAMAL 3 10.13 71,446.33 71,446.33
CE[R] JUTICALPA 'L380 INCENDIO EN AREA DE LINEA (NC) 1 0.13 3,621.33 3,621.33
CE[R] JUTICALPA 'L380 LINEA ROTA 1 2.37 11,809.67 11,809.67
CE[R] JUTICALPA 'L380 PRUEBA DE CIERRE POR PERSONAL DE DISTRB. 2 0.30 111.50 111.50
CE[R] JUTICALPA 'L380 RAMAS SOBRE LA LINEA 1 7.28 61,376.65 61,376.65
Total 'L380 29 25.70 189,837.98 189,837.98
CE[R] JUTICALPA 'L381 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.10 276.50 276.50
Total 'L381 3 0.10 276.50 276.50
CE[R] JUTICALPA 'L382 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.22 331.50 331.50
Total 'L382 1 0.22 331.50 331.50
CE[R] SIGUATEPEQUE 'L373 DESCONOCIDA MAYOR DE 3 MIN. 1 0.18 1,411.67 1,411.67
CE[R] SIGUATEPEQUE 'L373 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 93.33 93.33
CE[R] SIGUATEPEQUE 'L373 LLUVIAS EN EL AREA (NC) 1 1.08 5,232.50 5,232.50
Total 'L373 3 1.30 6,737.50 6,737.50
CE[R] SIGUATEPEQUE 'L374 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 113.83 113.83
Total 'L374 1 0.02 113.83 113.83
Total general 88 71.98 445,629.81 445,629.81
86
FALLAS PROPIAS DE DISTRIBUCIÓN , ABRIL 2023
SISTEMAS REGIONALES, AREA SUR
ABRIL 2023
AREA SUBESTACIONLINEA CAUSA APERT HRS KWH NE KWH NR
SU LOS PRADOS 'L360 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 103.17 103.17
SU LOS PRADOS 'L360 LINEA SUELTA DE ESTRUCTURA 1 0.80 5,432.00 5,432.00
SU LOS PRADOS 'L360 LLUVIAS EN EL AREA (NC) 2 0.62 3,924.33 3,924.33
Total 'L360 4 1.43 9,459.50 9,459.50
SU PAVANA 'L365 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 439.67 439.67
SU PAVANA 'L365 PRUEBA DE CIERRE POR PERSONAL DE DISTRB 1 0.05 98.50 98.50
Total 'L365 2 0.08 538.17 538.17
SU PAVANA 'L366 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 865.33 865.33
SU PAVANA 'L366 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 146.00 146.00
SU PAVANA 'L366 FALLA EN RAMAL 1 8.17 94,406.68 94,406.68
SU PAVANA 'L366 LLUVIAS EN EL AREA (NC) 1 1.43 16,196.67 16,196.67
Total 'L366 4 9.68 111,614.68 111,614.68
SU PAVANA 'L367 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 651.50 651.50
SU PAVANA 'L367 PRUEBA DE CIERRE POR PERSONAL DE DISTRB 1 0.13 1,718.67 1,718.67
Total 'L367 2 0.18 2,370.17 2,370.17
SU PAVANA 'L368 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 245.00 245.00
Total 'L368 1 0.02 245.00 245.00
SU PAVANA 'L369 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 215.33 215.33
SU PAVANA 'L369 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.08 284.33 284.33
SU PAVANA 'L369 FALLA EN RAMAL 1 1.25 3,637.50 3,637.50
Total 'L369 5 1.40 4,137.17 4,137.17
SU SANTA LUCIA 'L318 DESCONOCIDA MAYOR DE 3 MIN. 2 0.15 2,050.50 2,050.50
SU SANTA LUCIA 'L318 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.10 1,394.33 1,394.33
Total 'L318 6 0.25 3,444.83 3,444.83
SU SANTA LUCIA 'L320 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 1,304.67 1,304.67
SU SANTA LUCIA 'L320 DESCONOCIDA MENOR DE 3 MINUTOS 6 0.27 4,833.50 4,833.50
SU SANTA LUCIA 'L320 FALLA EN RAMAL 4 1.78 28,959.83 28,959.83
Total 'L320 11 2.12 35,098.00 35,098.00
SU SANTA LUCIA 'L358 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 89.00 89.00
Total 'L358 1 0.03 89.00 89.00
SU SANTA LUCIA 'L359 CUCHILLAS MONOPOLARES CON FALLA 1 0.62 6,641.50 6,641.50
SU SANTA LUCIA 'L359 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.03 277.50 277.50
Total 'L359 3 0.65 6,919.00 6,919.00
SU TERM LA GRECIA 'L357 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 721.50 721.50
Total 'L357 1 0.05 721.50 721.50
Total general 40 15.90 174,637.02 174,637.02
