Cemfis India Pvt Ltd
CONCRETE POUR CARD
DATE ..
CARD NO ..
NAME OF CUSTOMER ............................
NAME OF WORK .....................................
WORKSITE :...............................................
GRADE OF CONCRETE ...........................
LOCATION OF CONCRETING ...........................
REFERENCE DRAWING
APPROVING AUTHORITY
ENGINEER
CONSULTANT
INSPECTION ITEMS PIOR TO CONCRETEING
CLINET
REINFORCEMENT
1) SPACING
2) BAR DIA
3) FREE FORM RUSTING
4) SATISFYING THE DRAWING
SHUTTERING
1) OILED AND READY TO USE
2) POSITIONING
3) MINIMUM COVER
MAINTAINED
4) LEVEL
INSPECTION ITEMS DURING CONCRETEING
TIME OF COMMENCE ______________________
`1) CONCRETE QUALITY
2) TEST CUBE MOULDS READY
3) VIBRATION PROPERLY DONE
4) LEVEL MAINTIAINED
5) CONRETE QUANTITY
TIME OF COMPLETION ______________________
POST CONCRETING INSPECTION
1) SURFACE
2) LEVEL
3) SHUTTERING CLEANING AND
READY FOR USE AGAIN
__________________
SITE ENGINEER
___________________
CONSULTANT
____________________
CLINET