Valorizacion Final Planta Lechera
Valorizacion Final Planta Lechera
Presupuesto Base VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACOMULADO Saldo a Ejecutar
ITMS Descripción
Valorizado Valorizado Valorizado Valorizado
Und. Metrado Precio S/. Parcial S/. Metrado % Metrado % Metrado % Metrado %
S/. S/. S/. S/.
22.04.00 ALBAÑILERÍA
0.00%
22.04.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5 M2 29.99 49.16 1,474.31 29.99 1,474.31 100.00% - - 0.00% 29.99 1,474.31 100.00% - 0.00
COSTO DIRECTO 21,773.12 12,350.20 56.72% 9,422.92 43.28% 21,773.12 100.00% 0.00 0.00%
GASTOS GENERALES (10 %) 3,223.16 1,828.25 1,394.91 3,223.16 0.00
GASTOS DE SUPERVICION (3 %) 400.78 227.33 173.45 400.78 0.00
GASTOS DE EXPEDIENTE TECNICO (3.5 %) 467.57 265.22 202.35 467.57 0.00
INVERSION TOTAL 25,864.62 14,670.99 56.72% 11,193.63 43.28% 25,864.62 100.00% 0.00 0.00%
VALORIZACION MENSUAL DEL MES DE NOVIEMBRE DEL 2013 POR PARTIDAS NUEVAS
MUNICIPALIDAD DE TUPAC AMARU
CANAS - CUSCO -PERU
Proyecto : "IMPLIMENTACION DE IMFRAESTRUCTURA DE ACOPIO Y TRANSFORMACION DE LECHE Y SUS DERVADOS EN EL DISTRITO DE TUPAC AMARU CANAS -CUSCO"
Función : 020 SALUD UBICACIÓN GEOGRAFICA
Programa : 043 SALUD COLECTIVA Region : Cusco
Sub Programa : 0093 REGULACION Y CONTROL SANITARIO Departamento : Cusco
Modalidad : ADMINISTRACION DIRECTA Provincia : Canas
proyecto (cod.) : 222168 Distrito : Tupac Amaru
meta : 046 Comunidad : tungasuca ccollana
Presupuesto Base VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACOMULADO Saldo a Ejecutar
ITMS Descripción Valorizado Valorizado Valorizado Valorizado
Und. Metrado Precio S/. Parcial S/. Metrado % Metrado % Metrado % Metrado %
S/. S/. S/. S/.
01.00 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION PARA CIMIENTOS CORRIDOS HASTA 1.00 M DE PROFUNDI M3 2.01 9.00 18.09 2.01 18.09 100.00% - - 0.00% 2.01 18.09 100.00% - - 0.00%
01.02 EXCAVACION PARA ZAPATAS HASTA 1.00 a 1.40M DE PROFUNDIDAD M3 0.80 12.34 9.87 0.80 9.87 100.00% - - 0.00% 0.80 9.87 100.00% - - 0.00%
01.03 CORTE DE TERRENO HASTA 0.50 DE PROFUNDIDAD SIN APISONADO M3 133.43 7.65 1020.74 125.55 960.46 94.09% 7.88 60.28 5.91% 133.43 1,020.74 100.00% - - 0.00%
01.04 EXCAVACION ZANJA PARA DESAGUE M3 53.84 9.00 484.56 53.84 484.56 100.00% - - 0.00% 53.84 484.56 100.00% - - 0.00%
01.05 RELLENO CON MATERIAL PROPIO DE LA ZANJA M4 3.85 7.39 28.45 3.85 28.45 100.00% - - 0.00% 3.85 28.45 100.00% - - 0.00%
02.00 CONCRETO SIMPLE
02.01 CIMIENTO CORRIDO MEZCLA 1:10 +30% P.M. (CALDERA) M3 2.01 198.14 398.26 2.01 398.26 100.00% - - 0.00% 2.01 398.26 100.00% - - 0.00%
02.02 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 M2 3.88 225.89 876.45 3.88 876.45 100.00% - - 0.00% 3.88 876.45 100.00% - - 0.00%
02.03 CAJA PARA DESAGUE
02.03.01 CONCRETO F'C=100 KG/CM2 P/CAJA DE DESAGUE M3 0.16 25.50 4.08 0.16 4.08 100.00% - - 0.00% 0.16 4.08 100.00% - - 0.00%
2.03.02 ECOFRADO P/CAJA DE DESAGUE M4 1.56 26.50 41.34 1.56 41.34 100.00% - - 0.00% 1.56 41.34 100.00% - - 0.00%
02.04 GRADAS DE PUERTA PRINCIPAL
02.04.01 ENCOFRADO Y DESENCOFRADO EN GRADAS M2 1.05 26.65 27.98 1.05 27.98 100.00% - - 0.00% 1.05 27.98 100.00% - - 0.00%
02.04.02 CONCRETO F'C=175 KG/CM2 EN GRADAS M3 0.63 229.73 144.73 0.63 144.73 100.00% - - 0.00% 0.63 144.73 100.00% - - 0.00%
02.05 BANQUETA DECONCRETO
02.05.01 ENCOFRADO Y DESENCOFRADO EN BANQUETA M2 10.00 31.54 315.40 10.00 315.40 100.00% - - 0.00% 10.00 315.40 100.00% - - 0.00%
02.05.02 CONCRETO F'C=140 KG/CM2 EN VEREDAS M3 2.28 229.73 523.78 2.28 523.78 100.00% - - 0.00% 2.28 523.78 100.00% - - 0.00%
03.00 CONCRETO ARMADO
