Val. #01
Val. #01
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUESTO 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
OBRAS PROVISIONALES
01 30,316.47 17,723.25 58.46% 12,593.22 41.54% 0.00 0.00% 0.00 0.00%
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 25186.44 25,186.44 12,593.22 0.50 50.00% 12,593.22 0.50 50.00% - - 0.00% - - 0.00%
01.02 TOPOGRAFIA Y GEOREFERENCIACION KM 0.05 2001.81 100.09 100.09 0.05 100.00% - - 0.00% - - 0.00% - - 0.00%
01.03 CARTEL DE IDENTIFICACION DE OBRA UND 1.00 1800.00 1,800.00 1,800.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
01.04 ENCAUSAMIENTO PROVICIONAL DE RIO M3 64.00 11.14 712.96 712.96 64.00 100.00% - - 0.00% - - 0.00% - - 0.00%
01.05 LIMPIEZA DE TERRENO M2 182.92 6.88 1,258.49 1,258.49 182.92 100.00% - - 0.00% - - 0.00% - - 0.00%
01.06 TRAZO, NIVELACION Y REPLANTEO M2 182.92 6.88 1,258.49 1,258.49 182.92 100.00% - - 0.00% - - 0.00% - - 0.00%
CONSTRUCCION DE PUENTE
02 724,592.75 82,055.46 11.32% 229,079.21 31.61% 327,063.49 45.14% 86,394.59 11.92%
TRABAJOS PRELIMINARES
02.01 1,294.54 1,294.54 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
02.01.01 TOPOGRAFIA Y GEOREFERENCIACION PUENTE M2 188.16 6.88 1,294.54 1,294.54 188.16 100.00% - - 0.00% - - 0.00% - - 0.00%
02.02 SUB ESTRUCTURA - ESTRIBOS 605,263.45 80,760.92 13.34% 228,358.03 37.73% 219,749.91 36.31% 76,394.59 12.62%
02.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO BAJO AGUA M3 855.83 13.44 11,502.36 5,751.24 427.92 50.00% 5,751.13 427.92 50.00% - - 0.00% - - 0.00%
02.02.02 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO EN SECO M3 316.34 13.44 4,251.61 2,125.80 158.17 50.00% 2,125.80 158.17 50.00% - - 0.00% - - 0.00%
SOLADOS 1:12 + 30% PG
02.02.03 M2 91.46 47.07 4,305.02 2,152.51 45.73 50.00% 2,152.51 45.73 50.00% - - 0.00% - - 0.00%
02.02.04 ENCOFRADO Y DESENCOFRADO M2 701.64 93.49 65,596.32 13,119.45 140.33 20.00% 32,798.16 350.82 50.00% 19,678.71 210.49 30.00% - - 0.00%
02.02.05 ACERO DE REFUERZO fy=4200kg/CM2 KG 26,598.29 7.22 192,039.65 57,611.92 7,979.49 30.00% 57,611.92 7,979.49 30.00% 76,815.82 10,639.32 40.00% - - 0.00%
02.02.06 CONCRETO F'C=245 KG/CM2 M3 352.17 775.67 273,167.70 - - 0.00% 109,268.63 140.87 40.00% 109,268.63 140.87 40.00% 54,630.44 70.43 20.00%
RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO ELECCIONADO
02.02.07 M3 928.22 29.06 26,974.07 - - 0.00% 10,789.69 371.29 40.00% 8,092.34 278.47 30.00% 8,092.04 278.47 30.00%
02.02.08 RELLENO PARA ESTRUCTURAS CON MATERIAL DE PRESTAMO COMPACTADO POR M3 125.95 50.20 6,322.69 - - 0.00% 2,529.08 50.38 40.00% 1,896.55 37.79 30.00% 1,897.06 37.79 30.00%
02.02.09 RELLENO FILTRANTE EN ESTRIBOS M3 146.25 91.13 13,327.76 - - 0.00% 5,331.11 58.50 40.00% 3,997.86 43.88 30.00% 3,998.78 43.88 30.00%
02.02.10 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE M3 317.14 24.52 7,776.27 - - 0.00% - - 0.00% - - 0.00% 7,776.27 317.14 100.00%
02.03 SUPER ESTRUCTURA - FALSO PUENTE 11,832.48 0.00 0.00% 0.00 0.00% 11,832.48 100.00% 0.00 0.00%
02.02.01 FALSO PUENTE M 8.00 1,479.06 11,832.48 - - 0.00% - - 0.00% 11,832.48 8.00 100.00% - - 0.00%
02.04 SUPER ESTRUCTURA (LOSA Y VEREDA DE PUENTE) 49,297.95 0.00 0.00% 0.00 0.00% 49,297.95 100.00% 0.00 0.00%
02.04.01 ENCOFRADO Y DESENCOFRADO M2 91.00 93.49 8,507.59 - - 0.00% - - 0.00% 8,507.59 91.00 100.00% - - 0.00%
02.04.02 ACERO DE REFUERZO fy=4200kg/CM2 KG 3,693.27 7.22 26,665.41 - - 0.00% - - 0.00% 26,665.41 3,693.27 100.00% - - 0.00%
02.04.03 CONCRETO F'C=245 KG/CM2 M3 18.21 775.67 14,124.95 - - 0.00% - - 0.00% 14,124.95 18.21 100.00% - - 0.00%
02.05 LOSA DE APROXIMACION 29,086.35 0.00 0.00% 0.00 0.00% 29,086.35 100.00% 0.00 0.00%
02.05.01 ENCOFRADO Y DESENCOFRADO M2 8.89 93.49 831.13 - - 0.00% - - 0.00% 831.13 8.89 100.00% - - 0.00%
1
CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO A LA FECHA DE INICIO
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUESTO 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
02.05.02 ACERO DE REFUERZO fy=4200kg/CM2 KG 1,722.35 7.22 12,435.37 - - 0.00% - - 0.00% 12,435.37 1,722.35 100.00% - - 0.00%
02.05.03 CONCRETO F'C=140 KG/CM2 M3 4.10 478.44 1,961.60 - - 0.00% - - 0.00% 1,961.60 4.10 100.00% - - 0.00%
02.05.04 CONCRETO F'C=210 KG/CM2 M3 19.72 666.18 13,137.07 - - 0.00% - - 0.00% 13,137.07 19.72 100.00% - - 0.00%
02.05.05 JUNTA E ILATACION 1cm X 1" M 10.26 70.29 721.18 - - 0.00% - - 0.00% 721.18 10.26 100.00% - - 0.00%
02.06 VARIOS 27,817.98 0.00 0.00% 721.18 2.59% 17,096.80 61.46% 10,000.00 35.95%
JUNTA ELASTOMERICA TIPO TRANFLEX
02.06.01 M 10.26 70.29 721.18 - - 0.00% 721.18 10.26 100.00% - - 0.00% - - 0.00%
02.06.02 ACABADO ENDURECIDO DE VEREDA M3 16.00 35.80 572.80 - - 0.00% - - 0.00% 572.80 16.00 100.00% - - 0.00%
02.06.03 BRUÑAS CORTA GOTERA EN LOSA M 16.00 11.62 185.92 - - 0.00% - - 0.00% 185.92 16.00 100.00% - - 0.00%
02.06.04 TUBERIA DE DRENAJE EN LOSA UND 8.00 15.62 124.96 - - 0.00% - - 0.00% 124.96 8.00 100.00% - - 0.00%
02.06.05 TUBERIA DE DRENAJE EN ESTRIBOS UND 8.00 15.62 124.96 - - 0.00% - - 0.00% 124.96 8.00 100.00% - - 0.00%
02.06.06 DISPOSITIVO DE APOYO MOVIL EN ESTRIBO IZQUIERDO UND 2.00 1,007.64 2,015.28 - - 0.00% - - 0.00% 2,015.28 2.00 100.00% - - 0.00%
02.06.07 DISPOSITIVO DE APOYO FIJO EN ESTRIBO DERECHO UND 2.00 1,007.64 2,015.28 - - 0.00% - - 0.00% 2,015.28 2.00 100.00% - - 0.00%
02.06.08 TOPE SISMICO LONGITUDINAL UND 4.00 1,007.64 4,030.56 - - 0.00% - - 0.00% 4,030.56 4.00 100.00% - - 0.00%
02.06.09 BARANDAS METALICA INCL. PINTADO M 16.00 501.69 8,027.04 - - 0.00% - - 0.00% 8,027.04 16.00 100.00% - - 0.00%
02.06.10 PRUEBA DE CARGA DE SUPERESTRUCTURA GLB 1.00 10,000.00 10,000.00 - - 0.00% - - 0.00% - - 0.00% 10,000.00 1.00 100.00%
OBRAS COMPLEMENTARIAS
03.00 69,864.24 22,540.29 32.26% 22,540.29 32.26% 15,216.46 21.78% 9,567.21 13.69%
03.01 PLACA RECORDATIVA UND 1.00 240.00 240.00 - - 0.00% - - 0.00% - - 0.00% 240.00 1.00 100.00%
03.02 LIMPIEZA FINAL DE OBRA M2 41.81 4.72 197.34 - - 0.00% - - 0.00% - - 0.00% 197.34 41.81 100.00%
03.03 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 8,561.08 8,561.08 4,280.54 0.50 50.00% 4,280.54 0.50 50.00% - - 0.00% - - 0.00%
03.04 FLETE TERRESTRE GLB 1.00 60,865.82 60,865.82 18,259.75 0.30 30.00% 18,259.75 0.30 30.00% 15,216.46 0.25 25.00% 9,129.87 0.15 15.00%
04 MITIGACION DE IMPACTO AMBIENTAL 37,727.07 11,318.12 30.00% 11,318.12 30.00% 11,318.12 30.00% 3,772.70 10.00%
04.01 MITIGACION AMBIENTAL GLB 1.00 37,727.07 37,727.07 11,318.12 0.30 30.00% 11,318.12 0.30 30.00% 11,318.12 0.30 30.00% 3,772.70 0.10 10.00%
2
CALENDARIO DE AVANCE DE OBRA VALORIZADO ACTUALIZADO A LA FECHA DE INICIO
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUESTO 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
3
ITEM DESCRIPCION COSTO (S/.)
