Its the goal of this lecture to
to show you the basic content and the rules of the
Production Part Approval Process
and to explain the purpose and the background but this lecture will not save you from learning how to practically use this system
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 2
Dipl.-Ing. Ralf Glner
PPAP
Notes to This Lecture
this lecture was created for training purposes only; it is not an extensive description, but a
help for getting started view of contents, basic idea and goals
The content of this lecture shall not be used as a reference for daily work
Please make sure that you are working only with original latest level documents
Creating this lecture, the valid standards of Dec 2006 were used This lecture does not refer to customer specific requirements, nor to special PPAP rules/requirements for bulk materials, tires, nor truck industry! Standards mentioned in this lecture can be obtained from the institutions listed in section 6. Internet Links
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 3
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
3. 4. 5. 6.
Summary of the Process The Documentation and its Preparation Summary Internet Links
+49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 4
2007 by R.Glner, D-85221 Dachau,
Dipl.-Ing. Ralf Glner
PPAP
1. Introduction
it is the purpose of advanced quality management to prevent that unreliable designs or processes are used in serial production
therefore it is necessary to have one extensive, strict approval process for new or changed designs or processes inevitably this process causes some administration work
but its worth while because it reduces the production of muda!
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 5
Dipl.-Ing. Ralf Glner
PPAP
Saving by taking advantage of the Rule Of The 10: The cost of the remedy of a defect increases tenfold with every step, the project advances!
Early identification of a defect
EXPENSES
...saves the major part of the cost!
PROJECT TIME
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 6
Dipl.-Ing. Ralf Glner
PPAP
Savings by avoiding the 7+1 muda
over production muda in the process
errors
stock
muda
unnecessary unnecessary waiting movement transport time
Design ignoring the customers expectations
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 7
Dipl.-Ing. Ralf Glner
PPAP
Too high stocks...
take space raise assets employed require additional searching require additional administration require additional transport are a risk, because parts might exceed expiration date or become unsaleable are a risk, because parts might be damaged complicate the overview are often a consequence of a weak process cover weak process
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 8
Dipl.-Ing. Ralf Glner
PPAP
Requirement for low stocks...
are controlled and capable processes and Total Productive Maintenance since all kind of process problems will cause delivery stops, if the stocks are low!
lower stocks
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 9
Dipl.-Ing. Ralf Glner
PPAP
Advantages of controlled & capable production processes
satisfied customers by good quality and avoided muda
no scrap, no rework
constant flow of material
low stocks possible
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 10
Dipl.-Ing. Ralf Glner
PPAP
According to QS-9000...
such an extensive and strict process is an obligatory requirement (cp. QS-9000, main section I) the name of this process is
Production Part Approval Process
its explanation is one QS-9000 reference manual
QS-9000
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de
PPAP
PPAP_engl.PPT vom 13.01.2007 Seite 11
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6. General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
PPAP
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 12
Dipl.-Ing. Ralf Glner
PPAP
2.
Content of the QS-9000
General PPAP Process Requirements
PPAP
Introduction Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Customer Notification and Submission Requirements Submission Levels Part Submission Status Record Retention
Manufacturer Specific Requirements
Will not be discussed here! are to be found in internet OEM Homepages or
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 13
Dipl.-Ing. Ralf Glner
PPAP
Appendicies
Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Glossary Completion of the Part Submission Warrant Completion of the Appearance Approval Report PPAP, Dimensional Results PPAP, Material Test Results PPAP, Performance Test Results Bulk Material - Specific Requirements Tires - Specific Requirements Truck Industry - Specific Requirements
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 14
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 15
Dipl.-Ing. Ralf Glner
PPAP
PPAP is, so to speak, the goal of APQP...