03.01 CALDERA
03.01.01 CONCRETO PARA CALDERO F'C= 210 KG/CM2 M3 2.67 289.20 772.16 2.67 772.16 100.00% - 0.00% 2.67 772.16 100.00% - - 0.00%
03.01.02 ACERO ESTRUCTURAL PARA CALDERO KG 57.58 4.82 277.54 57.58 277.54 100.00% - - 0.00% 57.58 277.54 100.00% - - 0.00%
03.01.03 ENCOFRADO Y DESENCOFRADO EN CALDERA M2 65.65 31.54 2070.60 65.65 2,070.60 100.00% - - 0.00% 65.65 2,070.60 100.00% - - 0.00%
03.02 PUERTA PRINCIPAL
03.02.01 ZAPATAS
03.02.01.01 CONCRETO PARA ZAPATAS F'C= 175 KG/CM2 M3 0.80 339.11 271.29 0.80 271.29 100.00% - - 0.00% 0.80 271.29 100.00% - - 0.00%
03.02.01.02 ACERO PARA ZAPATAS KG 2.83 4.82 13.64 2.83 13.64 100.00% - - 0.00% 2.83 13.64 100.00% - - 0.00%
03.02.02 COLUMNAS
03.02.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 M3 0.21 401.63 84.34 0.21 84.34 100.00% - - 0.00% 0.21 84.34 100.00% - - 0.00%
03.02.02 ENCOFRADO DESENCOFRADO EN COLUMNAS M2 3.18 26.65 84.75 3.18 84.75 100.00% - - 0.00% 3.18 84.75 100.00% - - 0.00%
03.02.03 ACERO ESTRUCTURAL PARA COLUMNAS KG 22.32 4.82 107.58 22.32 107.58 100.00% - - 0.00% 22.32 107.58 100.00% - - 0.00%
03.03 PILETA
04.03.01 CONCRETO FC= 210 KG/CM2 M3 1.18 230.55 272.05 1.18 272.05 100.00% - - 0.00% 1.18 272.05 100.00% - - 0.00%
04.03.02 ACERO ESTRUCTURAL PARA PILETA KG 8.73 4.82 42.08 8.73 42.08 100.00% - - 0.00% 8.73 42.08 100.00% - - 0.00%
04.03 ENCOFRADO Y DESENCOFRADO EN PILETA M2 3.25 26.65 86.61 3.25 86.61 100.00% - - 0.00% 3.25 86.61 100.00% - - 0.00%
03.04 TAPA PARA DESAGUE
03.04.01 CONCRETO F'C=100 KG/CM2 P/TAPA DE DESAGUE M3 1.32 75.50 99.66 0.28 21.14 21.21% 1.04 78.52 78.79% 1.32 99.66 100.00% - - 0.00%
03.04.02 ENCOFRADO Y DESENCOFRADO P/TAPA DE DESAGUE M2 8.52 26.65 227.06 2.09 55.70 24.53% 6.43 171.36 75.47% 8.52 227.06 100.00% - - 0.00%
03.04.03 ACERO PARA TAPAS KG 10.62 4.82 51.19 - 0.00 0.00% 10.62 51.19 100.00% 10.62 51.19 100.00% - - 0.00%
04.00 REBOQUES Y ENLUCIDOS
04.01 TARRAJEO INTERIOR Y EXTERIOR CON MORTERO 1:5 X 1.5 CM (PILETA) M2 3.53 18.91 66.75 3.53 66.75 100.00% - - 0.00% 3.53 66.75 100.00% - - 0.00%
04.02 TARRAJEO INTERIOR CON MORTERO 1:5 X 1.5 CM (CALDERA) M2 8.72 18.91 164.90 8.72 164.90 100.00% - - 0.00% 8.72 164.90 100.00% - - 0.00%
04.03 TARRAJEO EXTERIOR CON MORTERO 1 : 5, 1.5CM (CALDERA) M2 8.72 18.58 162.02 8.72 162.02 100.00% - - 0.00% 8.72 162.02 100.00% - - 0.00%
04.04 TARRAJEO DE SUPERFICIE DE COLUMNAS M2 4.29 19.57 83.96 1.59 31.12 37.06% 2.70 52.84 62.94% 4.29 83.96 100.00% - - 0.00%
04.05 TARRAJEO DE SUPERFICIE EN GRADAS M2 1.76 18.58 32.70 1.76 32.70 100.00% - - 0.00% 1.76 32.70 100.00% - - 0.00%
04.06 TARRAJEO DE SUPERFICIE EN BANQUETAS M2 9.72 19.57 190.22 9.72 190.22 100.00% - - 0.00% 9.72 190.22 100.00% - - 0.00%
04.07 TARRAJEO C/MORTERO 1:5 X 1.5CM. EN TANQUE ELEVADO (PARED) M2 8.88 19.57 173.78 8.88 173.78 100.00% - - 0.00% 8.88 173.78 100.00% - - 0.00%
04.08 TARRAJEO DE COLUMNA EN TANQUE ELEVADO M2 7.98 18.91 150.90 7.98 150.90 100.00% - - 0.00% 7.98 150.90 100.00% - - 0.00%
04.09 TARRAJEO DE VIGA EN TANQUE ELEVADO M2 1.82 19.91 36.24 1.82 36.24 100.00% - - 0.00% 1.82 36.24 100.00% - - 0.00%
05.00 BRUÑADO
05.01 BRUÑADO EN PAREDES ML 243.96 1.21 295.19 243.96 295.19 100.00% - - 0.00% 243.96 295.19 100.00% - - 0.00%
06.00 PISOS Y PAVIMENTOS
06.01 EMPEDRADO DE PISO COM PIEDRA MEDIANA (GUARDIANIA) M2 115.64 9.12 1,054.64 115.64 1,054.64 100.00% - - 0.00% 115.64 1,054.64 100.00% - - 0.00%
06.02 PISO DE CONCRETO FC= 140 KG/CM2 EN CALDERA RIGIDO M3 1.77 190.30 336.83 1.77 336.83 100.00% - - 0.00% 1.77 336.83 100.00% - - 0.00%
