82% found this document useful (11 votes)
24K views1 page

Concrete Pour Card Template

The concrete pour card provides details for a concrete pour occurring on a specified date at a worksite. It lists the customer name, project name, location, concrete grade, and reference drawing. It also identifies the approving authority, site engineer, and consultant. The card outlines inspection items to check prior to pouring, during pouring, and after pouring. These include verifying reinforcement, shuttering, concrete quality, vibration, level, and quantity. Space is provided for the site engineer, consultant, and client to sign off on the inspection items.

Uploaded by

Darla Vishwanath
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
82% found this document useful (11 votes)
24K views1 page

Concrete Pour Card Template

The concrete pour card provides details for a concrete pour occurring on a specified date at a worksite. It lists the customer name, project name, location, concrete grade, and reference drawing. It also identifies the approving authority, site engineer, and consultant. The card outlines inspection items to check prior to pouring, during pouring, and after pouring. These include verifying reinforcement, shuttering, concrete quality, vibration, level, and quantity. Space is provided for the site engineer, consultant, and client to sign off on the inspection items.

Uploaded by

Darla Vishwanath
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Cemfis India Pvt Ltd

CONCRETE POUR CARD


DATE ..
CARD NO ..
NAME OF CUSTOMER ............................
NAME OF WORK .....................................
WORKSITE :...............................................
GRADE OF CONCRETE ...........................
LOCATION OF CONCRETING ...........................
REFERENCE DRAWING
APPROVING AUTHORITY

ENGINEER
CONSULTANT
INSPECTION ITEMS PIOR TO CONCRETEING

CLINET

REINFORCEMENT
1) SPACING
2) BAR DIA
3) FREE FORM RUSTING
4) SATISFYING THE DRAWING
SHUTTERING
1) OILED AND READY TO USE
2) POSITIONING
3) MINIMUM COVER
MAINTAINED
4) LEVEL
INSPECTION ITEMS DURING CONCRETEING
TIME OF COMMENCE ______________________
`1) CONCRETE QUALITY
2) TEST CUBE MOULDS READY
3) VIBRATION PROPERLY DONE
4) LEVEL MAINTIAINED
5) CONRETE QUANTITY
TIME OF COMPLETION ______________________
POST CONCRETING INSPECTION
1) SURFACE
2) LEVEL
3) SHUTTERING CLEANING AND
READY FOR USE AGAIN

__________________
SITE ENGINEER

___________________
CONSULTANT

____________________
CLINET