A COSTO DIRECTO ( CD ) S/ 862,500.53
B GASTOS GENERALES (14.80%) S/ 127,650.08
C UTILIDAD (UTI = 5% ) S/ 43,125.03
=======
D SUB TOTAL (A+B+C) ###
E IGV 18 % S/ 185,989.62
=======
F MONTO TOTAL DE LA OFERTA ### ###
CRONOGRAMA DE MANO DE OBRA ADICIONAL, DEDUCTIVO Y MAYORES METRADOS N° 01-2022
: “AMPLIACION Y MEJORAMIENTO DESERVICIO DE AGUA DEL SISTEMA DE RIEGO DE LA COMUNIDAD DE
PROYECTO
CCACHUBAMBA, DISTRITO DE VISCHONGO - VILCAS HUAMAN - AYACUCHO" ADELANTO
COSTO DIRECTO S/ 862,500.53 S/ 0.00
DIRECTO
ADELANTO
GASTOS GENERALES (2.10%CD) S/ 127,650.08 S/ 0.00
MATERIALES
UTILIDAD (1.4%CD) S/ 43,125.03 INICIO DE OBRA : 13 DE DICIEMBRE 2024
CONTROL DE VIGILANCIA ANTE COVID -19 #REF! TERMINO DE OBRA : 02 DE FEBRERO 2023
RESIDENTE DE : ING EDGAR
SUBTOTAL S/ 1,033,275.64
OBRA
SUPERVISOR DE :FERNANDEZ
ING. CARLOSCUTI
IGV 18% S/ 185,989.62
OBRA
COSTO MANO DE FERNANDEZ JERI
COSTO TOTAL S/ 1,219,265.26 S/ 95,095.58
OBRA
LUGAR : AYACUCHO - VILCAS HUAMAN - VISCHONGO
PREC. 23/NOV./2022 - 30/NOV./2022 01/DIC./2022 - 31/DIC./2022 01/ENE/2023 - 02/ENE./2023
PRESUPUE
INDICE Nombre de tarea UNDCANTIDADUNIT. 8 DIAS 31 DIAS 02 DIAS
STO S/.
S/. Costo MetradoPorcentaje Costo MetradoPorcentaje Costo Metrado Porcentaje
1 MANO DE OBRA 95,095.58 ### ### ### ### 9,509.56 10.00%
OPERARIO HH ### 23.45 37,845.02 7,568.96 322.77 ### ### ### ### 3,784.52 161.39 10.00%
OFIACIAL HH ### 18.54 22,562.27 4,512.45 243.39 ### ### 851.87 ### 2,256.18 121.70 10.00%
PEON HH ### 16.76 34,655.09 6,931.10 413.55 ### ### ### ### 3,465.36 206.77 10.00%
TOPOGRAFO HH 1.26 26.43 33.20 6.61 0.25 ### 23.26 0.88 ### 3.50 0.11 10.00%
COSTO TOTAL DE MANO DE OBRA 95,095.58 19,019.12 66,566.90 9,509.56
20.00% 70.00% 10.00%
20.00% 90.00% 100.00%
CRONOGRAMA DE MATERIALES ADICIONAL, DEDUCTIVO Y MAYORES METRADOS N° 01 - 2022
: “AMPLIACION Y MEJORAMIENTO DESERVICIO DE AGUA DEL SISTEMA DE RIEGO DE LA COMUNIDAD DE CCACHUBAMBA, DISTRITO DE VISCHONGO - VILCAS
Proyect
HUAMAN - AYACUCHO"
PROCESO SELEC. : LICITACION PUBLCA N° 001-2022-MDV/CS-1
CONTRATO OBRA : N° 001 - 2022 - MDV/GM.
