TEST REPORT FOR REB670 RELAY
DOC. No. : Sale Order No : DATE : CLIENT: M/s. ESIDS Chennai PROJECT: 220/132KV SUBSTATION CUSTOMER STATION NAME FEEDER NAME PROTECTION : ESIDS : 220/132KV SUBSTATION : BUS BAR FEEDER : REB670 BUS BAR PROTECTION REALY. Sheet No 1 of 3
GENERAL INFORMATION AND DATA Protection Relay data Make Auxiliary supply Software version of relay Drawing reference Main C.T. ratio Settings Location of CT core BAY 201 BAY 202 BAY 203 BUS: ZONE-A STABILITY TEST BAY 201& BAY 203 SL.NO 1 2 3 INJECTED PHASE R-N Y-N B-N INJECTED CURRENT BAY 201(A) 1A,0 1A,240 1A,120 INJECTED CURRENT BAY 203(A) 1A, 180 1A, 60 1A,300 I diff current(A) 0 0 0 STABILITY STABLE STABLE STABLE ABB 220V DC V1.1 Rev 01 Type Rating Location of relay Serial No of Relay REB 670 In=1A, Un=220V, 50Hz BB
Ratio 800/1 800/1 800/1
ZONE CONNECTION FIEXED TOZA FIXED TO ZA FIXED TO ZA
BAY 202 & BAY 203 SL.NO 1 2 3 INJECTED PHASE R-N Y-N B-N INJECTED CURRENT BAY 202(A) 1A,0 1A,240 1A,120 INJECTED CURRENT BAY 203(A) 1A, 180 1A, 60 1A,300 I diff current(A) 0 0 0 STABILITY STABLE STABLE STABLE
Test by: Name : Mr. Designation. : Testing Engr. Signature & Date
Witnessed by: Name: Designation: Signature & Date ESIDS CHENNAI CREATED FORMAT
TEST REPORT FOR REB670 RELAY
DOC. No. : Sale Order No : DATE : CLIENT: M/s. ESIDS Chennai PROJECT: 220/132KV SUBSTATION PICK UP CURRENT TEST: SET CURRENT: 800A SL.NO 1 2 3 LBB TEST: BAY 201 Set current=20%Ibase I base = 800 Set time: Retrip = OFF Set time: LBB trip=200 ms BAY NO BAY 201 BAY 202 BAY 203 PICK UP CURRENT(A) DROP CURRENT(A) PICK UP CURRENT(A) DROP CURRENT(A) PICK UP CURRENT(A) DROP CURRENT(A) MAIN 01 800.21A 798.56A 800.31A 798.42A 799.92A 797.95A Sheet No 2 of 3
Sl. No. 1 2 3
Phase R-N Y-N B-N
Injected current(mA) 203 204 203
Retrip time (ms ) OFF OFF OFF
LBB trip time(ms) 224 198 219
BAY 202 Set current=20%Ibase I base = 800 Set time: Retrip = OFF Set time: LBB trip=200 ms Sl. No. 1 2 3 Test by: Name : Mr. Designation. : Testing Engr. Signature & Date Phase R-N Y-N B-N Injected current(mA) 204 203 203 Retrip time (ms ) OFF OFF OFF Witnessed by: Name: Designation: Signature & Date ESIDS CHENNAI CREATED FORMAT LBB trip time(ms) 226 217 221
TEST REPORT FOR REB670 RELAY
DOC. No. : Sale Order No : DATE : CLIENT: M/s. ESIDS Chennai PROJECT: 220/132KV SUBSTATION BAY 203 Set current=5%Ibase I base = 335 Set time: Retrip = OFF Set time: LBB trip=200 ms Sl. No 1 2 3 Phase R-N Y-N B-N Injected current(mA) 22.0 22.0 22.0 Retrip time (ms ) OFF OFF OFF LBB trip time(ms) 228 221 224 Sheet No 3 of 3
Check of LED Check of Trip Relays Check of Signal Output Relays Check of Binary Inputs Alarm and Trip Functions
Checked OK. Checked OK. Checked OK. Checked OK. Checked OK.
Remarks
Relay Tested and found working satisfactorily.
Test by: Name : Mr. Designation. : Testing Engr. Signature & Date
Witnessed by: Name: Designation: Signature & Date ESIDS CHENNAI CREATED FORMAT