87
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA SAN PEDRO SULA
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
NO BELLAVISTA 'L211 DESCONOCIDA MAYOR DE 3 MIN. 1 0.55 2,475.00 2,475.00
Total 'L211 1 0.55 2,475.00 2,475.00
NO BELLAVISTA 'L212 DESCONOCIDA MAYOR DE 3 MIN. 1 0.55 2,475.00 2,475.00
Total 'L212 1 0.55 2,475.00 2,475.00
NO BELLAVISTA 'L213 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 1,393.33 1,393.33
NO BELLAVISTA 'L213 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 486.00 486.00
Total 'L213 2 0.10 1,879.33 1,879.33
NO BERMEJO 'L205 DESCONOCIDA MAYOR DE 3 MIN. 4 0.47 5,720.00 5,720.00
NO BERMEJO 'L205 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 1,071.67 1,071.67
Total 'L205 6 0.55 6,791.67 6,791.67
NO CHOLOMA 'L215 DESCONOCIDA MAYOR DE 3 MIN. 2 0.23 3,210.00 3,210.00
NO CHOLOMA 'L215 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.12 1,178.33 1,178.33
Total 'L215 4 0.35 4,388.33 4,388.33
NO CHOLOMA 'L252 DESCONOCIDA MAYOR DE 3 MIN. 5 0.50 5,085.67 5,085.67
NO CHOLOMA 'L252 DESCONOCIDA MENOR DE 3 MINUTOS 7 0.20 1,943.83 1,943.83
Total 'L252 12 0.70 7,029.50 7,029.50
NO CIRCUNVALACIÓN 'L241 DESCONOCIDA MAYOR DE 3 MIN. 2 0.52 8,144.50 8,144.50
NO CIRCUNVALACIÓN 'L241 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 357.33 357.33
NO CIRCUNVALACIÓN 'L241 FALLA EN RAMAL 1 0.10 1,450.00 1,450.00
NO CIRCUNVALACIÓN 'L241 LINEA ROTA 1 3.78 27,731.83 27,731.83
Total 'L241 5 4.43 37,683.67 37,683.67
NO CIRCUNVALACIÓN 'L242 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 269.00 269.00
Total 'L242 1 0.03 269.00 269.00
NO CIRCUNVALACIÓN 'L243 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 66.67 66.67
NO CIRCUNVALACIÓN 'L243 FALLA EN RAMAL 1 0.07 234.67 234.67
Total 'L243 2 0.08 301.33 301.33
NO CIRCUNVALACIÓN 'L246 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 728.67 728.67
Total 'L246 1 0.07 728.67 728.67
NO LA PUERTA 'L203 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 386.67 386.67
Total 'L203 1 0.07 386.67 386.67
NO LA PUERTA 'L204 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 480.00 480.00
Total 'L204 1 0.07 480.00 480.00
NO LA PUERTA 'L233 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 240.67 240.67
Total 'L233 1 0.07 240.67 240.67
NO LA PUERTA 'L250 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 313.67 313.67
Total 'L250 1 0.03 313.67 313.67
NO LA VICTORIA 'L227 DESCONOCIDA MAYOR DE 3 MIN. 1 0.27 1,626.67 1,626.67
Total 'L227 1 0.27 1,626.67 1,626.67
NO LA VICTORIA 'L228 DESCONOCIDA MAYOR DE 3 MIN. 1 0.27 1,626.67 1,626.67
Total 'L228 1 0.27 1,626.67 1,626.67
NO LA VICTORIA 'L235 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.07 842.67 842.67
NO LA VICTORIA 'L235 FALLA EN RAMAL 1 1.60 8,464.00 8,464.00
NO LA VICTORIA 'L235 PRUEBA DE CIERRE POR PERSONAL DE DISTRB 1 0.02 75.33 75.33
Total 'L235 5 1.68 9,382.00 9,382.00
NO LA VICTORIA 'L236 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 425.00 425.00
NO LA VICTORIA 'L236 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 188.67 188.67
Total 'L236 2 0.13 613.67 613.67
NO NACO 'L364 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.12 1,537.67 1,537.67
NO NACO 'L364 LLUVIAS EN EL AREA (NC) 1 11.47 95,173.34 95,173.34
Total 'L364 5 11.58 96,711.01 96,711.01
NO NACO 'L365 DESCONOCIDA MAYOR DE 3 MIN. 1 0.85 9,180.00 9,180.00
NO NACO 'L365 DESCONOCIDA MENOR DE 3 MINUTOS 4 0.15 2,201.67 2,201.67
NO NACO 'L365 LLUVIAS EN EL AREA (NC) 1 11.28 220,025.00 220,025.00
Total 'L365 6 12.28 231,406.67 231,406.67