APQP makes sure that all requirements are recognized before the Product Development is started that those special characteristics of the product are specified which influence these requirements that it is verified again and again that the planed design can safely meet these requirements, if the special characteristics are within tolerance that only those production processes are specified, which are controlled and capable according to SPC regarding these characteristics A test production and PPAP are used to validate that all processes are under control and capable the produced parts fulfil all requirements
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 16
Dipl.-Ing. Ralf Glner
PPAP
Purpose and Applicability It is the purpose of PPAP to
define generic requirements for production part approval determine if all customer engineering design record and specification requirements are properly understood by the organization determine that the manufacturing process has the potential to produce the product consistently meeting these requirements during an actual production run at the quoted production rate
Applicability (
PPAP, Introduction)
PPAP shall apply to internal and external organization sites supplying production or service parts, production materials or bulk materials.
For bulk material PPAP is not required unless specified by the customer
a supplier of standard catalogue production or service parts shall comply with PPAP unless formally waived by the customer
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 17
Dipl.-Ing. Ralf Glner
PPAP
Submission of PPAP The organization shall obtain full approval from the authorized customer product approval activity for:
1. a new part or product 2. correction of a discrepancy on a previously submitted part 3. product modified by an engineering change to
design records specifications materials
4. any situations required by section 3 Note: If there is any question concerning the need for PPAP, contact the authorized customer representative.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 18
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6. General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
PPAP
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 19
Dipl.-Ing. Ralf Glner
PPAP
(2.) 2. 2.1 2.2
PPAP Process Requirements Significant Production Run PPAP Requirements 2.2.1 2.2.2 2.2.18
Requirements describing the details of documentation to be attached Will be discussed in chapter 4 of this presentation!
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 20
Dipl.-Ing. Ralf Glner
PPAP
(2.)2.1 Significant Production Run
Products for PPAP shall be taken from a significant production run This production run shall be from one hour to eight hours of production, and with the specific production quantity to total a minimum of 300 consecutive parts, unless otherwise specified by the authorized customer representative This significant production run shall be conducted at the production, at the production rate, using the production tooling, production gaging, production process, production materials, and production operators. Parts from each unique production process, e.g. duplicate assembly line and/or work cell, each position of a multiple cavity die, mold, tool or pattern, shall be measured and representative parts tested
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 21
Dipl.-Ing. Ralf Glner
PPAP
(2.)2.2 PPAP Requirements
the supplier shall meet all specified requirements
as listed in this handbook and all customer-specific requirements
Production parts shall meet all customer engineering design record and specification requirements
including safety and regulatory requirements
If any part specification cannot be met, the organization shall document their problem-solving efforts and shall contact the authorized customer representative for concurrence in determination of appropriate corrective action.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 22
Dipl.-Ing. Ralf Glner
PPAP
View over the documentations to be created
(see chapter 4 of this presentation for details)
Warrant
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 23
Dipl.-Ing. Ralf Glner
PPAP
Content of the documentation to be created
1. Design Record 2. Authorized Engineering Change Documents 3. Customer Engineering Approval 4. Design-FMEA 5. Process Flow Diagram(s) 6. Process-FMEA 7. Control Plan 8. Measurement System Analysis Studies 9. Dimensional Results 10. Records of Material/ Performance Test Results 11. Initial Process Studies 12. Qualified Laboratory Documentation 13. Appearance Approval Report 14. Sample Production Parts 15. Master Sample 16. Checking Aids 17. Customer-Specific Requirements 18. Part Submission Warrant
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 24
Dipl.-Ing. Ralf Glner
PPAP
Paperwork or EDP?
PPAP?
all forms mentioned in this document may be replaced by identical computer generated forms these documents have to be approved by the customer product approval activity before first submission at Adare Carwin a floppy with all forms can be obtained
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 25
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6. General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
PPAP
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 26
Dipl.-Ing. Ralf Glner
PPAP
2.3. Customer Notification and Submission Requirements( PPAP, Section 3)
1. Customer Notification
The organization shall notify the authorized customer representative of any planned changes to the design, process or site. Examples are indicated in Table 3.1
Notification of all changes to desing nad process is the the organizations resonsibility.