06.03 PISO DE CONCRETO MEZCLA 1:12+50% P.G. EN TANQUE ELEVADO M3 0.50 190.30 95.15 - 0.00 0.00% 0.50 95.15 100.00% 0.50 95.15 100.00% - - 0.00%
06.04 PISO DE CONCRETO MEZCLA 1:12+50% P.G. EN PATIO M3 3.18 191.30 608.33 - 0.00 0.00% 3.18 608.33 100.00% 3.18 608.33 100.00% - - 0.00%
07.00 CUBIERTAS
07.01 CERCHA TUBO ESTRUCTURAL 4"X2" MM M 229.90 129.00 29,657.10 229.90 29,657.10 100.00% - - 0.00% 229.90 29,657.10 100.00% - - 0.00%
07.02 CINTAS TUBO ESTRUCTURAL DE 2"X1" MM M 406.50 14.30 5,812.95 406.50 5,812.95 100.00% - - 0.00% 406.50 5,812.95 100.00% - - 0.00%
07.03 COBERTURA CON TEJA ANDINA M2 423.36 39.80 16,849.73 423.36 16,849.73 100.00% - - 0.00% 423.36 16,849.73 100.00% - - 0.00%
07.04 CUMBRERA CON TEJA ANDINA M 38.00 15.27 580.26 38.00 580.26 100.00% - - 0.00% 38.00 580.26 100.00% - - 0.00%
07.05 COBERTURA CON CALAMINA M2 14.82 30.15 446.82 14.82 446.82 100.00% - - 0.00% 14.82 446.82 100.00% - - 0.00%
08.00 ESTRUCTURAS DE MADERA
08.01 VIGAS DE ROLLIZOS UND 4.00 27.11 108.44 4.00 108.44 100.00% - - 0.00% 4.00 108.44 100.00% - - 0.00%
09.00 INSTALACION ELECTRICA
09.01 CAJA DE REGISTRO P/INSTALACION ELECTRICA UND 1.00 10.00 10.00 1.00 10.00 100.00% - - 0.00% 1.00 10.00 100.00% - - 0.00%
09.02 POZO PUESTA A TIERRA UND 1.00 556.55 556.55 - 0.00 0.00% 1.00 556.55 100.00% 1.00 556.55 100.00% - - 0.00%
10.00 INSTALACION SANITARIA
10.01 CODO GALVANIZADO DE 1/2" PZA 10.00 8.60 86.00 10.00 86.00 100.00% - - 0.00% 10.00 86.00 100.00% - - 0.00%
10.02 TRAMPA DE 2" PZA 6.00 9.60 57.60 5.00 48.00 83.33% 1.00 9.60 16.67% 6.00 57.60 100.00% - - 0.00%
10.03 TRAMPA DE 4" PZA 9.00 10.60 95.40 9.00 95.40 100.00% - - 0.00% 9.00 95.40 100.00% - - 0.00%
10.04 YEE PVC SAL 4" A REDUCCION 2" PZA 9.00 11.60 104.40 9.00 104.40 100.00% - - 0.00% 9.00 104.40 100.00% - - 0.00%
10.05 LLAVES DE CONTROL DE 1/2" PARA AGUA PZA 3.00 7.00 21.00 1.00 7.00 33.33% 2.00 14.00 66.67% 3.00 21.00 100.00% - - 0.00%
10.06 TUBO PVC PESADO CON ROSCA DE 1/2" PARA AGUA M 6.00 16.00 96.00 3.00 48.00 50.00% 3.00 48.00 50.00% 6.00 96.00 100.00% - - 0.00%
10.07 CODO PVC SAL 1/2" X 90º UND 2.00 2.20 4.40 - 0.00 0.00% 2.00 4.40 100.00% 2.00 4.40 100.00% - - 0.00%
10.08 UPR DE 1/2" UND 4.00 1.50 6.00 - 0.00 0.00% 4.00 6.00 100.00% 4.00 6.00 100.00% - - 0.00%
11.00 TANQUE ELEVADO
11.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 PARA LOSA M3 1.57 429.14 673.75 1.57 673.75 100.00% - - 0.00% 1.57 673.75 100.00% - - 0.00%
11.02 ENCOFRADO Y DESENCOFRADO DE LOSA M2 1.57 21.00 32.97 1.57 32.97 100.00% - - 0.00% 1.57 32.97 100.00% - - 0.00%
11.03 ACERO ESTRUCTURAL PARA LOSA KG 69.68 4.79 333.77 69.68 333.77 100.00% - - 0.00% 69.68 333.77 100.00% - - 0.00%
12.00 ALBAÑILERIA
12.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5 (TANQU UND 8.38 56.03 469.53 8.38 469.53 100.00% - - 0.00% 8.38 469.53 100.00% - - 0.00%
CERCO PERIMETRICIO
01.00 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION PARA ZAPATAS DE 1.00 HASTA 1.40M DE PROFUNDIDAD M3 3.17 12.34 39.12 3.17 39.12 100.00% - - 0.00% 3.17 39.12 100.00% - - 0.00%
02.00 REMOCION DE MALLAS
02.01 REMOCION DE MALLAS EN CERCO PERIMETRICO UND 15.00 5.50 82.50 15.00 82.50 100.00% - - 0.00% 15.00 82.50 100.00% - - 0.00%
03.00 ALBAÑILERIA
03.01 ELABORACION DE BLOQUETA 0.15*0.40*0.20 CM UND 1,483.00 3.11 4,612.13 1,483.00 4,612.13 100.00% - - 0.00% 1,483.00 4,612.13 100.00% - - 0.00%
04.00 CONCRETO ARMADO
04.01 ZAPATAS
04.01.01 CONCRETO PARA ZAPATAS FC= 175 KG/CM2 M3 2.88 339.11 976.64 2.88 976.64 100.00% - - 0.00% 2.88 976.64 100.00% - - 0.00%
04.01.02 ACERO PARA ZAPATAS KG 10.62 4.82 51.19 10.62 51.19 100.00% - - 0.00% 10.62 51.19 100.00% - - 0.00%