NO RETORNO 'L286 AISLADORES DANADOS (ARQUEADOS) 1 4.02 0.00 0.00
88
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA SAN PEDRO SULA
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
Total 'L286 1 4.02 0.00 0.00
NO RETORNO 'L287 DESCONOCIDA MAYOR DE 3 MIN. 3 2.00 23,737.50 23,737.50
Total 'L287 3 2.00 23,737.50 23,737.50
NO RETORNO 'L295 DESCONOCIDA MAYOR DE 3 MIN. 2 1.97 23,660.83 23,660.83
Total 'L295 2 1.97 23,660.83 23,660.83
NO RIO NANCE 'L384 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 2.33 2.33
Total 'L384 1 0.03 2.33 2.33
NO RIO NANCE 'L385 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 962.50 962.50
NO RIO NANCE 'L385 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 547.50 547.50
Total 'L385 3 0.13 1,510.00 1,510.00
NO RIO NANCE 'L386 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 283.00 283.00
NO RIO NANCE 'L386 LLUVIAS EN EL AREA (NC) 1 15.60 27,924.00 27,924.00
Total 'L386 2 15.70 28,207.00 28,207.00
NO SANTA MARTA 'L291 DESCONOCIDA MAYOR DE 3 MIN. 1 0.20 0.00 0.00
NO SANTA MARTA 'L291 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 234.00 234.00
NO SANTA MARTA 'L291 RAMAS SOBRE LA LINEA 1 0.00 0.00 0.00
Total 'L291 3 0.25 234.00 234.00
NO VILLANUEVA 'L323 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.07 528.33 528.33
Total 'L323 3 0.07 528.33 528.33
NO VILLANUEVA 'L324 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 350.00 350.00
Total 'L324 1 0.03 350.00 350.00
NO VILLANUEVA 'L391 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 620.00 620.00
NO VILLANUEVA 'L391 RAMAS SOBRE LA LINEA 1 1.80 25,920.00 25,920.00
Total 'L391 3 1.88 26,540.00 26,540.00
NO VILLANUEVA 'L392 DESCONOCIDA MAYOR DE 3 MIN. 1 0.52 1,240.00 1,240.00
NO VILLANUEVA 'L392 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.08 525.00 525.00
NO VILLANUEVA 'L392 PRUEBA DE CIERRE POR PERSONAL DE DISTRB 1 0.15 1,245.00 1,245.00
Total 'L392 5 0.75 3,010.00 3,010.00
NO VILLANUEVA 'L393 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 103.33 103.33
Total 'L393 1 0.02 103.33 103.33
NO VILLANUEVA 'L394 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 53.33 53.33
Total 'L394 1 0.03 53.33 53.33
Total general 88 60.75 514,745.84 514,745.84
89
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA NORTE REGIONAL
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
CA CAÑAVERAL 'L301 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.05 256.67 256.67
Total 'L301 2 0.05 256.67 256.67
CA CAÑAVERAL 'L303 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.08 382.67 382.67
CA CAÑAVERAL 'L303 DESCONOCIDA Y CON REVISION 1 0.38 2,510.83 2,510.83
Total 'L303 4 0.47 2,893.50 2,893.50
CA CAÑAVERAL 'L304 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 123.17 123.17
CA CAÑAVERAL 'L304 FALLA EN RAMAL 1 0.13 985.33 985.33
CA CAÑAVERAL 'L304 PRUEBA DE CIERRE POR PERSONAL DE DISTRB. 1 0.65 2,762.50 2,762.50
Total 'L304 3 0.80 3,871.00 3,871.00
CA EL NISPERO 'L332 DESCONOCIDA MAYOR DE 3 MIN. 3 0.52 1,879.50 1,879.50
CA EL NISPERO 'L332 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 353.00 353.00
CA EL NISPERO 'L332 FALLA EN RAMAL 1 0.23 2,942.33 2,942.33
CA EL NISPERO 'L332 PARARRAYOS DANADO (ARQUEADOS) 1 0.13 630.67 630.67
CA EL NISPERO 'L332 PRUEBA DE CIERRE POR PERSONAL DE DISTRB. 1 0.05 397.00 397.00
Total 'L332 7 0.97 6,202.50 6,202.50
CA ERANDIQUE 'L371 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 35.00 35.00
Total 'L371 1 0.03 35.00 35.00
CA LA ENTRADA 'L357 LLUVIAS EN EL AREA (NC) 1 1.08 8,504.17 8,504.17
Total 'L357 1 1.08 8,504.17 8,504.17