Upon notification and approval of the proposed change by the authorized customer representative, and after change implementation, PPAP submission is required unless otherwise specified
2. Submission to Customer
The organization shall submit for PPAP approval prior to the first production shipment in the following situations (see Table I.3.2) unless the authorized customer representative has waived this requirement. The organization shall review and update all applicable items in the PPAP file to reflect the production process,
regardless of whether or not the customer requests a formal submission.
The PPAP file shall contain the name of the authorized customer representative granting the waiver and the date.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 27
Dipl.-Ing. Ralf Glner
PPAP
Table 3.1: Customer Notification Required
1. 2. 3. 4. 5. use of other construction or material than was used in the previously approved part or product production from new or modified tools (except perishable tools), dies, molds, patterns, etc., including additional or replacement tooling production following refurbishment or rearrangement of existing tooling or equipment production from tooling and equipment transferred to a different plant location or from a additional plant location. change of subcontractor for parts, non-equivalent materials or services (e.g.: heat-treating, plating) that affect customer fit, form, function, durability, or performance requirements product produced after tooling has been inactive for volume production for twelve months or more product and process changes that impact fit, form, function, performance, and/or durability of the salable product
+49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 28
6. 7.
2007 by R.Glner, D-85221 Dachau,
Dipl.-Ing. Ralf Glner
PPAP
Table 3.2: Submission to Customer
1. 2. 3. 4. a new part or product (i.e.: a specific part, material, or color not previously supplied to this specific customer) correction of a discrepancy on a previously submitted part engineering changes to design records, specifications, or materials for production product/part number(s) bulk material only: process technology new to the supplier, not previously used for this product
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 29
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6. General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
PPAP
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 30
Dipl.-Ing. Ralf Glner
PPAP
2.4. Submission Levels Note:
The content of the documentation to be generated is always the same! The supplier has to retain everything (e.g.. as a copy)! the Submission Level just indicates what has to be submitted to the customer!
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 31
Dipl.-Ing. Ralf Glner
PPAP
There are five Submission Levels:
1. warrant only (and if applicable an Appearance Approval Report) 2. warrant with product samples and limited supporting data 3. warrant with product samples and complete supporting data 4. warrant with other requirements as defined by the customer 5. warrant with product samples and complete supporting data available for review at the organizations manufacturing location
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 32
Dipl.-Ing. Ralf Glner
PPAP
The customer decides about the submission level
I want I need I wish
...looking at:
the status of the supplier (Ford Q1, ...) his experience with earlier approval processes the know-how of the supplier concerning this product the importance of the part so the submission level might be different for every product
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 33
Dipl.-Ing. Ralf Glner
PPAP
S = submit
retain a copy at an appropriate location, (including manufacturing)
R = retain at appropriate locations
(including manufacturing)
has to be made readily available to the customer representative upon request
* = retain at appropriate locations
submit upon request
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 34
Dipl.-Ing. Ralf Glner
PPAP
LEVEL 3 IS THE STANDARD LEVEL"
IT SHALL BE USED FOR ALL SUBMISSIONS UNLESS SPECIFIED OTHERWISE BY THE RESPONSIPLE CUSTOMER PRODUCT APPROVAL ACTIVITY Level 1 = just warrant and (if applicable) Appearance Approval Report Level 2 = standard minus process description and background information Level 3 = standard Level 4 = warrant, other requirements as defined by the customer Level 5 = the complete list, and everything will be checked at the suppliers site!
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 35
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Requirements Customer Notification and Submission Requirements Submission Levels Part Submission Status Record Retention
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 36
Dipl.-Ing. Ralf Glner
PPAP
After everything is ready, it will be submitted to the customer!
namely at the responsible product approval activity the customer will inspect everything and notify the organization of the result using the Part Submission Status
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 37
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Status
ORGANIZATIONS MAY NEVER SHIP PRODUCTION QUANTITIES BEFORE CUSTOMER APPROVAL!