FECHA PPTO. BASE : MARZO - 2022
PPTO. CONTRATO : 3,148,240.00
CONTRATISTA : CONSORCIO RIEGO VISCHONGO
SUPERVISIÓN : CONSORCIO TITANKA
MONTO DE ADELANTO DE MATERIALES (C/IGV) S/0.00
MONTO DE ADELANTO DE MATERIALES (S/IGV) S/0.00
FECHA DMUNICIPALIDAD DISTRITAL DE VISCHONGO :
DATOS GENERALES
AVANCE DE OBRA ANTERIOR 0.000%
AVANCE DE OBRA MENSUAL 0.000%
AVANCE DE OBRA ACUMULADO 0.000%
% AVANCE MENSUAL
VALORIZACION MENSUAL % AVANCE MENSUAL VALORIZACION ACUMULADA
MES ACUMULADO ESTADO DE LA OBRA
Programad
Programado Ejecutado Programado Ejecutado Programado Ejecutado Ejecutado
o
13 DIC. 24 - - 0.00% 0.00% - 0.00 0.00% 0.00% 0.00%
31 DIC. 24 188,914.79 - 15.49% 0.00% 188,914.79 0.00 15.49% 0.00% 0.00%
31 ENE. 25 389,501.42 - 31.95% 0.00% 578,416.21 0.00 47.44% 0.00% 0.00% -
28 FEB. 25 499,860.37 - 41.00% 0.00% 1,078,276.58 0.00 88.44% 0.00% 0.00% -
12 MAR. 25 140,988.68 - 11.56% 0.00% 1,219,265.26 0.00 100.00% 0.00% 0.00% -
SUB TOTAL CD 1,219,265.26 - 100.0% 0.00% 0.00 0.000%
CURVA DE AVANCE DE OBRA PROGRAMADO VS EJECUTADO
110.00%
100.00% 100.00%
Ejecutado Programado
90.00%
88.44%
80.00%
70.00%
60.00%
50.00%
47.44%
40.00%
30.00%
20.00%
15.49%
10.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
13 DIC. 24 31 DIC. 24 31 ENE. 25 28 FEB. 25 12 MAR. 25
499,860.37
500,000.00
AVANCE DE OBRA PROGRAMADO
389,501.42
450,000.00
400,000.00
350,000.00
300,000.00
188,914.79
250,000.00
140,988.68
200,000.00
150,000.00
100,000.00
50,000.00
-
-
-
PROGRAMADO EJECUTADO
VALORIZACION DE OBRA N° 01
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 25186.44 25,186.44 - - 0.00% 12,593.22 0.50 50.00% 12,593.22 0.50 50.00% 12,593.22 0.50 50.00%
01.02 TOPOGRAFIA Y GEOREFERENCIACION KM 0.05 2001.81 100.09 - - 0.00% 100.09 0.05 100.00% 100.09 0.05 100.00% - - 0.00%
01.03 CARTEL DE IDENTIFICACION DE OBRA UND 1.00 1800.00 1,800.00 - - 0.00% 1,800.00 1.00 100.00% 1,800.00 1.00 100.00% - - 0.00%
01.04 ENCAUSAMIENTO PROVICIONAL DE RIO M3 64.00 11.14 712.96 - - 0.00% 712.96 64.00 100.00% 712.96 64.00 100.00% - - 0.00%
01.05 LIMPIEZA DE TERRENO M2 182.92 6.88 1,258.49 - - 0.00% 1,258.49 182.92 100.00% 1,258.49 182.92 100.00% - - 0.00%
01.06 TRAZO, NIVELACION Y REPLANTEO M2 182.92 6.88 1,258.49 - - 0.00% 1,258.49 182.92 100.00% 1,258.49 182.92 100.00% - - 0.00%
CONSTRUCCION DE PUENTE
02 724,592.75 0.00 0.00% 198,113.05 27.34% 198,116.65 27.34% 526,475.99 72.66%
TRABAJOS PRELIMINARES
02.01 1,294.54 0.00 0.00% 1,294.52 100.00% 1,294.54 100.00% 0.00 0.00%
02.01.01 TOPOGRAFIA Y GEOREFERENCIACION PUENTE M2 188.16 6.88 1,294.54 - - 0.00% 1,294.52 188.16 100.00% 1,294.54 188.16 100.00% - - 0.00%
02.02 SUB ESTRUCTURA - ESTRIBOS 605,263.45 0.00 0.00% 196,818.53 32.52% 196,822.11 32.52% 408,441.23 67.48%
02.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO BAJO AGUA M3 855.83 13.44 11,502.36 - - 0.00% 5,751.19 427.92 50.00% 5,751.24 427.92 50.00% 5,750.99 427.91 50.00%
02.02.02 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO EN SECO M3 316.34 13.44 4,251.61 - - 0.00% 2,856.96 212.57 67.20% 2,856.94 212.57 67.20% 1,394.67 103.77 32.80%
SOLADOS 1:12 + 30% PG
02.02.03 M2 91.46 47.07 4,305.02 - - 0.00% 2,152.56 45.73 50.00% 2,152.51 45.73 50.00% 2,152.51 45.73 50.00%
02.02.04 ENCOFRADO Y DESENCOFRADO M2 701.64 93.49 65,596.32 - - 0.00% 9,826.89 105.11 14.98% 9,826.73 105.11 14.98% 55,769.59 596.53 85.02%
02.02.05 ACERO DE REFUERZO fy=4200kg/CM2 KG 26,598.29 7.22 192,039.65 - - 0.00% 90,987.65 12,602.17 47.38% 90,987.67 12,602.17 47.38% 101,051.99 13,996.12 52.62%
02.02.06 CONCRETO F'C=245 KG/CM2 M3 352.17 775.67 273,167.70 - - 0.00% 82,791.28 106.74 30.31% 82,795.02 106.74 30.31% 190,372.69 245.43 69.69%
RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO ELECCIONADO
02.02.07 M3 928.22 29.06 26,974.07 - - 0.00% - - 0.00% - - 0.00% 26,974.07 928.22 100.00%
02.02.08 RELLENO PARA ESTRUCTURAS CON MATERIAL DE PRESTAMO COMPACTADO POR C M3 125.95 50.20 6,322.69 - - 0.00% - - 0.00% - - 0.00% 6,322.69 125.95 100.00%
02.02.09 RELLENO FILTRANTE EN ESTRIBOS M3 146.25 91.13 13,327.76 - - 0.00% - - 0.00% - - 0.00% 13,327.76 146.25 100.00%
02.02.10 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE M3 317.14 24.52 7,776.27 - - 0.00% 2,452.00 100.00 31.53% 2,452.00 100.00 31.53% 5,324.27 217.14 68.47%
02.03 SUPER ESTRUCTURA - FALSO PUENTE 11,832.48 0.00 0.00% 0.00 0.00% 0.00 0.00% 11,832.48 100.00%
02.02.01 FALSO PUENTE M 8.00 1,479.06 11,832.48 - - 0.00% - - 0.00% - - 0.00% 11,832.48 8.00 100.00%
02.04 SUPER ESTRUCTURA (LOSA Y VEREDA DE PUENTE) 49,297.95 0.00 0.00% 0.00 0.00% 0.00 0.00% 49,297.95 100.00%
02.04.01 ENCOFRADO Y DESENCOFRADO M2 91.00 93.49 8,507.59 - - 0.00% - - 0.00% - - 0.00% 8,507.59 91.00 100.00%
02.04.02 ACERO DE REFUERZO fy=4200kg/CM2 KG 3,693.27 7.22 26,665.41 - - 0.00% - - 0.00% - - 0.00% 26,665.41 3,693.27 100.00%
02.04.03 CONCRETO F'C=245 KG/CM2 M3 18.21 775.67 14,124.95 - - 0.00% - - 0.00% - - 0.00% 14,124.95 18.21 100.00%
02.05 LOSA DE APROXIMACION 29,086.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 29,086.35 100.00%
02.05.01 ENCOFRADO Y DESENCOFRADO M2 8.89 93.49 831.13 - - 0.00% - - 0.00% - - 0.00% 831.13 8.89 100.00%
02.05.02 ACERO DE REFUERZO fy=4200kg/CM2 KG 1,722.35 7.22 12,435.37 - - 0.00% - - 0.00% - - 0.00% 12,435.37 1,722.35 100.00%
02.05.03 CONCRETO F'C=140 KG/CM2 M3 4.10 478.44 1,961.60 - - 0.00% - - 0.00% - - 0.00% 1,961.60 4.10 100.00%