05.00 REVOQUES ENLUCIDOS Y MOLDURAS
05.01 TARRAJEO EN INTERIORES C/MORTERO 1:5 X 1.5CM. M2 107.43 18.91 2,031.50 107.43 2,031.50 100.00% - - 0.00% 107.43 2,031.50 100.00% - - 0.00%
05.04 TARRAJEO EN COLUMNAS M2 8.23 19.57 161.06 8.23 161.06 100.00% - - 0.00% 8.23 161.06 100.00% - - 0.00%
05.02 TARRAJEO EN VIGAS M2 0.84 19.91 16.72 0.84 16.72 100.00% - - 0.00% 0.84 16.72 100.00% - - 0.00%
06.00 COLOCADO DE TEJAS
06.01 COLOCADO DE TEJAS EN CERCO PERIMETRICO ML 37.20 6.56 244.03 37.20 244.03 100.00% - - 0.00% 37.20 244.03 100.00% - - 0.00%
COSTO DIRECTO 76,023.46 74,267.23 97.69% 1,756.22 2.31% 76,023.46 100.00% 0.00 0.00%
GASTOS GENERALES (10 %) 11,254.04 10,994.06 259.98 11,254.04 0.00
GASTOS DE SUPERVICION (3 %) 1,399.36 1,367.03 32.33 1,399.36 0.00
GASTOS DE EXPEDIENTE TECNICO (3.5 %) 1,632.58 1,594.87 37.71 1,632.58 0.00
INVERSION TOTAL 90,309.44 88,223.19 97.69% 2,086.24 2.31% 90,309.44 100.00% 0.00 0.00%
VALORIZACION POR PARTIDAS NUEVAS
MUNICIPALIDAD DE TUPAC AMARU
CANAS - CUSCO -PERU
Proyecto : "IMPLIMENTACION DE IMFRAESTRUCTURA DE ACOPIO Y TRANSFORMACION DE LECHE Y SUS DERVADOS EN EL DISTRITO DE TUPAC AMARU CANAS -CUSCO"
Función : 020 SALUD UBICACIÓN GEOGRAFICA
Programa : 043 SALUD COLECTIVA Region : Cusco
Sub Programa : 0093 REGULACION Y CONTROL SANITARIO Departamento : Cusco
Modalidad : ADMINISTRACION DIRECTA Provincia : Canas
proyecto (cod.) : 222168 Distrito : Tupac Amaru
meta : 046 Comunidad : tungasuca ccollana
Presupuesto Base VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACOMULADO Saldo a Ejecutar
ITMS Descripción Valorizado Valorizado Valorizado Valorizado
Und. Metrado Precio S/. Parcial S/. Metrado % Metrado % Metrado % Metrado %
S/. S/. S/. S/.
01.00 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION PARA CIMIENTOS CORRIDOS HASTA 1.00 M DE PROFUNDI M3 2.01 9.00 18.09 2.01 18.09 100.00% - - 0.00% 2.01 18.09 100.00% - - 0.00%
01.02 EXCAVACION PARA ZAPATAS HASTA 1.00 a 1.40M DE PROFUNDIDAD M3 0.80 12.34 9.87 0.80 9.87 100.00% - - 0.00% 0.80 9.87 100.00% - - 0.00%
01.03 CORTE DE TERRENO HASTA 0.50 DE PROFUNDIDAD SIN APISONADO M3 133.43 7.65 1020.74 125.55 960.46 94.09% 7.88 60.28 5.91% 133.43 1,020.74 100.00% - - 0.00%
01.04 EXCAVACION ZANJA PARA DESAGUE M3 53.84 9.00 484.56 53.84 484.56 100.00% - - 0.00% 53.84 484.56 100.00% - - 0.00%
01.05 RELLENO CON MATERIAL PROPIO DE LA ZANJA M4 3.85 7.39 28.45 3.85 28.45 100.00% - - 0.00% 3.85 28.45 100.00% - - 0.00%
02.00 CONCRETO SIMPLE
02.01 CIMIENTO CORRIDO MEZCLA 1:10 +30% P.M. (CALDERA) M3 2.01 198.14 398.26 2.01 398.26 100.00% - - 0.00% 2.01 398.26 100.00% - - 0.00%
02.02 SOLADO PARA ZAPATAS DE 2" MEZCLA 1:12 M2 3.88 225.89 876.45 3.88 876.45 100.00% - - 0.00% 3.88 876.45 100.00% - - 0.00%
02.03 CAJA PARA DESAGUE
02.03.01 CONCRETO F'C=100 KG/CM2 P/CAJA DE DESAGUE M3 0.16 25.50 4.08 0.16 4.08 100.00% - - 0.00% 0.16 4.08 100.00% - - 0.00%
2.03.02 ECOFRADO P/CAJA DE DESAGUE M4 1.56 26.50 41.34 1.56 41.34 100.00% - - 0.00% 1.56 41.34 100.00% - - 0.00%
02.04 GRADAS DE PUERTA PRINCIPAL
02.04.01 ENCOFRADO Y DESENCOFRADO EN GRADAS M2 1.05 26.65 27.98 1.05 27.98 100.00% - - 0.00% 1.05 27.98 100.00% - - 0.00%
02.04.02 CONCRETO F'C=175 KG/CM2 EN GRADAS M3 0.63 229.73 144.73 0.63 144.73 100.00% - - 0.00% 0.63 144.73 100.00% - - 0.00%
02.05 BANQUETA DECONCRETO
02.05.01 ENCOFRADO Y DESENCOFRADO EN BANQUETA M2 10.00 31.54 315.40 10.00 315.40 100.00% - - 0.00% 10.00 315.40 100.00% - - 0.00%
02.05.02 CONCRETO F'C=140 KG/CM2 EN VEREDAS M3 2.28 229.73 523.78 2.28 523.78 100.00% - - 0.00% 2.28 523.78 100.00% - - 0.00%
03.00 CONCRETO ARMADO
