Area de Estudo DWG V3 - 1 - Views
Area de Estudo DWG V3 - 1 - Views
3280.84
3116.80
2952.76
2788.71
Elevação
2624.67
2460.63
2296.59
2132.55
1968.50
1804.46
1640.42
-2+0.00
-1+0.00 0+0.00 1+0.00 2+0.00 3+0.00 4+0.00 5+0.00 6+0.00 7+0.00 8+0.00 9+0.00 10+0.00 11+0.00 12+0.00 13+0.00 14+0.00 15+0.00 16+0.00 17+0.00 18+0.00 19+0.00 20+0.00 21+0.00
Estaçao
ALINHAMENTO 1
3280.84
3116.80
2952.76
Elevação
2624.67
2460.63
2296.59
2132.55
1968.50
1804.46
1640.42
-1+0.00 0+0.00 1+0.00 2+0.00 3+0.00 4+0.00 5+0.00 6+0.00 7+0.00 8+0.00 9+0.00 10+0.00 11+0.00 12+0.00 13+0.00 14+0.00 15+0.00 16+0.00 17+0.00 18+0.00 19+0.00 20+0.00 21+0.00 22+0.00
Estaçao
Projecto de Construção de
ALINHAMENTO 1
Uma Rodovia
ALINHAMENTO 2
Proprietário: UNIVERSIDADE LURIO
Local: FACULDADE DE ENGENHARIA-PEMBA
- Sede da localidade: MARINGANHA
- Distrito: PEMBA
ESPECIALIDADE / SPECIALITY:
VIAS DE COMUNICAÇAO II
GSPublisherVersion 0.6.100.100
78
.00
149
77+0
+ 0.0
7.6 3
76+1
ST
2. 75
0
.00 4 8 +1
1
ST
76+0
148
+0.
.00
00
75+0
147
74+
+0.
0.00
00
.49
73+8
73+
CS
+6 .46
0.00
146
146
CS
+0.
00
72+
0.00
145
71+
+0.
0.0
00
0
17º
70+
Δ=11º
Δ=
144
0.0
0
+0.
00
69+
0. 0
Projecto de Construção de
0
Uma Rodovia
143
Proprietário: UNIVERSIDADE LURIO
68+
+0.0
0.0
0
0
- Sede da localidade: MARINGANHA
- Distrito: PEMBA
67
+0
.00
0
+0.0
NOTA: TODAS AS DIMENSÕES DEVEM SER
RIGOROSAMENTE VERIFICADAS NA OBRA E
.64
142
+9 COFIRMADAS POR ESCRITO PELO
66
66
8. 51
+0
0
65
0.0
+0
DESENHOS / DRAWINGS:
.00
141+
IMPLANTAÇAO CURVAS HORIZONTAIS
64
ESPECIALIDADE / SPECIALITY:
+0
.00
VIAS DE COMUNICAÇAO II
0 0. 0
760 m
Desenhado por: Data
63
.50
140+
+0
+0
63 Anli Alide 22/05/2024
.00
TS
Verificado por:
2
12.2
62
Data
139+
+0
TS
.00
0 0.0
Escala de desenho/Drawing Scale
139+
IMPLANTAÇAO DA CURVA 1 1:300
1:200
0. IMPLANTAÇAO DA CURVA 2 1:200
Revision
GSPublisherVersion 0.6.100.100
PIV 144+00,00m
PTV 153+4,38m
PTV 216+3,125m
PCV 86 +11,88m
PIV 48+0,00m
14+20.00 14+40.00 14+60.00 14+80.00 15+00.00 15+20.00 15+40.00 15+60.00 15
14+75.16 14+88.16
9,56%
PCV 2+10,63m
13.28%
20.73%
%
24.11
0. CURVA 3-CONVEXA
CURVA 1-CONVEXA
PTV 161+12,98m
PIV 135+7,18m
Projecto de Construção de
Uma Rodovia
PCV 104+12,83m
ESPECIALIDADE / SPECIALITY:
VIAS DE COMUNICAÇAO II
GSPublisherVersion 0.6.100.100
DIAGRAMA DE MASSAS
-3 1 5 0 0
-3 2 0 0 0
01 3
PONTOS DMT (m) Volume m
-3 2 5 0 0
02
-3 3 0 0 0
01 874,64 4681.28
-3 3 5 0 0
02 637,59 2819.30
03
-3 4 0 0 0
03
304,88 951.98
-3 4 5 0 0
04
04 251,72 951.98
-3 5 0 0 0
-3 5 5 0 0
05 214,04 273.32
-3 6 0 0 0
06 205,62 273.32
-3 6 5 0 0
07 142,89 432.98
-3 7 0 0 0
-3 7 5 0 0 08 97,30 278.8
-3 8 0 0 0
09 63,37 39.12
V O LU M E (m )
-3 8 5 0 0
10 48,15 72.3
-3 9 0 0 0
-3 9 5 0 0
05 06
Projecto de Construção de
07
Uma Rodovia
-4 0 0 0 0
Proprietário: UNIVERSIDADE LURIO
-4 0 5 0 0
EIXO 1 Local: FACULDADE DE ENGENHARIA-PEMBA
- Sede da localidade: MARINGANHA
Descri çao Volume m 3 Volume m 3
- Distrito: PEMBA
-4 1 0 0 0 (geometrico) (empolado 25%)
Corte Normal: 67529.43 NOTA: TODAS AS DIMENSÕES DEVEM SER
-4 1 5 0 0
Aterro Normal: 8257.937 10322.421 RIGOROSAMENTE VERIFICADAS NA OBRA E
COFIRMADAS POR ESCRITO PELO
Camada Final de Terraplenagem: 81189.034 101486.292
08 PROJECTÍSTA OU FISCAL, ANTES DA EXECUÇÃO DOS
TRABALHOS. ESTE DESENHO É PROPRIEDADE DO
-4 2 0 0 0
-4 3 0 0 0
Base 18739.215 DIAGRAMA DE MASSAS (BUCKNER)
ESPECIALIDADE / SPECIALITY:
-4 3 5 0 0
10 VIAS DE COMUNICAÇAO II
-4 4 0 0 0
GSPublisherVersion 0.6.100.100