02.05.04 CONCRETO F'C=210 KG/CM2 M3 19.72 666.18 13,137.07 - - 0.00% - - 0.00% - - 0.00% 13,137.07 19.72 100.00%
02.05.05 JUNTA E ILATACION 1cm X 1" M 10.26 70.29 721.18 - - 0.00% - - 0.00% - - 0.00% 721.18 10.26 100.00%
02.06 VARIOS 27,817.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 27,817.98 100.00%
10
VALORIZACION DE OBRA N° 01
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
02.06.02 ACABADO ENDURECIDO DE VEREDA M3 16.00 35.80 572.80 - - 0.00% - - 0.00% - - 0.00% 572.80 16.00 100.00%
02.06.03 BRUÑAS CORTA GOTERA EN LOSA M 16.00 11.62 185.92 - - 0.00% - - 0.00% - - 0.00% 185.92 16.00 100.00%
02.06.04 TUBERIA DE DRENAJE EN LOSA UND 8.00 15.62 124.96 - - 0.00% - - 0.00% - - 0.00% 124.96 8.00 100.00%
02.06.05 TUBERIA DE DRENAJE EN ESTRIBOS UND 8.00 15.62 124.96 - - 0.00% - - 0.00% - - 0.00% 124.96 8.00 100.00%
02.06.06 DISPOSITIVO DE APOYO MOVIL EN ESTRIBO IZQUIERDO UND 2.00 1,007.64 2,015.28 - - 0.00% - - 0.00% - - 0.00% 2,015.28 2.00 100.00%
02.06.07 DISPOSITIVO DE APOYO FIJO EN ESTRIBO DERECHO UND 2.00 1,007.64 2,015.28 - - 0.00% - - 0.00% - - 0.00% 2,015.28 2.00 100.00%
02.06.08 TOPE SISMICO LONGITUDINAL UND 4.00 1,007.64 4,030.56 - - 0.00% - - 0.00% - - 0.00% 4,030.56 4.00 100.00%
02.06.09 BARANDAS METALICA INCL. PINTADO M 16.00 501.69 8,027.04 - - 0.00% - - 0.00% - - 0.00% 8,027.04 16.00 100.00%
02.06.10 PRUEBA DE CARGA DE SUPERESTRUCTURA GLB 1.00 10,000.00 10,000.00 - - 0.00% - - 0.00% - - 0.00% 10,000.00 1.00 100.00%
OBRAS COMPLEMENTARIAS
03.00 69,864.24 0.00 0.00% 38,993.99 55.81% 38,993.99 55.81% 30,870.25 44.19%
03.01 PLACA RECORDATIVA UND 1.00 240.00 240.00 - - 0.00% - - 0.00% - - 0.00% 240.00 1.00 100.00%
03.02 LIMPIEZA FINAL DE OBRA M2 41.81 4.72 197.34 - - 0.00% - - 0.00% - - 0.00% 197.34 41.81 100.00%
03.03 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 8,561.08 8,561.08 - - 0.00% 8,561.08 1.00 100.00% 8,561.08 1.00 100.00% - - 0.00%
03.04 FLETE TERRESTRE GLB 1.00 60,865.82 60,865.82 - - 0.00% 30,432.91 0.50 50.00% 30,432.91 0.50 50.00% 30,432.91 0.50 50.00%
04 MITIGACION DE IMPACTO AMBIENTAL 37,727.07 0.00 0.00% 11,318.12 30.00% 11,318.12 30.00% 26,408.94 70.00%
04.01 MITIGACION AMBIENTAL GLB 1.00 37,727.07 37,727.07 - - 0.00% 11,318.12 0.30 30.00% 11,318.12 0.30 30.00% 26,408.94 0.70 70.00%
11
PRESUPUES
ITEM DESCRPCION VAL. N° 01
TO SIN IGV
OBRAS PROVISIONALES
01 30,316.47 17,723.25
CONSTRUCCION DE PUENTE
02 724,592.75 ###
OBRAS COMPLEMENTARIAS
03 69,864.24 38,993.99
04 MITIGACION DE IMPACTO AMBIENTAL 37,727.07 11,318.12
COSTO DIRECTO ( CD ) 862,500.53 ###
GASTOS GENERALES (14.80%) 127,650.08 39,389.96
UTILIDAD (UTI = 5% ) 43,125.03 13,307.42
==============
SUB TOTAL ### ###
IGV 18 % 185,989.62 57,392.24
==============
COSTO DE OBRA ### ###
AVANCE FISICO MENSUAL 30.86%
AVANCE FISICO ACUMULADO 30.86%
RESUMEN DE VALORIZACIÓN N° 01 DICIEMBRE - 2024
OBRA "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO
DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
IGV 18% S/. 0.00 S/. 51,653.02 S/. 51,653.02 S/. 134,336.60
TOTAL A CANCELAR S/. 0.00 S/. 338,614.24 S/. 338,614.24 S/. 880,651.03
CONTROL DE AMORTIZACION DEL ADELANTO DIRECTO DICIEMBRE - 2024
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUEST 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. O S/.
PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%)
01 ALAMBRE NEGRO RECOCIDO # 16 KG 960.42 5.08 4,878.92 755.95 148.81 15.49% 1,558.59 306.81 31.95% 2,000.20 393.74 41.00% 564.18 111.06 11.56%
02 ALAMBRE NEGRO RECOCIDO # 8 KG 160.31 5.08 814.36 126.19 24.84 15.49% 260.15 51.21 31.95% 333.86 65.72 41.00% 94.18 18.54 11.56%
03 CLAVOS PARA MADERA CON CABEZA DE 3" KG 160.31 4.24 679.70 105.32 24.84 15.49% 217.13 51.21 31.95% 278.65 65.72 41.00% 78.61 18.54 11.56%
04 CLAVOS KG 28.00 4.24 118.72 18.40 4.34 15.49% 37.91 8.94 31.95% 48.68 11.48 41.00% 13.74 3.24 11.56%
05 PERNO PASANTE FIERRO GALVANIZADO DE 5/8" X 1 1/4" PZA 12.48 1.69 21.09 3.26 1.93 15.49% 6.74 3.99 31.95% 8.65 5.12 41.00% 2.43 1.44 11.56%
SOPORTE PARA TUBO METALICO (ASEGURADORES)
06 UND 12.48 38.14 475.99 73.61 1.93 15.49% 152.18 3.99 31.95% 195.28 5.12 41.00% 54.92 1.44 11.56%
07 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 KG 32,013.91 5.50 176,076.52 27,281.54 4,960.28 15.49% 56,248.67 ### 31.95% 72,185.85 ### 41.00% 20,360.45 3,701.90 11.56%
08 ARENA FINA M3 1.03 152.00 155.97 24.32 0.16 15.49% 50.16 0.33 31.95% 63.84 0.42 41.00% 18.24 0.12 11.56%
09 PIEDRA CHANCADA DE 3/4" M3 257.26 95.00 24,440.17 3,786.70 39.86 15.49% 7,807.10 82.18 31.95% 10,019.65 105.47 41.00% 2,826.25 29.75 11.56%
10 AFIRMADO M3 117.00 62.00 7,254.00 1,124.06 18.13 15.49% 2,317.56 37.38 31.95% 2,974.14 47.97 41.00% 838.86 13.53 11.56%
11 ARENA GRUESA M3 224.06 80.00 17,924.91 2,777.60 34.72 15.49% 5,726.40 71.58 31.95% 7,348.80 91.86 41.00% 2,072.80 25.91 11.56%
12 ASFALTO RC-250 GAL 2.73 10.17 27.76 4.27 0.42 15.49% 8.85 0.87 31.95% 11.39 1.12 41.00% 3.25 0.32 11.56%
13 CEMENTO PORTLAND TIPO I (42.5 kg) BOL 3,918.31 31.00 121,467.54 18,820.41 607.11 15.49% 38,803.63 1,251.73 31.95% 49,797.78 1,606.38 41.00% 14,045.79 453.09 11.56%
14 YESO DE 28 Kg BOL 1.93 5.51 10.64 1.65 0.30 15.49% 3.42 0.62 31.95% 4.35 0.79 41.00% 1.21 0.22 11.56%
15 NEOPRENO SIMPLE 800X250X50 UND 8.00 457.63 3,661.04 567.46 1.24 15.49% 1,171.53 2.56 31.95% 1,501.03 3.28 41.00% 421.02 0.93 11.56%