Upon approval of the submission, the organization shall assure that future production continues to meet all customer requirements For those organizations that have been classified as self-certifying by a specific customer (PPAP Submission Level 1), submission of the required organization-approved documentation will be considered as customer approval unless the organization is advised otherwise.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 38
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Status:
A
Approved
B
Interim Approval
C
Rejected
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 39
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Status A = Approved
indicates that the part or material meets all customer specifications and requirements the organization therefore is authorized to ship production quantities of the product subject to releases from the customer scheduling activity
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 40
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Status B = Interim Approval
Permits shipment of material for production requirements on a limited time or piece quantity basis. Interim Approval will only be granted when the organization has:
clearly defined the non-compliances preventing approval; and, prepared an interim approval action plan agreed upon by the customer
The organization is responsible for implementing containment actions to ensure that only acceptable material is beeing shipped to the customer. PPAP re-submission is required to obtain a status of Approved material covered by an interim approval that fails to meet the agreed-upon action plan either by the expiration date or the shipment of the authorized quantity will be rejected. No additional shipments are authorized unless an extention of the interim approval is granted.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 41
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Status C = Rejected
Means that the PPAP submission does not meet the customer requirements, based on
the production lot from which it was taken, and/or accompanying documentation
In such cases, the submission and/or process (as appropriate) shall be corrected to meet the customer requirements. The submission shall be approved before production quantities may be shipped.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 42
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6. General PPAP Process Requirements Customer Notification and Submission Requirements Submission to Customer - Levels of Evidence Part Submission Status Record Retention
PPAP
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 43
Dipl.-Ing. Ralf Glner
PPAP
Record Retention and Sampling
PPAP records, regardless of submission level, shall be maintained for the length of the time the part is active (in production or service) plus one calendar year the supplier shall ensure that the appropriate PPAP records from a superseded part PPAP file are included, or referenced in the new part PPAP file
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 44
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Requirements Customer Notification and Submission Requirements Submission Levels Part Submission Status Record Retention
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 45
Dipl.-Ing. Ralf Glner
PPAP
3. Summary of the Process
before delivering new or changed parts or changing the production processes the supplier has to document that he has successfully finalized all activities of to ensure
that the product will meet all requirements that the processes are under control and capable These activities are mostly described in QS 9000 APQP
the documentation consist of the Part Submission Certificate and the required attachments according to his Submission Level the supplier has to submit everything or just parts of it to the customer the customer checks the documentation and sets the Part Submission Status depending on that the supplier can start delivery or not
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 46
Dipl.-Ing. Ralf Glner
PPAP
Teamwork: How to judge about PPAP?
Task: Assume you have received a PPAP Submission Level 3 from your supplier. Supplier has design responsibility. How to make sure whether or not the supplier worked carefully?
but without leaving your desk!
Time frame:
Preparation 15 min.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 47
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Requirements Customer Notification and Submission Requirements Submission Levels Part Submission Status Record Retention
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 48
Dipl.-Ing. Ralf Glner
PPAP
4. The Documentation and its Preparation
Warrant
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 49
Dipl.-Ing. Ralf Glner
PPAP
Only English report forms have to be filled out and submitted to the customer!
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 50
Dipl.-Ing. Ralf Glner
PPAP
Content of the documentation to be created
1. Design Record 2. Authorized Engineering Change Documents 3. Customer Engineering Approval 4. Design-FMEA 5. Process Flow Diagram(s) 6. Process-FMEA 7. Control Plan 8. Measurement System Analysis Studies 9. Dimensional Results 10. Records of Material/ Performance Test Results 11. Initial Process Studies 12. Qualified Laboratory Documentation 13. Appearance Approval Report 14. Sample Production Parts 15. Master Sample 16. Checking Aids 17. Customer-Specific Requirements 18. Part Submission Warrant
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 51
Dipl.-Ing. Ralf Glner
PPAP
4.1 Design Records
all design records for the saleable product e.g.