03.01 CALDERA
03.01.01 CONCRETO PARA CALDERO F'C= 210 KG/CM2 M3 2.67 289.20 772.16 2.67 772.16 100.00% - 0.00% 2.67 772.16 100.00% - - 0.00%
03.01.02 ACERO ESTRUCTURAL PARA CALDERO KG 57.58 4.82 277.54 57.58 277.54 100.00% - - 0.00% 57.58 277.54 100.00% - - 0.00%
03.01.03 ENCOFRADO Y DESENCOFRADO EN CALDERA M2 65.65 31.54 2070.60 65.65 2,070.60 100.00% - - 0.00% 65.65 2,070.60 100.00% - - 0.00%
03.02 PUERTA PRINCIPAL
03.02.01 ZAPATAS
03.02.01.01 CONCRETO PARA ZAPATAS F'C= 175 KG/CM2 M3 0.80 339.11 271.29 0.80 271.29 100.00% - - 0.00% 0.80 271.29 100.00% - - 0.00%
03.02.01.02 ACERO PARA ZAPATAS KG 2.83 4.82 13.64 2.83 13.64 100.00% - - 0.00% 2.83 13.64 100.00% - - 0.00%
03.02.02 COLUMNAS
03.02.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 M3 0.21 401.63 84.34 0.21 84.34 100.00% - - 0.00% 0.21 84.34 100.00% - - 0.00%
03.02.02 ENCOFRADO DESENCOFRADO EN COLUMNAS M2 3.18 26.65 84.75 3.18 84.75 100.00% - - 0.00% 3.18 84.75 100.00% - - 0.00%
03.02.03 ACERO ESTRUCTURAL PARA COLUMNAS KG 22.32 4.82 107.58 22.32 107.58 100.00% - - 0.00% 22.32 107.58 100.00% - - 0.00%
03.03 PILETA
04.03.01 CONCRETO FC= 210 KG/CM2 M3 1.18 230.55 272.05 1.18 272.05 100.00% - - 0.00% 1.18 272.05 100.00% - - 0.00%
04.03.02 ACERO ESTRUCTURAL PARA PILETA KG 8.73 4.82 42.08 8.73 42.08 100.00% - - 0.00% 8.73 42.08 100.00% - - 0.00%
04.03 ENCOFRADO Y DESENCOFRADO EN PILETA M2 3.25 26.65 86.61 3.25 86.61 100.00% - - 0.00% 3.25 86.61 100.00% - - 0.00%
03.04 TAPA PARA DESAGUE
03.04.01 CONCRETO F'C=100 KG/CM2 P/TAPA DE DESAGUE M3 1.32 75.50 99.66 0.28 21.14 21.21% 1.04 78.52 78.79% 1.32 99.66 100.00% - - 0.00%
03.04.02 ENCOFRADO Y DESENCOFRADO P/TAPA DE DESAGUE M2 8.52 26.65 227.06 2.09 55.70 24.53% 6.43 171.36 75.47% 8.52 227.06 100.00% - - 0.00%
03.04.03 ACERO PARA TAPAS KG 10.62 4.82 51.19 - 0.00 0.00% 10.62 51.19 100.00% 10.62 51.19 100.00% - - 0.00%
04.00 REBOQUES Y ENLUCIDOS
04.01 TARRAJEO INTERIOR Y EXTERIOR CON MORTERO 1:5 X 1.5 CM (PILETA) M2 3.53 18.91 66.75 3.53 66.75 100.00% - - 0.00% 3.53 66.75 100.00% - - 0.00%
04.02 TARRAJEO INTERIOR CON MORTERO 1:5 X 1.5 CM (CALDERA) M2 8.72 18.91 164.90 8.72 164.90 100.00% - - 0.00% 8.72 164.90 100.00% - - 0.00%
04.03 TARRAJEO EXTERIOR CON MORTERO 1 : 5, 1.5CM (CALDERA) M2 8.72 18.58 162.02 8.72 162.02 100.00% - - 0.00% 8.72 162.02 100.00% - - 0.00%
04.04 TARRAJEO DE SUPERFICIE DE COLUMNAS M2 4.29 19.57 83.96 1.59 31.12 37.06% 2.70 52.84 62.94% 4.29 83.96 100.00% - - 0.00%
04.05 TARRAJEO DE SUPERFICIE EN GRADAS M2 1.76 18.58 32.70 1.76 32.70 100.00% - - 0.00% 1.76 32.70 100.00% - - 0.00%
04.06 TARRAJEO DE SUPERFICIE EN BANQUETAS M2 9.72 19.57 190.22 9.72 190.22 100.00% - - 0.00% 9.72 190.22 100.00% - - 0.00%
04.07 TARRAJEO C/MORTERO 1:5 X 1.5CM. EN TANQUE ELEVADO (PARED) M2 8.88 19.57 173.78 8.88 173.78 100.00% - - 0.00% 8.88 173.78 100.00% - - 0.00%
04.08 TARRAJEO DE COLUMNA EN TANQUE ELEVADO M2 7.98 18.91 150.90 7.98 150.90 100.00% - - 0.00% 7.98 150.90 100.00% - - 0.00%
04.09 TARRAJEO DE VIGA EN TANQUE ELEVADO M2 1.82 19.91 36.24 1.82 36.24 100.00% - - 0.00% 1.82 36.24 100.00% - - 0.00%
05.00 BRUÑADO
05.01 BRUÑADO EN PAREDES ML 243.96 1.21 295.19 243.96 295.19 100.00% - - 0.00% 243.96 295.19 100.00% - - 0.00%
06.00 PISOS Y PAVIMENTOS
06.01 EMPEDRADO DE PISO COM PIEDRA MEDIANA (GUARDIANIA) M2 115.64 9.12 1,054.64 115.64 1,054.64 100.00% - - 0.00% 115.64 1,054.64 100.00% - - 0.00%
06.02 PISO DE CONCRETO FC= 140 KG/CM2 EN CALDERA RIGIDO M3 1.77 190.30 336.83 1.77 336.83 100.00% - - 0.00% 1.77 336.83 100.00% - - 0.00%