16 DESMOLDEADOR CHEMADESMOLD TB GAL 40.08 123.31 4,941.83 765.76 6.21 15.49% 1,578.37 12.80 31.95% 2,025.98 16.43 41.00% 570.93 4.63 11.56%
17 MEDIDAS PARA MANEJO DEL MEDIO FISICO PM10 MES 1.00 7,504.56 7,504.56 1,125.68 0.15 15.49% 2,401.46 0.32 31.95% 3,076.87 0.41 41.00% 900.55 0.12 11.56%
18 MEDIDAS PARA MANEJO DEL MEDIO BIOLOGICO MES 1.00 500.00 500.00 75.00 0.15 15.49% 160.00 0.32 31.95% 205.00 0.41 41.00% 60.00 0.12 11.56%
19 MEDIDAS PARA MANEJO DEL MEDIO SOCIAL MES 1.00 1,000.00 1,000.00 150.00 0.15 15.49% 320.00 0.32 31.95% 410.00 0.41 41.00% 120.00 0.12 11.56%
20 CAPACITACION EN MANEJO DE RESIDUOS SOLIDOS EV 1.00 1,430.00 1,430.00 214.50 0.15 15.49% 457.60 0.32 31.95% 586.30 0.41 41.00% 171.60 0.12 11.56%
21 IMPLEMENTACION DE CONTENEDORES UND 1.00 1,216.44 1,216.44 182.47 0.15 15.49% 389.26 0.32 31.95% 498.74 0.41 41.00% 145.97 0.12 11.56%
22 TRANSPORTE Y DISPOCISION FINAL DE RESIDUOS SOLIDOS GLB 1.00 5,000.00 5,000.00 750.00 0.15 15.49% 1,600.00 0.32 31.95% 2,050.00 0.41 41.00% 600.00 0.12 11.56%
23 CAPACITACION EN EL IGA APROBADO - COMPROMISOS A EJECUTAR E EV 1.00 1,430.00 1,430.00 214.50 0.15 15.49% 457.60 0.32 31.95% 586.30 0.41 41.00% 171.60 0.12 11.56%
24 MONITOREO DE CALIDAD DE AGUA MUESTRA 1.00 2,400.00 2,400.00 360.00 0.15 15.49% 768.00 0.32 31.95% 984.00 0.41 41.00% 288.00 0.12 11.56%
25 MONITOREO DE CALIDAD DE AIRE MUESTRA 1.00 3,600.00 3,600.00 540.00 0.15 15.49% 1,152.00 0.32 31.95% 1,476.00 0.41 41.00% 432.00 0.12 11.56%
26 MONITOREO DE CALIDAD DE RUIDO MUESTRA 1.00 1,050.00 1,050.00 157.50 0.15 15.49% 336.00 0.32 31.95% 430.50 0.41 41.00% 126.00 0.12 11.56%
27 IMPLEMENTACION DE SEÑALES AMBIENTALES Y DE SEGURIDAD EN O UND 10.00 420.48 4,204.80 651.74 1.55 15.49% 1,341.33 3.19 31.95% 1,723.97 4.10 41.00% 487.76 1.16 11.56%
28 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO UND 300.00 1.41 423.00 65.54 46.48 15.49% 135.13 95.84 31.95% 173.42 122.99 41.00% 48.91 34.69 11.56%
29 RESTAURACION DE CANTERAS UND 1,500.00 0.89 1,335.00 206.84 232.41 15.49% 426.47 479.18 31.95% 547.31 614.95 41.00% 154.37 173.45 11.56%
30 ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE M3 317.14 5.15 1,633.27 253.07 49.14 15.49% 521.75 101.31 31.95% 669.60 130.02 41.00% 188.85 36.67 11.56%
31 REVEGETACION HA 1.00 5,000.00 5,000.00 750.00 0.15 15.49% 1,600.00 0.32 31.95% 2,050.00 0.41 41.00% 600.00 0.12 11.56%
32 ADITIVO PLASTIFICANTE CONCRETO CHEMAPLAST GAL 5.82 53.39 310.94 48.05 0.90 15.49% 99.31 1.86 31.95% 127.60 2.39 41.00% 35.54 0.67 11.56%
33 SOLDADURA CELLOCORD P 3/16" KG 1.28 16.95 21.70 3.39 0.20 15.49% 6.95 0.41 31.95% 8.81 0.52 41.00% 2.54 0.15 11.56%
35 FLETE M 1.00 60,865.82 60,865.82 9,834.39 0.15 15.49% 19,364.33 0.32 31.95% 24,907.48 0.41 41.00% 6,656.07 0.12 11.56%
36 MOVILIZACION Y DESMOVILIZACION GLB 1.00 25,186.44 25,186.44 3,777.97 0.15 15.49% 8,059.66 0.32 31.95% 10,326.44 0.41 41.00% 3,022.37 0.12 11.56%
37 HORMIGON (PUESTO EN OBRA) UND 8.23 64.00 526.81 81.92 1.28 15.49% 168.32 2.63 31.95% 215.68 3.37 41.00% 60.80 0.95 11.56%
38 AGUA M2 255.74 1.80 460.34 71.33 39.63 15.49% 147.06 81.70 31.95% 188.73 104.85 41.00% 53.23 29.57 11.56%
39 CARTELES DE OBRA GLB 1.00 1,800.00 1,800.00 270.00 0.15 15.49% 576.00 0.32 31.95% 738.00 0.41 41.00% 216.00 0.12 11.56%
40 CORDEL M 2.50 0.89 2.23 0.35 0.39 15.49% 0.71 0.80 31.95% 0.91 1.02 41.00% 0.26 0.29 11.56%
CALENDARIO DE ADQUISICION DE MATERIALES
PROYECTO "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUEST 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. O S/.
PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%)
41 EQUIPO DE PROTECCION INDIVIDUAL GLB 1.00 8,561.08 8,561.08 1,284.16 0.15 15.49% 2,739.55 0.32 31.95% 3,510.04 0.41 41.00% 1,027.33 0.12 11.56%
42 PRUEBA DE CARGA PARA PUENTE GLB 1.00 10,000.00 10,000.00 1,500.00 0.15 15.49% 3,200.00 0.32 31.95% 4,100.00 0.41 41.00% 1,200.00 0.12 11.56%
43 MADERA TORNILLO P2 1,200.00 4.07 4,884.00 756.74 185.93 15.49% 1,560.23 383.35 31.95% 2,002.28 491.96 41.00% 564.75 138.76 11.56%
44 ESTACA DE MADERA TORNILLO TRATADA P2 8.42 0.85 7.16 1.11 1.30 15.49% 2.29 2.69 31.95% 2.93 3.45 41.00% 0.82 0.97 11.56%
45 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO P2 3,606.89 7.50 27,051.64 4,191.45 558.86 15.49% 8,641.80 1,152.24 31.95% 11,090.33 1,478.71 41.00% 3,128.10 417.08 11.56%
46 PLATINA DE ACERO 1/2" X 8" X 6 m PZA 1.04 4.66 4.85 0.75 0.16 15.49% 1.54 0.33 31.95% 2.00 0.43 41.00% 0.56 0.12 11.56%
47 PLATINA DE ACERO 3/4" X 8" X 6 m PZA 0.21 4.66 0.97 0.14 0.03 15.49% 0.33 0.07 31.95% 0.42 0.09 41.00% 0.09 0.02 11.56%
48 PLATINA DE ACERO 3/4" X 9" X 6 m PZA 0.18 4.66 0.82 0.14 0.03 15.49% 0.28 0.06 31.95% 0.33 0.07 41.00% 0.09 0.02 11.56%
49 PINTURA ESMALTE SINTETICO GL 0.03 32.20 0.81 - - 15.49% 0.32 0.01 31.95% 0.32 0.01 41.00% - - 11.56%
50 HUACHA PLANA DE 5/8" UND 12.48 5.51 68.76 10.63 1.93 15.49% 21.98 3.99 31.95% 28.21 5.12 41.00% 7.93 1.44 11.56%
51 TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 3 1/2" X 3/16" M 16.00 200.00 3,200.00 496.00 2.48 15.49% 1,022.00 5.11 31.95% 1,312.00 6.56 41.00% 370.00 1.85 11.56%
52 TUBERIA PVC SAL 4" UND 72.00 1.84 132.48 20.53 11.16 15.49% 42.32 23.00 31.95% 54.32 29.52 41.00% 15.33 8.33 11.56%
53 PLACA RECORDATORIA UND 1.00 240.00 240.00 36.00 0.15 15.49% 76.80 0.32 31.95% 98.40 0.41 41.00% 28.80 0.12 11.56%