CAD/CAM Data part drawings specifications
including component drawings For parts identified as black box the design record specifies the interface and performance requirements The organization shall provide evidence that the Material/Substance Composition reporting has been completed and that reported data complies with all requirements
Reporting and requirements as prescribed by the customer Reporting may be entered into International Materials Data System (IMDS), www.mdsystem.com/index.jsp
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 52
Dipl.-Ing. Ralf Glner
PPAP
4.1 Design Records /
Where applicable, the Organization shall identify polymeric parts with the ISO symbols
for plastics: 100g, see ISO 11469 / 1043-1 for elastomers: 100g, see ISO 11469 /1629
4.2 Authorized Engineering Change Documents
all authorized engineering change documents, which are not yet recorded in the design record but incorporated in the product, part or tooling
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 53
Dipl.-Ing. Ralf Glner
PPAP
4.3 Customer Engineering Approval
where specified by the customer, the organization shall have evidence of customer engineering approval
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 54
Dipl.-Ing. Ralf Glner
PPAP
4.4
Design-FMEA
If the supplier is design responsible a Design-FMEA is required according to the customer-specific requirements e.g. QS-9000 FMEA (Potential Failure Mode and Effect Analysis)
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 55
Dipl.-Ing. Ralf Glner
PPAP
4.5 Process Flow Diagrams
see QS-9000
APQP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 56
Dipl.-Ing. Ralf Glner
PPAP
4.6
Process-FMEA
according to the customer-specific requirements e.g. QS-9000 FMEA (Potential Failure Mode and Effect Analysis)
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 57
Dipl.-Ing. Ralf Glner
PPAP
4.7
Control Plan
The Organization shall have control plan that defines all controls used for process control and complies with the customerspecified requirements, e.g. QS-9000 APQP control plans for families of similar parts are acceptable if the new parts have been reviewed for commonality Note: Certain customers require control plan approval e.g. customer signature on the control plan, prior to submission.
QM-Plan according to QS-9000
APQP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 58
Dipl.-Ing. Ralf Glner
PPAP
4.8 Measurement System Analysis Studies
the organization shall have applicable Measurement System Analysis Studies (e.g. Gage R & R) for all new or modified gages, measurement, and test equipment See QS-9000 MSA (Measurement System Analysis reference manual.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 59
Dipl.-Ing. Ralf Glner
PPAP
4.9 Dimensional Results
The organization shall provide evidence that dimensional verifications required by die design record and the Control Plan have been completed and results indicate compliance with specified requirements. The organization shall have dirnensional results for each unique manufacturing process, e.g. cells or production limes and all cavities, molds, patterns or dies The organization shall record, with the actual results: all dimensions (except reference dimensions), characteristics, and specifications as noted an the design record and Control Plan.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 60
Dipl.-Ing. Ralf Glner
PPAP
4.9 Dimensional Results /
The organization shall indicate
the date of the design record, change level, and any authorized engineering change document not yet incorporated in the design record to which the part was made.
The organization shall record
the change level, drawing date, organization name and part number
on all auxiliary documents (e.g. supplementary layout results sheets, sketches, tracings, cross sections, CMM inspection point results, geometric dimensioning and tolerancing sheets, or other auxiliary drawings used in conjunction with the part drawing).
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 61
Dipl.-Ing. Ralf Glner
PPAP
4.9 Dimensional Results /
Copies of these auxiliary materials shall accompany the dimensional results according to the Retention/Submission Requirements Table. A tracing shall be included when an optical comparator is necessary for inspection. The organization shall identify one of the parts measured as the master sample
NOTE 1: The Dimensional Results form in Appendix C, a pictorial, geometrie dimensioning & tolerancing [GD&T] sheets, or a checked print where the results are legibly written on a part drawing including cross sections, tracings, or sketches as applicable may be utilized for this purpose. NOTE 2: Dimensional results typically do not apply to bulk materials.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 62
Dipl.-Ing. Ralf Glner
PPAP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 63
Dipl.-Ing. Ralf Glner
PPAP
4.10 Records of Material/Performance Test Results
The organization shall have records of test results for
material tests performance tests
for tests specified
in the design record in the control plan
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 64
Dipl.-Ing. Ralf Glner
PPAP
4.10.1 Material Test Results
The organization shall perform tests for all parts and product materials when chemical, physical, or metallurgical requirements are specified by the design record or control plan Material test results shall indicate and include:
the design record change level of the parts tested; any authorized engineering change documents that have not yet been incorporated in the design record; the number, date, and change level of the specifications to which the part was tested; the date on which the testing took place; the quantity tested; the actual results; the material suppliers name and, when required by the customer, the customer-assigned supplier/vendor code.