CA LA ENTRADA 'L362 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.08 806.00 806.00
CA LA ENTRADA 'L362 FALLA EN CRUCETE 1 17.50 101,500.00 101,500.00
Total 'L362 3 17.58 102,306.00 102,306.00
CA LAS FLORES 'L334 DESCONOCIDA MAYOR DE 3 MIN. 1 0.12 850.50 850.50
Total 'L334 1 0.12 850.50 850.50
CA MOCHITO 'L332 PROB. REGULADOR DE VOLTAJE 1 3.00 0.00 0.00
Total 'L332 1 3.00 0.00 0.00
NO[R] GUAIMAS 'L356 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 131.33 131.33
Total 'L356 1 0.02 131.33 131.33
NO[R] MASCA 'L352 DESCONOCIDA MAYOR DE 3 MIN. 1 3.65 8,176.00 8,176.00
NO[R] MASCA 'L352 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.07 220.67 220.67
Total 'L352 3 3.72 8,396.67 8,396.67
NO[R] MASCA 'L353 DESCONOCIDA MAYOR DE 3 MIN. 3 1.33 9,748.50 9,748.50
NO[R] MASCA 'L353 DESCONOCIDA MENOR DE 3 MINUTOS 9 0.35 4,369.17 4,369.17
NO[R] MASCA 'L353 FALLA EN RAMAL 1 1.67 5,383.33 5,383.33
Total 'L353 13 3.35 19,501.00 19,501.00
NO[R] MASCA 'L354 DESCONOCIDA MAYOR DE 3 MIN. 1 0.10 1,140.00 1,140.00
Total 'L354 1 0.10 1,140.00 1,140.00
NO[R] MORAZAN 'L396 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 315.33 315.33
NO[R] MORAZAN 'L396 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 299.00 299.00
Total 'L396 2 0.12 614.33 614.33
NO[R] PROGRESO 'L319 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 602.50 602.50
Total 'L319 1 0.05 602.50 602.50
NO[R] TERMICA SULZER 'L223 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.07 179.00 179.00
Total 'L223 2 0.07 179.00 179.00
NO[R] TERMICA SULZER 'L224 DESCONOCIDA MAYOR DE 3 MIN. 1 0.08 590.83 590.83
NO[R] TERMICA SULZER 'L224 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 188.33 188.33
Total 'L224 2 0.12 779.17 779.17
NO[R] TERMICA SULZER 'L225 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 24.17 24.17
Total 'L225 1 0.02 24.17 24.17
Total general 49 31.65 156,287.50 156,287.50
90
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA YORO
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
NO[R] YORO 'L397 PRUEBA DE CIERRE POR PERSONAL DE DISTRB 1 0.08 21.67 21.67
Total 'L397 1 0.08 21.67 21.67
NO[R] YORO 'L398 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 90.00 90.00
NO[R] YORO 'L398 FALLA EN RAMAL 1 0.88 441.67 441.67
Total 'L398 2 0.95 531.67 531.67
NO[R] YORO 'L399 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 136.67 136.67
NO[R] YORO 'L399 FALLA EN RAMAL 5 6.52 24,076.17 24,076.17
NO[R] YORO 'L399 POSTES O ESTRUCTURAS DANADAS (NC) 1 1.47 6,570.67 6,570.67
Total 'L399 7 8.02 30,783.50 30,783.50
Total general 10 9.05 31,336.83 31,336.83
91
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA OCCIDENTE
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
CA SANTA ROSA 'L338 DESCONOCIDA MAYOR DE 3 MIN. 1 0.78 5,052.50 5,052.50
Total 'L338 1 0.78 5,052.50 5,052.50
CA SANTA ROSA 'L339 DESCONOCIDA MAYOR DE 3 MIN. 2 8.98 18,275.00 18,275.00
Total 'L339 2 8.98 18,275.00 18,275.00
Total general 3 9.77 23,327.50 23,327.50
92
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
AREA LITORAL ATLANTICO (CEIBA)
ABRIL 2023
AREA SUBESTACION LINEA CAUSA APERT HRS KWH NE KWH NR
LA CEIBA TERMICA 'L308 INCENDIO EN AREA DE LINEA (NC) 1 0.42 1,145.83 1,145.83
Total 'L308 1 0.42 1,145.83 1,145.83
LA CEIBA TERMICA 'L311 DESCONOCIDA MAYOR DE 3 MIN. 1 0.62 1,232.10 1,232.10
LA CEIBA TERMICA 'L311 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.05 209.50 209.50
Total 'L311 2 0.67 1,441.60 1,441.60
LA CEIBA TERMICA 'L312 DESCONOCIDA MENOR DE 3 MINUTOS 2 0.07 322.00 322.00
LA CEIBA TERMICA 'L312 FALLA EN RAMAL 1 0.22 2,513.33 2,513.33