06.03 PISO DE CONCRETO MEZCLA 1:12+50% P.G. EN TANQUE ELEVADO M3 0.50 190.30 95.15 - 0.00 0.00% 0.50 95.15 100.00% 0.50 95.15 100.00% - - 0.00%
06.04 PISO DE CONCRETO MEZCLA 1:12+50% P.G. EN PATIO M3 3.18 191.30 608.33 - 0.00 0.00% 3.18 608.33 100.00% 3.18 608.33 100.00% - - 0.00%
07.00 ESTRUCTURAS DE MADERA
07.01 VIGAS DE ROLLIZOS UND 4.00 27.11 108.44 4.00 108.44 100.00% - - 0.00% 4.00 108.44 100.00% - - 0.00%
08.00 INSTALACION ELECTRICA
08.01 CAJA DE REGISTRO P/INSTALACION ELECTRICA UND 1.00 10.00 10.00 1.00 10.00 100.00% - - 0.00% 1.00 10.00 100.00% - - 0.00%
08.02 POZO PUESTA A TIERRA UND 1.00 556.55 556.55 - 0.00 0.00% 1.00 556.55 100.00% 1.00 556.55 100.00% - - 0.00%
09.00 INSTALACION SANITARIA
09.01 CODO GALVANIZADO DE 1/2" PZA 10.00 8.60 86.00 10.00 86.00 100.00% - - 0.00% 10.00 86.00 100.00% - - 0.00%
09.02 TRAMPA DE 2" PZA 6.00 9.60 57.60 5.00 48.00 83.33% 1.00 9.60 16.67% 6.00 57.60 100.00% - - 0.00%
09.03 TRAMPA DE 4" PZA 9.00 10.60 95.40 9.00 95.40 100.00% - - 0.00% 9.00 95.40 100.00% - - 0.00%
09.04 YEE PVC SAL 4" A REDUCCION 2" PZA 9.00 11.60 104.40 9.00 104.40 100.00% - - 0.00% 9.00 104.40 100.00% - - 0.00%
09.05 LLAVES DE CONTROL DE 1/2" PARA AGUA PZA 3.00 7.00 21.00 1.00 7.00 33.33% 2.00 14.00 66.67% 3.00 21.00 100.00% - - 0.00%
09.06 TUBO PVC PESADO CON ROSCA DE 1/2" PARA AGUA M 6.00 16.00 96.00 3.00 48.00 50.00% 3.00 48.00 50.00% 6.00 96.00 100.00% - - 0.00%
09.07 CODO PVC SAL 1/2" X 90º UND 2.00 2.20 4.40 - 0.00 0.00% 2.00 4.40 100.00% 2.00 4.40 100.00% - - 0.00%
09.08 UPR DE 1/2" UND 4.00 1.50 6.00 - 0.00 0.00% 4.00 6.00 100.00% 4.00 6.00 100.00% - - 0.00%
10.00 TANQUE ELEVADO
10.01 CONCRETO EN COLUMNAS F'C= 210 KG/CM2 PARA LOSA M3 1.57 429.14 673.75 1.57 673.75 100.00% - - 0.00% 1.57 673.75 100.00% - - 0.00%
10.02 ENCOFRADO Y DESENCOFRADO DE LOSA M2 1.57 21.00 32.97 1.57 32.97 100.00% - - 0.00% 1.57 32.97 100.00% - - 0.00%
10.03 ACERO ESTRUCTURAL PARA LOSA KG 69.68 4.79 333.77 69.68 333.77 100.00% - - 0.00% 69.68 333.77 100.00% - - 0.00%
11.00 ALBAÑILERIA
11.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5 (TANQU UND 8.38 56.03 469.53 8.38 469.53 100.00% - - 0.00% 8.38 469.53 100.00% - - 0.00%
CERCO PERIMETRICIO
01.00 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION PARA ZAPATAS DE 1.00 HASTA 1.40M DE PROFUNDIDAD M3 3.17 12.34 39.12 3.17 39.12 100.00% - - 0.00% 3.17 39.12 100.00% - - 0.00%
02.00 REMOCION DE MALLAS
02.01 REMOCION DE MALLAS EN CERCO PERIMETRICO UND 15.00 5.50 82.50 15.00 82.50 100.00% - - 0.00% 15.00 82.50 100.00% - - 0.00%
03.00 ALBAÑILERIA
03.01 ELABORACION DE BLOQUETA 0.15*0.40*0.20 CM UND 1,483.00 3.11 4,612.13 1,483.00 4,612.13 100.00% - - 0.00% 1,483.00 4,612.13 100.00% - - 0.00%
04.00 CONCRETO ARMADO
04.01 ZAPATAS
04.01.01 CONCRETO PARA ZAPATAS FC= 175 KG/CM2 M3 2.88 339.11 976.64 2.88 976.64 100.00% - - 0.00% 2.88 976.64 100.00% - - 0.00%
04.01.02 ACERO PARA ZAPATAS KG 10.62 4.82 51.19 10.62 51.19 100.00% - - 0.00% 10.62 51.19 100.00% - - 0.00%
05.00 REVOQUES ENLUCIDOS Y MOLDURAS
05.01 TARRAJEO EN INTERIORES C/MORTERO 1:5 X 1.5CM. M2 107.43 18.91 2,031.50 107.43 2,031.50 100.00% - - 0.00% 107.43 2,031.50 100.00% - - 0.00%
05.04 TARRAJEO EN COLUMNAS M2 8.23 19.57 161.06 8.23 161.06 100.00% - - 0.00% 8.23 161.06 100.00% - - 0.00%
05.02 TARRAJEO EN VIGAS M2 0.84 19.91 16.72 0.84 16.72 100.00% - - 0.00% 0.84 16.72 100.00% - - 0.00%
06.00 COLOCADO DE TEJAS
06.01 COLOCADO DE TEJAS EN CERCO PERIMETRICO ML 37.20 6.56 244.03 37.20 244.03 100.00% - - 0.00% 37.20 244.03 100.00% - - 0.00%
COSTO DIRECTO 22,676.60 20,920.37 92.26% 1,756.22 7.74% 22,676.60 100.00% 0.00 0.00%