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUESTO 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE
COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO PORCENTAJE (%)
(%)
01.01 HERRAMIENTAS MANUALES %MO 1.00 9329.24 9,329.24 1,399.39 0.15 15.49% 2,985.36 0.32 31.95% 3,824.99 0.41 41.00% 1,119.51 0.12 11.56%
01.02 BONO BAJO AGUA %MO 1.00 83.34 83.34 12.50 0.15 15.49% 26.67 0.32 31.95% 34.17 0.41 41.00% 10.00 0.12 11.56%
01.03 CIZALLA PARA ACERO CONSTRUCCION HASTA 1" UND 121.65 30.00 3,649.59 565.50 18.85 15.49% 1,165.80 38.86 31.95% 1,496.10 49.87 41.00% 422.10 14.07 11.56%
01.04 MIRAS Y JALONES HM 29.69 3.75 111.32 17.25 4.60 15.49% 35.55 9.48 31.95% 45.64 12.17 41.00% 12.86 3.43 11.56%
01.05 MEZCLADORA DE CONCRETO DE 11p3 HM 1.82 16.00 29.15 4.48 0.28 15.49% 9.28 0.58 31.95% 12.00 0.75 41.00% 3.36 0.21 11.56%
01.06 CAMION VOLQUETE 15 m3 HM 16.90 200.00 3,380.72 524.00 2.62 15.49% 1,080.00 5.40 31.95% 1,386.00 6.93 41.00% 390.00 1.95 11.56%
02.01.01 SOLDADORA ELECTRICA MONOFASICA ALTERNA 225 A HM 1.28 13.00 16.64 2.60 0.20 15.49% 5.33 0.41 31.95% 6.76 0.52 41.00% 1.95 0.15 11.56%
02.02.01 ANDAMIO METAL TABLAS ALQUILER EST 1.28 35.00 44.80 7.00 0.20 15.49% 14.35 0.41 31.95% 18.20 0.52 41.00% 5.25 0.15 11.56%
02.02.02 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP HM 187.10 30.00 5,613.01 869.70 28.99 15.49% 1,793.10 59.77 31.95% 2,301.30 76.71 41.00% 649.20 21.64 11.56%
02.02.03 CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3 HM 16.90 240.00 4,056.86 628.80 2.62 15.49% 1,296.00 5.40 31.95% 1,663.20 6.93 41.00% 468.00 1.95 11.56%
02.02.04 RETROEXCAVADOR SOBRE ORUGA 115-165 HP 0.75-1.4 Y HM 37.51 340.00 12,753.23 1,975.40 5.81 15.49% 4,073.20 11.98 31.95% 5,229.20 15.38 41.00% 1,475.15 4.34 11.56%
02.02.05 TRACTOR DE ORUGAS DE 190-240 HP HM 1.47 440.00 644.86 101.20 0.23 15.49% 206.80 0.47 31.95% 264.00 0.60 41.00% 74.80 0.17 11.56%
02.02.06 VIBRADOR DE CONCRETO 4 HP 2.40" HM 387.98 15.00 5,819.67 901.65 60.11 15.49% 1,859.10 123.94 31.95% 2,385.90 159.06 41.00% 672.90 44.86 11.56%
02.02.07 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 HM 422.74 16.00 6,763.84 1,048.00 65.50 15.49% 2,160.80 135.05 31.95% 2,772.96 173.31 41.00% 782.08 48.88 11.56%
02.02.08 TEODOLITO HM 29.69 20.00 593.73 92.00 4.60 15.49% 189.60 9.48 31.95% 243.40 12.17 41.00% 68.60 3.43 11.56%
02.02.09 NIVEL TOPOGRAFICO HM 0.80 7.50 6.00 0.90 0.12 15.49% 1.95 0.26 31.95% 2.48 0.33 41.00% 0.68 0.09 11.56%
02.02.10 ESTACION TOTAL HM 0.80 15.00 12.00 1.80 0.12 15.49% 3.90 0.26 31.95% 4.95 0.33 41.00% 1.35 0.09 11.56%
DEL 13 DE DIC. AL 31 DE DIC. 2024 DEL 01 ENE. AL 31 DE ENE. 2025 DEL 01 DE FEB. AL 28 DE FEB. 2025 DEL 01 DE MAR. AL 12 DE MAR. 2025
PREC. PRESUPUESTO 19 DIAS 31 DIAS 28 DIAS 12 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE
COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO COSTO S/. METRADO PORCENTAJE (%) COSTO S/. METRADO PORCENTAJE (%)
(%)
01.01 OPERADOR DE EQUIPO PESADO %MO 3.66 25.49 93.25 14.53 0.57 15.49% 29.82 1.17 31.95% 38.24 1.50 41.00% 10.71 0.42 11.56%
01.02 TOPOGRAFO %MO 30.49 25.49 777.10 120.31 4.72 15.49% 248.27 9.74 31.95% 318.63 12.50 41.00% 89.98 3.53 11.56%
01.03 CAPATAZ UND 96.77 28.04 2,713.55 420.32 14.99 15.49% 867.00 30.92 31.95% 1,112.35 39.67 41.00% 313.77 11.19 11.56%
01.04 OPERARIO HM 3446.85 25.49 87,860.17 ### 534.06 15.49% ### 1,101.12 31.95% ### 1,413.10 41.00% ### 398.57 11.56%
01.05 OFICIAL HM 3018.97 20.06 60,560.62 9,383.27 467.76 15.49% ### 964.43 31.95% ### 1,237.68 41.00% 7,002.94 349.10 11.56%
01.06 PEON HM 6,613.60 17.19 113,687.77 ### 1,024.72 15.49% ### 2,112.75 31.95% ### 2,711.37 41.00% ### 764.76 11.56%
DEL 08 DE ENE. AL 31 DE ENE. 2024 DEL 01 DE FEB. AL 29 DE FEB. 2024 DEL 01 DE MARZ. AL 31 DE MARZ. 2024 DEL 01 DE ABR. AL 06 DE ABR. 2024
PREC. PRESUPUESTO 24 DIAS 29 DIAS 29 DIAS 06 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
ARENA FINA m3 3.99 80.08 319.68 - - 0.00% 128.13 1.60 40.00% 191.39 2.39 60.00% - - 0.00%
PIEDRA CHANCADA DE 3/4" m3 188.59 53.39 10,068.71 1,006.94 18.86 10.00% 5,034.68 94.30 50.00% 4,027.74 75.44 40.00% - - 0.00%
PIEDRA GRANDE DE 6-10" m3 1,081.61 46.00 49,753.97 4,975.36 108.16 10.00% 24,877.26 540.81 50.00% 19,901.44 432.64 40.00% - - 0.00%
ARENA GRUESA m3 72.47 44.49 3,224.11 322.55 7.25 10.00% 1,612.32 36.24 50.00% 1,289.77 28.99 40.00% - - 0.00%
PIEDRA GRANDE m3 18.72 33.90 634.61 63.39 1.87 10.00% 317.30 9.36 50.00% 253.91 7.49 40.00% - - 0.00%
HORMIGON m3 31.08 38.14 1,185.21 118.62 3.11 10.00% 592.70 15.54 50.00% 474.08 12.43 40.00% - - 0.00%
CEMENTO PORTLAND TIPO I (42.5KG) BOL 975.92 30.00 29,277.61 2,927.70 97.59 10.00% 14,638.80 487.96 50.00% 11,711.10 390.37 40.00% - - 0.00%
ALAMBRE GALVANIZADO # 2 kg 983.28 6.45 6,342.16 634.23 98.33 10.00% 3,171.08 491.64 50.00% 2,536.85 393.31 40.00% - - 0.00%
CLAVOS PARA MADERA C/C 2" kg 6.93 6.35 44.01 4.38 0.69 10.00% 22.03 3.47 50.00% 17.59 2.77 40.00% - - 0.00%
CLAVOS PARA MADERA C/C 3" kg 48.21 6.35 306.16 30.61 4.82 10.00% 153.10 24.11 50.00% 122.43 19.28 40.00% - - 0.00%
ALAMBRE NEGRO N°16 kg 108.88 6.45 702.27 70.24 10.89 10.00% 351.14 54.44 50.00% 280.90 43.55 40.00% - - 0.00%
ALAMBRE NEGRO N°8 kg 94.43 6.45 609.09 60.89 9.44 10.00% 304.57 47.22 50.00% 243.62 37.77 40.00% - - 0.00%
CLAVOS DE ALAMBRE PARA MADERA C/C DE 4" kg 71.83 6.35 456.09 45.59 7.18 10.00% 228.09 35.92 50.00% 182.44 28.73 40.00% - - 0.00%