LA CEIBA TERMICA 'L312 LINEA SUELTA DE ESTRUCTURA 1 1.93 2,049.33 2,049.33
Total 'L312 4 2.22 4,884.67 4,884.67
LA SAN ISIDRO 'L327 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 230.67 230.67
Total 'L327 1 0.03 230.67 230.67
LA SAN ISIDRO 'L329 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.02 130.50 130.50
Total 'L329 1 0.02 130.50 130.50
LA SAN ISIDRO 'L330 DESCONOCIDA MAYOR DE 3 MIN. 1 5.42 39,270.84 39,270.84
LA SAN ISIDRO 'L330 LINEA ROTA 1 4.40 23,936.00 23,936.00
Total 'L330 2 9.82 63,206.84 63,206.84
Total general 11 13.17 71,040.10 71,040.10
93
FALLAS PROPIAS DE DISTRIBUCIÓN, ABRIL 2023
ÁREA LITORAL ATLÁNTICO REGIONAL (CEIBA)
ABRIL 2023
AREA SUBESTACION LINEA CAUSA
APERT HRS KWH NE KWH NR
LA[R] BONITO ORIENTAL 'L349 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.07 191.50 191.50
Total 'L349 3 0.07 191.50 191.50
LA[R] BONITO ORIENTAL 'L350 DESCONOCIDA MAYOR DE 3 MIN. 4 0.90 4,412.00 4,412.00
Total 'L350 4 0.90 4,412.00 4,412.00
LA[R] BONITO ORIENTAL 'L351 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 188.33 188.33
Total 'L351 1 0.03 188.33 188.33
LA[R] COYOLES CENTRAL 'L340 DESCONOCIDA MAYOR DE 3 MIN. 1 0.40 324.00 324.00
Total 'L340 1 0.40 324.00 324.00
LA[R] COYOLES CENTRAL 'L341 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 52.67 52.67
Total 'L341 1 0.03 52.67 52.67
LA[R] ISLETAS 'L344 DESCONOCIDA MAYOR DE 3 MIN. 1 1.63 9,310.00 9,310.00
Total 'L344 1 1.63 9,310.00 9,310.00
LA[R] ISLETAS 'L345 DESCONOCIDA MAYOR DE 3 MIN. 2 1.68 11,850.33 11,850.33
LA[R] ISLETAS 'L345 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 158.33 158.33
LA[R] ISLETAS 'L345 RAMAS SOBRE LA LINEA 1 1.93 11,000.67 11,000.67
Total 'L345 4 3.65 23,009.33 23,009.33
LA[R] ISLETAS 'L347 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 325.33 325.33
Total 'L347 1 0.03 325.33 325.33
LA[R] TELA 'L309 DESCONOCIDA MAYOR DE 3 MIN. 5 0.57 4,416.83 4,416.83
LA[R] TELA 'L309 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.10 474.33 474.33
LA[R] TELA 'L309 LLUVIAS EN EL AREA (NC) 1 4.07 14,558.67 14,558.67
LA[R] TELA 'L309 RAMAS SOBRE LA LINEA 1 2.82 32,983.16 32,983.16
Total 'L309 10 7.55 52,433.00 52,433.00
LA[R] TELA 'L310 DESCONOCIDA MAYOR DE 3 MIN. 1 0.07 656.00 656.00
LA[R] TELA 'L310 DESCONOCIDA MENOR DE 3 MINUTOS 3 0.07 606.83 606.83
Total 'L310 4 0.13 1,262.83 1,262.83
Total general 30 14.43 91,509.00 91,509.00
94
ANEXOS 4- FALLAS EN SUBESTACIONES
95
FALLAS PROPIAS EN SUBESTACIONES
ABRIL 2023
ABRIL 2023
AREA SUBESTACION EQUIPO CAUSA
APERT HRS KWH NE KWH NR
CA EL CAJON '62E04 DISPARIDAD DE POLOS 1 8.38 0.00 0.00
Total '62E04 1 8.38 0.00 0.00
CA EL NISPERO 'T410 SOBRECARGA 3 0.68 8,837.00 0.00
Total 'T410 3 0.68 8,837.00 0.00
CE SANTA FE '42L06 FUGA DE ACEITE DIELECTRICO 1 33.72 0.00 0.00
Total '42L06 1 33.72 0.00 0.00
CE ZAMORANO 'T430 FALLA EN INTERRUPTOR DE BAJA 1 0.02 139.83 0.00
CE ZAMORANO 'T430 FALLAS EN AUXILIARES 1 3.97 28,242.67 0.00
Total 'T430 2 3.98 28,382.50 0.00
CE[R] JUTICALPA 'T438 DESCONOCIDA MAYOR DE 3 MIN. 1 0.17 4,151.67 0.00
CE[R] JUTICALPA 'T438 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.03 570.00 0.00
CE[R] JUTICALPA 'T438 DESCONOCIDA Y CON REVISION 1 0.77 10,963.33 0.00
Total 'T438 3 0.97 15,685.00 0.00
NO CIRCUNVALACIÓN '52B30 DESCONOCIDA MAYOR DE 3 MIN. 1 1.88 0.00 0.00
Total '52B30 1 1.88 0.00 0.00
NO LA PUERTA 'T502 CAUSADO POR ANIMALES (NC) 1 4.28 42,704.84 0.00
Total 'T502 1 4.28 42,704.84 0.00
NO LA PUERTA 'T525 CAUSADO POR ANIMALES (NC) 2 6.15 48,707.16 0.00
Total 'T525 2 6.15 48,707.16 0.00