GASTOS GENERALES (10 %) 2,267.66 2,092.04 175.62 2,267.66 0.00
GASTOS DE SUPERVICION (3 %) 680.30 627.61 52.69 680.30 0.00
GASTOS DE EXPEDIENTE TECNICO (3.5 %) 793.68 732.21 61.47 793.68 0.00
INVERSION TOTAL 26,418.24 24,372.24 92.26% 2,046.00 7.74% 26,418.24 100.00% 0.00 0.00%
VALORIZACION FINAL DE OBR
MUNICIPALIDAD DE TUPAC AMARU
CANAS - CUSCO -PERU
Presupuesto Programado
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 M und 1.00 718.20
02 OBRAS PRELIMINARES
02.01 DEMOLICION DE CONSTRUCCION EXISTENTE (ALBAÑELERIA) m2 45.00 131.27
02.02 LIMPIEZA DEL TERRENO MANUAL m2 332.00 7.88
02.03 TRAZO Y REPLANTEO m2 332.00 20.84
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJA PARA CIMIENTOS HASTA 1.00 MT EN TERRENO NOR m3 62.11 31.50
03.02 EXCAVACION DE ZANJA A MANO PARA ZAPATAS m3 203.77 31.50
03.03 NIVELACION INTERIOR APISONADO MANUAL m2 332.00 7.91
03.04 ELIMINACION DE MATERIAL EXCEDENTE (CARGUIO A MANO) m3 78.00 18.38
04 CONCRETO SIMPLE
04.01 SOLADO PARA ZAPATAS e=2" MEZCLA 1:12 CEMENTO - HORMIGON m2 12.15 83.78
04.02 CIMIENTOS CORRIDOS MEZCLA CEMENTO - HORMIGON 1:10+30%PG m3 62.11 299.85
04.03 FALSA CIMENTACION MEZCLA CEMENTO - HORMIGON 1:10+50%PG m3 6.00 285.30
04.04 CONCRETO EN SOBRE CIMIENTOS1:8 + 25% PM m3 13.71 485.37
04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS HAS 0.40 MTS DE AL m2 137.21 55.33
04.06 CONCRETO EN FALSO PISO, 1:8 CEMENTO - HORMIGON, FROTACHADO e=2" m2 221.81 96.80
05 CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 CONCRETO EN ZAPATAS f'c= 175 kg/cm2 m3 53.87 406.93
05.01.02 ACERO DE REFUERZO fy=4200 Kg/cm2. EN ZAPATAS kg 520.53 5.38
05.02 COLUMNAS
05.02.01 CONCRETO EN COLUMNAS f´c=210 kg/cm2 m3 8.73 509.07
05.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 182.05 48.03
05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 1,317.52 8.49
05.03 VIGAS
05.03.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 20.15 496.37
05.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 212.40 50.73
05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 2,058.44 8.49
06 ALBAÑILERIA
06.01 MURO DE BLOQUE HUECO DE CONCRETO e=15 cm MEZCLA 1:5 m2 417.12 73.72
07 REVOQUES ENLUCIDOS Y MOLDURAS
07.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENA m2 129.68 28.47
07.02 TARRAJEO INTERIOR CON MORTERO 1:5 X 1.5 cm (CEMENTO - ARENA) m2 652.45 26.12
07.03 TARRAJEO EN EXTERIORES C:A 1:5 X 1.5 CM m2 150.04 40.20
07.04 TARRAJEO DE SUPERFICIE DE COLUMNA CON CEMENTO -ARENA m2 44.80 29.92
07.05 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO - ARENA m2 212.40 21.81
07.06 VISTIDURA DE DERRAMES m 191.15 20.63
08 CIELORRASOS
08.01 CIELORRASOS CON DRYWALL m2 213.45 32.56
09 PISOS Y PAVIMENTOS
09.01 PISO DE CERAMICO ANTIBACTERIAL DE 30 X 60 CM m2 225.14 84.68
09.02 VEREDA REGIDA DE CONCRETO F´C=140 KG/CM2 E=10 CM m2 33.46 82.23
10 CONTRAZOCALOS
10.01 CONTRAZOCALO DE LOSETA CLARA DE 10 X 20 CM m 354.00 21.29
11 ZOCALOS
11.01 ZOCALO DE CERAMICO DE 30X60 EN BLANCO DE 1ra m2 129.68 73.69
12 CUBERTURAS
12.01 CERCHAS DE TUBO ESTRUCTURAL DE 4 x 2 MM m 229.90 128.33
12.02 CINTA TUBO ESTRUCTURALES DE 2" X 1" m 406.50 13.92
12.03 CUBERTURA CON TEJA ANDINA m2 423.36 40.01
12.04 CUMBRERA CON TEJA ANDINA m 38.00 15.34
13 CARPENTERIA METALICA
13.01 PUERTA METALICA PRINCIPAL CON TUB. GALV. DE 2" Y REFUERZO m2 4.90 14,539.01
13.02 PUERTA C/ MARCO DE ANGULAR + PLANCHA METALICA DE 1.6 mm m2 47.32 295.42
13.03 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. L 3/4" m2 24.53 286.05
14 CERRAJERIA
14.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 40.00 26.30
14.02 CERRADURA PARA PUERTA PRINCIPAL PESADA und 2.00 95.75
