Eca Kosong

The document appears to be an elemental cost analysis for a religious building project. It includes sections on project details, design and construction information, a summary of element costs, and specifications for various elements of the building. The total tendered sum and gross floor area of 427 square meters are provided.

Uploaded by

WN MH
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
665 views3 pages

Eca Kosong

The document appears to be an elemental cost analysis for a religious building project. It includes sections on project details, design and construction information, a summary of element costs, and specifications for various elements of the building. The total tendered sum and gross floor area of 427 square meters are provided.

Uploaded by

WN MH
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

INSTITUTION OF SURVEYORS, MALAYSIA BUILDING COST INFORMATION CENTRE

6-Religious Buildings A - 1 - 427 CLIENT :

ELEMENTAL COST ANALYSIS - Form 1 JOB TITLE :

LOCATION : INFORMATION ON TOTAL PROJECT Project and Contract Information Project Details and Site Conditions : Contract :

TENDER DATE :

Market Conditions : Contract Particulars : Cost Fluctuation : Type of Contract : NO Basis of Tender Bills Of Quantities Bills Of Appr. Quant. Sched. Of Rates / Spec. & Drsings Contract Period Stip. by Client : Contract Period Offered by Builders : Number of Tenders Issued : Number of Tenders Received : ANALYSIS OF SINGLE BUILDING Design/Shape Information Accommodation and Design Features ; One storey indoor court with Gross Floor Area is 432.00 m2 Areas : Lower Ground Floor Ground Floor Upper Floor GROSS FLOOR AREA Usable Area Circulation Area Ancillary Area Internal Division GROSS FLOOR AREA Floor Space NOT Enclosed : ROOF AREA (Structural & Plant Room) m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m
2

Competitive Tender List YES RM Int/JV/L

Open/Selected Competition Negotiated

Government Private

Serial months months

Provisional Sum Prime Cost Sum Preliminaries Contingencies Contract Sum

RM RM RM RM RM

Functional Unit :

Design/Shape : Percentage of Gross Floor Area :

External Wall Area : Gross Floor Area :

a) Below Grd. Floor b) Single Storey = Construction c) Two storey Construction

Storey Heights : Av. Below Grd. Floor At. Grd. Floor Above Grd. Floor

m m m

d) 3-storey Construction e) 4-storey Construction

Brief Cost Information Contract Sum Provisional Sum Prime Cost Sum Preliminaries Contingencies Contract Sum (less Contigencies) RM RM RM RM RM RM Functional Unit Cost Excluding External Works: of remainder Contract Sum

INSTITUTION OF SURVEYORS, MALAYSIA BUILDING COST INFORMATION CENTRE ELEMENTAL COST ANALYSIS - Form 2

6-Religious Building A - 1 - 427 SUMMARY OF ELEMENT COSTS

GROSS FLOOR AREA :

427.00 Total Cost Of Element RM Cost per m GFA RM


2

TENDER DATE

May-08 Reinforcement kg Formwork m


2

Preliminaries Shown Separately Element Unit Quanitity Element Unit Rate RM Element Ratio per m GFA
2

Reinforced Concrete m
3

1 Substructure 1A Piling 1B Work Below Lowest Floor Finish Group Element Total 2 Superstructure 2A Frame 2B Upper Floors 2C Roof 2D Stairs & Handrail 2E External Wall 2F Windows & External Door 2G Internal Walls & Partitions 2H Internal Door Group Element Total 3 Finishes 3A Internal Wall Finishes 3B Internal Floor Finishes 3C Internal Ceiling Finishes 3D External Finishes Group Element Total 4 Fittings and Furnishings 5 Services 5A Sanitary Appliances 5B Plumbing Installation Air-Conditioning & Vent. 5C System 5D Electrical Installation 5E Fire Protection Installation 5F Lift & Conveyor Installation 5G Communication Installation 5H Special Installation Builder's Profit & 5J Attendance on Services Builder's Work in Connection 5K with Services Group Element Total Sub-total exc. External Works Preliminaries & Contingencies 6 External Works 6A Site Clearance 6B Turfing

P.C SUM

TENDERED SUM

Group Element Total Preliminaries TOTAL (less Contingencies)

INSTITUTION OF SURVEYORS, MALAYSIA BUILDING COST INFORMATION CENTRE


ELEMENTAL COST ANALYSIS - Form 3 GROSS FLOOR AREA : ELEMENT 1. Substructure 1A 1B Piling Work Below Lowest Floor Finish 6-Religious Building A-1-427 TENDER DATE : SPECIFICATION

250mm x 250mm precast reinforced concrete pile Grade 45 as initial piles and extension piles Vibrated reinforced concrete 'Grade 30'(as for pile cap, column stump, ground beam, floor slab Mild steel reinforcement in stump and beam High tensile reinforcement in pile cap, stump, beam, and apron slab

2. Superstructure 2A Frame Vibrated reinforced concrete Grade 30(20mm aggregate as column, stiffener, and roof beam Mild steel rod reinforcement in column,stiffener and roof beam High tensile rod reinforcement in column, stiffener and roof beam Zinc coated galvanised steel roof truss to receive interlocking concrete tile roof covering Half brickwall (115mm thk) common bricks reinforced with and including a layer of exmet Top hung casement window(Type H1),composite window (Type W1 & W2).natural anodised aluminium frame windows and fixed glass panel.Clear sheet glass and tinted sheet glass Half brickwall (115mmthk) in common bricks reinforced with and including a layer of Exmet Skeleton framend flush door, plywood flush door, glass sliding door and fixed panels pre-fabricated PVC flush door

2B 2E 2F 2G 2H

Roof External Walls Windows & External Door Internal Walls & Partitions Internal Door

3. Finishes 3A 3B Internal Wall Finishes Internal Floor Finishes 2100mm high 200mm x 250mm x 6mm thick glazed ceramic tiles to toilet Plaster and paint to wall with emulsion paint 25mm thick carpet 250mm x 250mm x 8mm thick non slip homognous tile 200mm x 200mm x 8mm thick non slip homogenous tiles to toilet 4.5mm thick flat sheet ceiling lining 12mm thick gypsum ceiling board Floor : Cement render to apron and floor Wall : Plaster and paint with weathershield paint Ceiling : Plaster and paint and metal sheet ceiling

3C 3D

Internal Ceiling Finishes External Finishes

4. Fittings and Furnishings 5. Services 5A 5B 5C 5D 5E 5F 5G 5H 5J 5K 5L Sanitary Appliances Squatting water closet, wall hung wash hand basin, counter top vanity wash hand basin, wall hung urinal, soap holder, bip tap, stainless steel shower head, stainless steel floor trap, glass mirror

Plumbing Installation Cold water services ans sanitary plumbing. Refuse disposal Not applicable Not applicable Air-Conditioning & Ventilation Electrical Installation Complete electrical services Fire Protection Installation Not applicable Lift & Conveyor Installation Not applicable Communication Installation Not applicable Special installation Not applicable Builder's profit & Attendance on Services applicable Not Builder'swork in connection with W.c stooling, counter top, water tank support, ablution stooling services 6. External Works Site Clearance turfing

6A 6B

Site clearence 300mm x 300mm turves to sloping surface with and including 50mm layer of approved vegetable soil,traeting with fertilizer and tending,watering,and weeding