NO RETORNO 'T586 DESCONOCIDA MAYOR DE 3 MIN. 2 4.10 37,250.00 0.00
Total 'T586 2 4.10 37,250.00 0.00
NO RETORNO 'T587 DESCONOCIDA MAYOR DE 3 MIN. 2 4.07 36,911.67 0.00
Total 'T587 2 4.07 36,911.67 0.00
NO RIO NANCE 'T554 LLUVIAS EN EL AREA (NC) 1 15.53 0.00 0.00
Total 'T554 1 15.53 0.00 0.00
NO RIO NANCE 'T577 DESCONOCIDA MAYOR DE 3 MIN. 2 0.62 7,235.83 0.00
Total 'T577 2 0.62 7,235.83 0.00
NO RIO NANCE 'T578 DESCONOCIDA MAYOR DE 3 MIN. 2 0.62 7,123.33 0.00
Total 'T578 2 0.62 7,123.33 0.00
NO[R] PROGRESO 'T601 ERROR PERSONAL DE SUBESTACIONES 1 0.30 52,494.00 0.00
Total 'T601 1 0.30 52,494.00 0.00
NO[R] PROGRESO 'T604 ERROR PERSONAL DE SUBESTACIONES 1 4.32 399,291.66 0.00
Total 'T604 1 4.32 399,291.66 0.00
SU LOS PRADOS 'T632 DESCONOCIDA MENOR DE 3 MINUTOS 1 0.08 261.67 0.00
Total 'T632 1 0.08 261.67 0.00
SU SANTA LUCIA 'T634 SOBRECARGA 1 0.07 3,464.00 0.00
Total 'T634 1 0.07 3,464.00 0.00
Total general 27 89.75 688,348.66 0.00
96
ANEXOS MANTENIMIENTOS
97
ANEXOS 5- MANTENIMIENTOS EN GENERACIÓN
98
SALIDAS DE OPERACIÓN POR MANTENIMIENTO GENERACION DEL SIN DE ABRIL 2023
CA CAÑAVERAL 'U002 SALIDA DE UNIDAD(ES) 22/4/2023 06:15 EJECUTAR ORDEN DE OPERACION 73.67 0.00 23-0917;INSPECCI?N Y REPARACI?N DE FUGA DE AGUA POR VALVULA BYPASS.
CA EL CAJON 'U001 UNIDAD INDISPONIBLE 12/4/2023 22:19 EJECUTAR ORDEN DE OPERACION 2.33 0.00 INICIA LA ORDEN N? 23-0792;V208 UPN10200 ANILLOS ROZANTES INTERMEDIA.
23-0852. UNIDAD QUEDA INDISPONIBLE POR MANTENIMIENTO SEG?N ORDEN MEDICI?N
CA EL CAJON 'U001 UNIDAD INDISPONIBLE 19/4/2023 07:10 EJECUTAR ORDEN DE OPERACION 1.95 0.00 ANILLO DE REGULACI?N.
23-0836. MEDICI?N DE CAUDALES DE FONDO INFERIOR Y SELLOS DE TURBINA. UNIDAD
CA EL CAJON 'U002 UNIDAD INDISPONIBLE 18/4/2023 07:29 EJECUTAR ORDEN DE OPERACION 1.55 0.00 QUEDA INDISPONIBLE APARTIR DE ESTE MOMENTO.
23-0853. UNIDAD QUEDA INDISPONIBLE POR DESPEJE PROGRAMADO SEG?N ORDEN DE
CA EL CAJON 'U002 UNIDAD INDISPONIBLE 20/4/2023 07:09 EJECUTAR ORDEN DE OPERACION 1.60 0.00 OPERACI?N; MEDICI?N ANILLO DE REGULACI?N.
23-0907. ANILLOS ROZANTES INTERMEDIA. UNIDAD QUEDA INDISPONIBLE POR
CA EL CAJON 'U002 UNIDAD INDISPONIBLE 26/4/2023 00:50 EJECUTAR ORDEN DE OPERACION 7.05 0.00 MANTENIMIENTO PROGRAMADO SEG?N ORDEN DE OPERACI?N.
SE AUTORIZA REALIZAR TRABAJO DE EMERGENCIA PARA REALIZAR CAMBIO DE
CA EL CAJON 'U003 UNIDAD INDISPONIBLE 12/4/2023 07:00 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 1.08 0.00 ENFRIADOR NO. 5 DE ENFRIAMIENTO DE AIRE; TRABAJO ESTIMADO 1 HR.
23-0722;V226 UPN30100 TURBINA; V208 UPN30200 ANILLOS ROZANTES COMPLETA; V252
CA EL CAJON 'U003 UNIDAD INDISPONIBLE 15/4/2023 07:03 EJECUTAR ORDEN DE OPERACION 7.48 0.00 UPN 30403 EQUIPO DE BOMBEO ACEITE GOBERNADOR TURBINA.
23-0723. NO DISPONIBLE PARA REALIZAR VISITA II A TURBINA; ANILLOS ROZANTES.
CA EL CAJON 'U003 UNIDAD INDISPONIBLE 16/4/2023 07:05 EJECUTAR ORDEN DE OPERACION 6.67 0.00
INDISPONIBLE EN CALIDAD DE EMERGENCIA PARA REVISI?N DE CAUDALIMETRO DEL
GENERADOR. DISPONIBLE AL FINALIZAR TRABAJOS DE EMERGENCIA
CA EL CAJON 'U003 UNIDAD INDISPONIBLE 26/4/2023 07:21 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 0.28 0.00
230930. CAMBIO DE COMPENSADOR A10 POR HABER PRESENTADO FUGA DE GASES EN
MULTIPLE DE ESCPAPE. UNIDAD QUEDA INDISPONIBLE POR DESPEJE PROGRAMADO
CA EL CAJON 'U003 UNIDAD INDISPONIBLE 27/4/2023 00:28 EJECUTAR ORDEN DE OPERACION 9.20 0.00 SEG?N ORDEN DE OPERACI?N;
23-0854. UNIDAD QUEDA INDIPONIBLE POR TRABAJOS PROGRAMADOS SEG?N ORDEN
CA EL CAJON 'U004 UNIDAD INDISPONIBLE 21/4/2023 07:00 EJECUTAR ORDEN DE OPERACION 1.40 0.00 DE OPERACI?N DE MEDICI?N DE ANILLOS ROZANTES.