01 ACERO DE REFUERZO FY=4200 GRADO 60 kg 777.24 6.45 5,013.18 501.29 77.72 10.00% 2,506.60 388.62 50.00% 2,005.31 310.90 40.00% - - 0.00%
01.05 ACEITE PARA MOTOR GRADO 30 gln 0.04 47.21 1.77 - - 0.00% 0.94 0.02 50.00% 0.94 0.02 50.00% - - 0.00%
01.05.01 ASFALTO RC-250 gln 19.33 21.00 405.89 - - 0.00% - - 0.00% - - 0.00% 405.93 19.33 100.00%
01.05.02 BISAGRA CAPUCHINA 4"X4" und 6.93 2.52 17.46 - - 0.00% - - 0.00% 8.74 3.47 50.00% 8.74 3.47 50.00%
01.05.03 YESO EN BOLSAS DE 25 KG. BOL 103.40 7.00 723.80 361.90 51.70 50.00% 361.90 51.70 50.00% - - 0.00% - - 0.00%
01.05.04 IMPERM.CHEMA 1 LIQUIDO gln 24.95 40.68 1,014.97 - - 0.00% 507.69 12.48 50.00% 507.69 12.48 50.00% - - 0.00%
01.05.05 IMPRIMANTE gln 49.90 17.50 873.25 - - 0.00% - - 0.00% - - 0.00% 873.25 49.90 100.00%
02 WINCHA und 62.04 11.85 735.18 735.17 62.04 100.00% - - 0.00% - - 0.00% - - 0.00%
02.01 FLETE TERRESTRE glb 1.00 30,000.00 30,000.00 3,000.00 0.10 10.00% 12,000.00 0.40 40.00% 12,000.00 0.40 40.00% 3,000.00 0.10 10.00%
02.01.01 GASOLINA 84 OCTANOS gln 54.65 14.50 792.37 79.32 5.47 10.00% 396.29 27.33 50.00% 316.97 21.86 40.00% - - 0.00%
02.01.01.01 ENERGIA ELECTRICA P/OBRA POR MES mes 4.00 400.00 1,600.00 400.00 1.00 25.00% 400.00 1.00 25.00% 400.00 1.00 25.00% 400.00 1.00 25.00%
02.01.01.02 BOTIQUIN DE MADERA und 1.00 80.00 80.00 80.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
20
CALENDARIO DE ADQUISICION DE MATERIALES
"MEJORAMIENTO DE LOS SERVICIOS CULTURALES PARA LA PARTICIPACIÓN DE LA POBLACIÓN EN LAS INDUSTRIAS CULTURALES Y LAS ARTES EN LA LOCALIDAD DE RACCAYA, DEL DISTRITO DE CANARIA DE LA PROVINCIA DE VICTOR FAJARDO DEL DEPARTEMENTO DE
PROYECTO
AYACUCHO"
DEL 08 DE ENE. AL 31 DE ENE. 2024 DEL 01 DE FEB. AL 29 DE FEB. 2024 DEL 01 DE MARZ. AL 31 DE MARZ. 2024 DEL 01 DE ABR. AL 06 DE ABR. 2024
PREC. PRESUPUESTO 24 DIAS 29 DIAS 29 DIAS 06 DIAS
ITEM NOMBRE DE TAREA UND METRADO
UNIT. S/. S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
02.01.02 MEDICAMENTOS BASICOS glb 1.00 500.00 500.00 500.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
02.01.02.01 CAMILLA und 1.00 120.00 120.00 120.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
02.01.02.02 CILINDRO VACIO ABIERTO und 1.00 60.00 60.00 30.00 0.50 50.00% 30.00 0.50 50.00% - - 0.00% - - 0.00%
02.01.03 LIJA PARA MADERA und 152.50 1.60 244.00 - - 0.00% - - 0.00% - - 0.00% 244.00 152.50 100.00%
02.01.03.01 AGUA m3 33.97 2.35 79.84 39.93 16.99 50.00% 39.93 16.99 50.00% - - 0.00% - - 0.00%
02.01.04 CARTEL DE OBRA 3.60x4.80-TIPO BANER + MARCO MET. Y PARANTES m2 1.00 1,500.00 1,500.00 1,500.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
02.01.04.01 INSTALACIÓN TELEFÓNICA, INTERNET Y COMUNICACIÓN PROVISIONAL mes 4.00 250.00 1,000.00 250.00 1.00 25.00% 250.00 1.00 25.00% 250.00 1.00 25.00% 250.00 1.00 25.00%
02.02 MATERIAL BIBLIOGRAFICO Y PAPELERIA PARA CAPACITACION glb 2.00 1,000.00 2,000.00 200.00 0.20 10.00% 600.00 0.60 30.00% 600.00 0.60 30.00% 600.00 0.60 30.00%
02.02.01 MADERA NACIONAL P/ENCOFRADO-CARP p2 2,686.81 3.80 10,209.89 5,104.96 1,343.41 50.00% 5,104.96 1,343.41 50.00% - - 0.00% - - 0.00%
02.03 REGLA DE MADERA p2 6.74 3.36 22.63 - - 0.00% 22.65 6.74 100.00% - - 0.00% - - 0.00%
02.03.01 ANDAMIO DE MADERA p2 269.46 4.20 1,131.73 - - 0.00% 1,131.73 269.46 100.00% - - 0.00% - - 0.00%
02.03.01.01 TRIPLAY LAPUMA 4mmX4'X8' pln 9.24 25.42 234.88 - - 0.00% 234.88 9.24 100.00% - - 0.00% - - 0.00%
02.03.02 CALAMINA DE ZINC 1800X830X0.03mm pln 24.00 28.00 672.00 672.00 24.00 100.00% - - 0.00% - - 0.00% - - 0.00%
02.03.02.01 MALLA 8X10/DIAM 2.7MM.(GALV+PVC) m2 4,129.78 45.00 185,839.92 46,460.25 1,032.45 25.00% 139,380.30 3,097.34 75.00% - - 0.00% - - 0.00%
02.03.02.02 EXTINTOR DE POLVO QUIMICO SECO 6 KG und 1.00 150.00 150.00 150.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
02.03.02.03 PINTURA LATEX gln 45.75 21.01 961.21 - - 0.00% - - 0.00% - - 0.00% 961.21 45.75 100.00%
02.04 PINTURA LATEX VENCELATEX VENCEDOR gln 2.13 30.00 63.90 - - 0.00% - - 0.00% - - 0.00% 63.90 2.13 100.00%
02.04.01 PINTURA ESMALTE gln 51.30 23.53 1,207.09 - - 0.00% - - 0.00% - - 0.00% 1,207.09 51.30 100.00%
ALQUILER DE EQUIPO P/DICTADO DE CURSO(DATA-ECRAM-COMPUTADORA-MICROFONO-EQ.
02.04.01.01 glb 2.00 500.00 1,000.00 100.00 0.20 10.00% 300.00 0.60 30.00% 300.00 0.60 30.00% 300.00 0.60 30.00%
SONIDO)
02.04.01.02 TUBO DE F°G° CIRCULAR DE 2" X 2Mm X 6m m 141.90 13.50 1,915.65 - - 0.00% 957.83 70.95 50.00% 957.83 70.95 50.00% - - 0.00%
02.04.01.03 MOVILIZACIÓN Y DESMOVILIZACIÓN DE HERRAMIENTAS glb 1.00 5,000.00 5,000.00 1,500.00 0.30 30.00% 2,000.00 0.40 40.00% 1,500.00 0.30 30.00% - - 0.00%
02.04.01.04 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 4,500.00 4,500.00 1,125.00 0.25 25.00% 1,125.00 0.25 25.00% 1,125.00 0.25 25.00% 1,125.00 0.25 25.00%
21
CALENDARIO DE UTILIZACION DE EQUIPO
"MEJORAMIENTO DE LOS SERVICIOS CULTURALES PARA LA PARTICIPACIÓN DE LA POBLACIÓN EN LAS INDUSTRIAS CULTURALES Y LAS ARTES EN LA LOCALIDAD DE RACCAYA, DEL DISTRITO DE CANARIA DE LA PROVINCIA DE VICTOR FAJARDO DEL
PROY
DEPARTEMENTO DE AYACUCHO"
DEL 08 DE ENE. AL 31 DE ENE. 2024 DEL 01 DE FEB. AL 29 DE FEB. 2024 DEL 01 DE MARZ. AL 31 DE MARZ. 2024 DEL 01 DE ABR. AL 06 DE ABR. 2024
PREC. PRESUPUE 24 DIAS 29 DIAS 29 DIAS 06 DIAS
DESCRIPCION UNDMETRADO
UNIT. S/. STO S/.