14.03 CERRADURA PARA PUERTA DE BAÑO SEG. INT. MANIJ. CERRAD. GOAL und 2.00 50.75
14.04 CHAPA PARA INTERIOR, C/SEGURO INTERIOR Y LLAVE EXTERIOR 1 GOLP und 14.00 62.20
15 VIDRIOS Y CRISTALES
15.01 VIDRIO SEMIDOBLE PROVICION Y COLOCACION EN VENTANA DE FIERRO p2 264.00 6.51
16 PINTURAS
16.01 PINTURA LATEX EN MUROS INTERIORES 02 MANOS m2 652.00 16.81
16.02 PINTURA LATEX EN MUROS EXTERIORES 02 MANOS m2 150.00 16.81
16.03 PINTURA EN PUERTAS C/ESMALTE 02 MANOS m2 52.20 15.51
16.04 PINTURA EN VENTANAS C/ESMALTE 02 MANOS m2 24.50 15.51
17 INSTALACIONES ELECTRICAS
17.01 SALIDA PARA CENTRO DE LUZ C/INTERRUPTOR pto 27.00 110.58
17.02 SALIDA PARA TOMACORRIENTE BIPOLAR SIMPLE CON PVC pto 31.00 77.54
17.03 SALIDA PARA SPOT-LIHT CON PVC pto 3.00 120.54
17.04 SALIDA PARA ANTENA DE TELEVISION CON PVC pto 1.00 99.54
17.05 INTERRUPTOR THEMOMAGNETICO TRIFASICA 3 X 30A und 1.00 87.73
17.06 TABLERO DE DISTRIBUCION CAJA METALICA CON 12 POLOS pza 1.00 158.63
17.07 FLUORECENTE RECTO ISPE 40 W INCLUYENDO EQUIPO Y PANTALLA und 27.00 69.66
18 APARATOS Y ACCESORIOS SANITARIOS
18.01 INODORO TANQUE BAJO BLANCO pza 2.00 220.00
18.02 LAVADERO DE PARED BLANCO 1 LLAVE und 2.00 250.00
18.03 PAPELERA LOSA BLANCO und 2.00 80.00
18.04 COLOCACION DE APARATOS CORRIENTES pza 4.00 111.53
18.05 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES pza 6.00 96.08
19 INSTALACIONES SANITARIAS
19.01 SALIDA DE DESAGUE EN PVC pto 24.00 46.93
19.02 TUBERIA DE PVC SAL D= 2" m 13.00 25.01
19.03 TUBERIA DE PVC SAL D= 4" m 9.00 19.16
19.04 CODO PVC SAL 4" X 45° pza 16.00 14.53
19.05 CODO PVC SAL 4" X 90° pza 12.00 14.28
19.06 CODO PVC SAL 2" X 90° pza 14.00 13.93
19.07 CODO PVC SAL 2" X 45° pza 8.00 12.93
19.08 YEE PVC SAL 4" pza 8.00 16.93
19.09 SOMBRERO DE VENTILACION 2" und 2.00 14.10
19.10 SUMIDERO DE 2" und 6.00 54.56
19.11 REGISTRO DE BRONCE 4" pza 9.00 54.32
20 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
20.01 VALVULA COMPUERTA DE 1/2" und 6.00 83.13
20.02 VALVULA COMPUERTA DE 3/4" und 2.00 74.13
20.03 SALIDA DE AGUA FRIA CON TUBERIA GALAVANIZADA pto 1.00 71.61
20.04 RED DE DISTRIBUCION CON TUBERIA DE PVC C-10 DE 1/2" m 85.00 23.17
20.05 RED DE DISTRIBUCION CON TUBERIA DE PVC C-10 DE 3/4" m 35.00 31.16
21 SISTEMA DE AGUA DE LLUVIA
21.01 CAJA DE REGISTRO DE DESAGUE DE 12" X 24" pza 3.00 153.60
21.02 INSTALACION TUBERIA A-C DE 6" (150mm) + PRUEBA HIDRAULICA m 45.00 10.43
22 CERCO PERIMETRICO
22.01 EXCAVACION DE ZANJA EN TIERRA COMPACTADA m3 13.85 22.15
23 CONCRETO SIMPLE
23.01 CIMIENTOS CORRIDOS MEZCLA CEMENTO - HORMIGON 1:10+30%PG m3 13.85 299.85
23.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 2.42 169.06
23.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS HAS 0.40 MTS DE AL m2 32.31 55.33
24 CONCRETO ARMADO
24.01 COLUMNAS
24.01.01 CONCRETO EN COLUMNAS f´c=210 kg/cm2 m3 3.31 509.07
24.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 53.00 48.03
24.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 214.08 8.49
24.02 VIGAS
24.03 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 0.71 496.37
24.04 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 9.52 50.73
24.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN COLUMNAS kg 224.53 8.49
25 ALBAÑILERIA
26 MURO DE BLOQUE HUECO DE CONCRETO e=15 cm MEZCLA 1:5 m2 76.00 73.72
27 REVOQUE Y ENLUCIDOS
28 TARRAJEO EN EXTERIORES C:A 1:5 X 1.5 CM m2 152.80 40.20
29 PINTURAS
30 PINTURA LATEX EN MUROS EXTERIORES 02 MANOS m2 152.80 16.81
COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE EXPEDIENTE TECNICO
PRESUPUESTO TOTAL
INAL DE OBRA