23-0908. VISITA II EQUIPO OLEONEUM?TICO DE VE; EQUIPO DE BOMBEO; UNIDAD
QUEDA INDISPONIBLE POR MANTENIMIENTO PROGRAMADO SEG?N ORDE DE
CA EL CAJON 'U004 UNIDAD INDISPONIBLE 29/4/2023 07:00 EJECUTAR ORDEN DE OPERACION 6.63 0.00 OPERACI?N.
23-0910;V208 UPN40100 TURBINA;GENERARADOR;ANILLOS ROSANTES;PROTECCI?N POR
TEMPERATURA;GOBERNADOR HIDRAULICO;SISTEMAS AUXILIARES.
CA EL CAJON 'U004 UNIDAD INDISPONIBLE 30/4/2023 07:00 EJECUTAR ORDEN DE OPERACION 6.63 0.00
23-0855. UNIDAD SALE DE L?NEA PARA EJECUTAR TRABAJOS DE MANTENIMIENTO
PREVENTIVO ANUAL Y CORRECTIVO EN LOS EQUIPOS DE LAS SUBESTACIONES DE
SANTA ROSA Y DE GEOPLATANARES SEG?N ORDEN DISPONIBILIDAD BAJA A 32 A 18
CA GEOPLATANARES 'U001 SALIDA DE UNIDAD(ES) 19/4/2023 07:26 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 36.10 14.00 MW.
23-0847 ; NO DISPONIBLE PARA REALIZAR MANTENIMIENTO PREVENTIVO ANUAL.
CA GEOPLATANARES 'U002 SALIDA DE UNIDAD(ES) 16/4/2023 00:45 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 72.12 20.21
23-0765 SE INICIA ORDEN DE OPERACI?N PARA INSPECCI?N DETALLADA DE TURBINA;
DEFLECTORES; VALVULA DE GUARDIA; GOBERNADORY SISTEMA DE 13.8 KV.
CA RIO LINDO 'U001 DESPEJE DE UNIDAD HIDRO 16/4/2023 06:07 EJECUTAR ORDEN DE OPERACION 5.60 0.00 TRABAJOS A CARGO DE CARLOS SALGADO.
23-0765 PARA INSPECCI?N DETALLADA DE TURBINA; DEFLECTORES; VALVULA DE
GUARDIA; GOBERNADORY SISTEMA DE 13.8 KV. TRABAJOS A CARGO DE CARLOS
CA RIO LINDO 'U002 DESPEJE DE UNIDAD HIDRO 16/4/2023 13:09 EJECUTAR ORDEN DE OPERACION 3.65 0.00 SALGADO.
23-0760. UNIDAD SALE DE L?NEA PARA LLEVAR A CABO INSPECCI?N DETALLADA DE
TURBINA; DEFLECTORES; VALVULAS DE GUARDIA; GOBERNADOR Y GENERADOR DE
CA RIO LINDO 'U003 DESPEJE DE UNIDAD HIDRO 15/4/2023 05:44 EJECUTAR ORDEN DE OPERACION 6.47 20.00 13.8 KV SEG?N ORDEN
23-0760; SALE DE LINEA PARA DARLE CONTINUACI?N A LA ORDEN INSPECCI?N
DETALLADA DE TURBINA;DEFLECTORES;VALVULA DE
CA RIO LINDO 'U004 DESPEJE DE UNIDAD HIDRO 15/4/2023 13:03 EJECUTAR ORDEN DE OPERACION 5.28 20.00 GUARDIA;GOBERNADOR;GENERADOR Y SISTEMA DE 13.8 KV.
PLANTA SALE DE L?NEA PARA MANTENIMIENTO INTERNO DE LA PLANTA; MANIOBRA
CE LA ESPERANZA 'U001 SALIDA DE UNIDAD(ES) 3/4/2023 05:02 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 12.07 0.60 SIN ORDEN DE OPERACI?N.