PORCENTAJE PORCENTAJE PORCENTAJE PORCENTAJE
COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO COSTO S/. METRADO
(%) (%) (%) (%)
HERRAMIENTAS MANUALES %MO 5,361.30 5,361.30 - 100.00% - - 0.00% - - 0.00% - - 0.00%
BOTAS DE JEBE und 15.00 45.00 675.00 337.50 7.50 50.00% 337.50 7.50 50.00% - - 0.00% - - 0.00%
MASCARA RESPIRADOR CONTRA POLVO und 30.00 15.00 450.00 225.00 15.00 50.00% 225.00 15.00 50.00% - - 0.00% - - 0.00%
BOTIN DE CUERO CON PUNTA DE ACERO und 30.00 45.00 1,350.00 1,350.00 30.00 100.00% - - 0.00% - - 0.00% - - 0.00%
ARNES DE SEGURIDAD und 1.25 169.49 211.78 - - 0.00% 211.86 1.25 100.00% - - 0.00% - - 0.00%
GUANTES DE JEBE pza 30.00 15.00 450.00 135.00 9.00 30.00% 225.00 15.00 50.00% 90.00 6.00 20.00% - - 0.00%
GUANTES DE CUERO PAR 30.00 14.90 447.00 223.50 15.00 50.00% 223.50 15.00 50.00% - - 0.00% - - 0.00%
CASCOS DE SEGURIDAD pza 15.00 9.90 148.50 148.50 15.00 100.00% - - 0.00% - - 0.00% - - 0.00%
TAPON DE OIDO pza 30.00 8.00 240.00 240.00 30.00 100.00% - - 0.00% - - 0.00% - - 0.00%
LENTES DE PROTECCION pza 30.00 10.90 327.00 327.00 30.00 100.00% - - 0.00% - - 0.00% - - 0.00%
SOLDADORA ELECT. MONOF. ALTERNA 225 AMP. hm 1.03 11.00 11.35 - - 0.00% 5.72 0.52 50.00% 5.72 0.52 50.00% - - 0.00%
VOLQUETE DE 15 M3 hm 45.32 150.00 6,798.48 679.50 4.53 10.00% 3,399.00 22.66 50.00% 2,719.50 18.13 40.00% - - 0.00%
CARTELES DE SEÑALALIZACION DESEGURIDAD INC. INSTALACION glb 1.00 900.00 900.00 900.00 1.00 100.00% - - 0.00% - - 0.00% - - 0.00%
PASAMANOS DE MADERA NACIONAL 2"X3"PROVISIONALES glb 1.00 1,000.00 1,000.00 - - 0.00% - - 0.00% - - 0.00% 1,000.00 1.00 100.00%
PASE PEATONAL DE MADERA NACIONAL 1"X8'X10"PROVISIONALES glb 1.00 1,000.00 1,000.00 100.00 0.10 10.00% 400.00 0.40 40.00% 400.00 0.40 40.00% 100.00 0.10 10.00%
CARGADOR S/LLANTAS 110-125 HP hm 176.39 180.00 31,750.99 3,175.20 17.64 10.00% 15,876.00 88.20 50.00% 12,700.80 70.56 40.00% - - 0.00%
CIZALLA P/CORTE DE FIERRO hm 14.53 1.00 14.53 14.53 14.53 100.00% - - 0.00% - - 0.00% - - 0.00%
COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 22.26 10.25 228.16 22.86 2.23 10.00% 91.23 8.90 40.00% 91.23 8.90 40.00% 22.86 2.23 10.00%
VIBRADOR DE CONCRETO 4 HP 1.35" hm 5.99 8.00 47.92 4.80 0.60 10.00% 19.20 2.40 40.00% 19.20 2.40 40.00% 4.80 0.60 10.00%
VIBRADOR DE CONCRETO 4 HP 2.40" hm 79.85 12.00 958.17 95.88 7.99 10.00% 383.28 31.94 40.00% 383.28 31.94 40.00% 95.88 7.99 10.00%
MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 91.83 12.00 1,101.94 110.16 9.18 10.00% 440.76 36.73 40.00% 440.76 36.73 40.00% 110.16 9.18 10.00%
NIVEL TOPOGRAFICO hm 33.09 9.00 297.79 59.58 6.62 20.00% 119.16 13.24 40.00% 119.16 13.24 40.00% - - 0.00%
TEODOLITO hm 49.63 8.40 416.91 83.41 9.93 20.00% 166.74 19.85 40.00% 166.74 19.85 40.00% - - 0.00%
PAG. 23
RESUMEN DE VALORIZACIÓN N° 01 DE ADICIONAL, DEDUCTIVO Y MAYORES METRADOS N° 01
NOVIEMBRE - 2022
OBRA "RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR HUAYRACCASA
DISTRITO DE VILCASHUAMAN, PROVINCIA VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
PROCESO SELEC. : LICITACION PUBLCA N° 001-2022-MDV/CS-1
CONTRATO OBRA : N° 001 - 2022 - MDV/GM.
FECHA PPTO. BASE : NOVIEMBRE - 2022
PPTO. CONTRATO #REF!
CONTRATISTA : CONSORCIO RIEGO VISCHONGO
SUPERVISIÓN : CONSORCIO TITANKA
Adelant Porcenta
Monto Monto
VAL. o je
MES Valorizad Amortiz Saldo
N° otorgad Amortiza
o ado
o cion
01 SETIEMBRE 2022 0.00 0.00 ### ### 0.000%
02 OCTUBRE 2022 0.00 0.00 ### 0.000%
03 NOVIEMBRE 2022 #REF! #REF! #REF! #REF!
04 DICIEMBRE 2022 0.00 0.00
05 ENERO 2023 0.00 0.00
06 FEBRERO 2023 0.00 0.00
SUB TOTA #REF! #REF! #REF!
IGV (18%) #REF! #REF!
TOTAL #REF! #REF!
CONTROL DE AMORTIZACIÓN DEL ADELANTO DE MATERIALES NOVIEMBRE 2022
(ADICIONAL, DEDUCTIVO Y MAYORES METRADOS N° 01-2022)
"RENOVACION DE PUENTE EN EL (LA) CAMINO VECINAL
OBRA HUAYRACCASA - VILCASHUAMAN (L=8M) SECTOR
HUAYRACCASA DISTRITO DE VILCASHUAMAN, PROVINCIA
VILCASHUAMAN, DEPARTAMENTO DE AYACUCHO"
PROCESO SELEC. : LICITACION PUBLCA N° 001-2022-MDV/CS-1
CONTRATO OBRA : N° 001 - 2022 - MDV/GM.
FECHA PPTO. BASE : NOVIEMBRE - 2022
PPTO. CONTRATO ###
CONTRATISTA : CONSORCIO RIEGO VISCHONGO
SUPERVISIÓN : CONSORCIO TITANKA
MONTO DE ADELANTO DE MATERIALES (C/IGV) ###
MONTO DE ADELANTO DE MATERIALES (S/IGV) ###
FECHA DE ADELANTO DE MATERIALES :
Adelant Porcentaj
Monto
VAL. Monto o e
MES Amortizad Saldo
N° Valorizado otorgad Amortizac
o
01 SETIEMBRE 2022 0.00 0.00 o
### ### ion
0.000%
02 OCTUBRE 2022
03 NOVIEMBRE 2022 #REF! #REF! #REF! #REF!
04 DICIEMBRE 2022
05 ENERO 2023