CE LA ESPERANZA 'U001 SALIDA DE UNIDAD(ES) 10/4/2023 07:08 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 8.87 0.50 SALE PARA REALIZAR MANTENIMIENTO INTERNO DE PLANTA 7:00 A 16:00
CE LA ESPERANZA 'U001 SALIDA DE UNIDAD(ES) 11/4/2023 06:21 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 9.65 0.50 SALE PARA REALIZAR MANTENIMIENTO INTERNO DE PLANTA 7:00 A 16:00
CE LA ESPERANZA 'U001 SALIDA DE UNIDAD(ES) 27/4/2023 07:03 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 9.93 0.50 SALE DE L?NEA POR MANTTO. INTERNO EN LA PLANTA
INFORMA PERSONAL DE LA PLANTA SALEN DE L?NEA PARA MANTENIMIENTO
CE LA ESPERANZA 'U001 SALIDA DE UNIDAD(ES) 28/4/2023 07:10 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 15.33 1.50 INTERNO.
23-0918; INICIA ORDEN DE OPERACI?N PARA CAMBIO DE CAJAS CORTACIRCUITO Y
CE LAEISZ JUTICALPA 'U001 DESPEJE DE UNIDAD TERMICA 23/4/2023 08:20 EJECUTAR ORDEN DE OPERACION 3.67 0.00 HABILITACI?N DE TRANSFORMADOR DE POTENCIA.
230744. UNIDAD QUEDA INDISPONIBLE POR MANTENIMIENTO PROGRAMADO SEG?N
CE PATUCA III 'U001 UNIDAD INDISPONIBLE 13/4/2023 07:31 EJECUTAR ORDEN DE OPERACION 9.88 0.00 ORDEN DE OPERACI?N.
23-0753. UNIDAD QUEDA INDISPONIBLE PARA EJECUTAR ORDEN DE OPERACI?N BAJA
CE PATUCA III 'U001 UNIDAD INDISPONIBLE 14/4/2023 07:31 EJECUTAR ORDEN DE OPERACION 9.93 0.00 DISPONIBILIDAD A 52 MW.
CE ZINGUIZAPA 'U001 SALIDA DE UNIDAD(ES) 27/4/2023 12:28 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 0.00 0.70 SALE DE L?NEA PARA MANTTO. INTERNO EN LA PLANTA
SALEN DE L?NEA PARA MANTENIMIENTO; OPERADOR INDICA QUE ABREN Y PROTEJEN
EL RECLOSER DE FORMA LOCAL PARA MANTENIMIENTO DE L?NEA A LO INTERNO DE
CE ZINGUIZAPA 'U001 SALIDA DE UNIDAD(ES) 28/4/2023 09:18 EFECTUAR MANTTO. SIN ORDEN DE OPERACION 8.82 0.60 LA PLANTA.
23-0834. UNIDAD SALE DE L?NEA A DISPOSICI?N DEL OPERADOR YA QUE LA MISMA
LA CEIBA TERMICA 'U002 UNIDAD INDISPONIBLE 15/4/2023 00:02 EJECUTAR ORDEN DE OPERACION 54.60 0.00 SER? SOMETIDA A TRABAJO PROGRAMADO SEG?N ORDEN 23-0834.
INICIA LA ORDEN N? 23-0972;REPARACI?N DE:FUGA DE ACEITE Y
COMBUSTIBLE;CAMBIO DE PERNOS DE ANCLAJE EN CAJAS ACCIONADORAS 6B.
LA CEIBA TERMICA 'U002 UNIDAD INDISPONIBLE 29/4/2023 00:00 EJECUTAR ORDEN DE OPERACION 54.00 0.00
99
SALIDAS DE OPERACIÓN POR MANTENIMIENTO GENERACION DEL SIN DE ABRIL 2023
100
SALIDAS DE OPERACIÓN POR MANTENIMIENTO GENERACION DEL SIN DE ABRIL 2023
101
SALIDAS DE OPERACIÓN POR MANTENIMIENTO GENERACION DEL SIN DE ABRIL 2023
102
ANEXOS 6-MANTENIMIENTOS EN TRANSMISIÓN
103
SALIDAS DE OPERACIÓN POR MANTENIMIENTO TRANSMISION DEL SIN DE ABRIL 2023
104
SALIDAS DE OPERACIÓN POR MANTENIMIENTO TRANSMISION DEL SIN DE ABRIL 2023
105
ANEXOS7-MANTENIMIENTOS EN DISTRIBUCIÓN
106
SALIDAS DE OPERACIÓN POR MANTENIMIENTO DISTRIBUCION DEL SIN DE ABRIL 2023
107
SALIDAS DE OPERACIÓN POR MANTENIMIENTO DISTRIBUCION DEL SIN DE ABRIL 2023
108
ANEXOS 8-MANTENIMIENTOS EN SUBESTACIONES
109
SALIDAS DE OPERACIÓN POR MANTENIMIENTO SUBESTACIONES DEL SIN DE ABRIL 2023
110
SALIDAS DE OPERACIÓN POR MANTENIMIENTO SUBESTACIONES DEL SIN DE ABRIL 2023
111
SALIDAS DE OPERACIÓN POR MANTENIMIENTO SUBESTACIONES DEL SIN DE ABRIL 2023
112
ANEXOS 9-MANTENIMIENTOS EN INTERCONEXIÓN
113
SALIDAS DE OPERACIÓN POR MANTENIMIENTO INTERCONEXION DEL SIN DE ABRIL 2023
114