NOTE: Material test results may be presented in any convenient format. An example is shown in Appendix D.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 65
Dipl.-Ing. Ralf Glner
PPAP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 66
Dipl.-Ing. Ralf Glner
PPAP
4.10.1 Material Test Results /
For products with customer-developed material specifications and a customer-approved supplier list, the organization shall procure materials and/or services (e.g., painting, plating, heat-treating, welding) from suppliers on that list.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 67
Dipl.-Ing. Ralf Glner
PPAP
4.10.2 Performance Test Results
The organization shall perform tests for all part(s) or product material(s) when performance or functional requirements are specified by the design record or Control Plan. Performance test results shall indicate and include: die design record change level of the parts tested;
any authorized engineering change documents that have not yet been incorporated in the design record; the number, date, and change level of the specifications to which the part was tested; the date on which the testing took place; the quantity tested; the actual results.
NOTE: Performance test results may be presented in any convenient format. An example is shown in Appendix E.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 68
Dipl.-Ing. Ralf Glner
PPAP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 69
Dipl.-Ing. Ralf Glner
PPAP
4.11
Initial Process Studies
4.11.1 General 4.11.2 Quality Indices 4.11.3 Acceptance Criteria for Initial Study 4.11.4 Unstable Processes 4.11.5 Processes With One-Sided Specifications or Non-Normal Distributions 4.11.6 Actions To Be Taken When Acceptance Criteria Are Not Satisfied
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 70
Dipl.-Ing. Ralf Glner
PPAP
4.11.1 General
the level of initial process capability or performance shall be determined to be acceptable prior to submission for all special characteristics designated by the customer or the organization (sc,cc) the organization shall perform measurement analysis to understand how measurement error is affecting the study measurements (see Measurement System Analysis reference manual) for explanations about Cpk or Ppk see Process Control manual) SPC (Statistical
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 71
Dipl.-Ing. Ralf Glner
PPAP
Turning Point
Mean Value x
Standard Deviation s
Gau Normal Distribution
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 72
Dipl.-Ing. Ralf Glner
PPAP
Definitions Process under Control / Capable Process
not capable capable
2007 by R.Glner, D-85221 Dachau,
under control
+49-8131-53595, www.glaessner.de
not under control
PPAP_engl.PPT vom 13.01.2007
Seite 73
Dipl.-Ing. Ralf Glner
PPAP
Example
Process Capability Index
The Capable Process Cp = Process Capability Index
Shows proportion of the permissible tolerance interval to the scatter Scatter is measured in multiples of the standard deviation s If the scatter is with +/- 3 s within the tolerance, then Cp=1
Comment
No capability High amount of scrap
No capability If centered pretty exact, just about no scrap
Very good capability Statistically no scrap
No capability Not centered Scrap
Cpk = Critical Process Capability Index
Supplementary considers the mean of the process not being equal to the middle of the tolerance interval
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de
Good capability Process is centered enough Little scrap
Example 1 to 3
Process adjusted exactly to center of tolerance interval
PPAP_engl.PPT vom 13.01.2007
Seite 74
Dipl.-Ing. Ralf Glner
PPAP
4.11.2 Quality Indices
Initial process studies shall be summarized with capability or performance indices, if applicable. NOTE 1: The initial process study results are dependent on the purpose of the study, method of data acquisition, sampling, amount of data, demonstration of statistical control. etc. See the QS-9000 Statistical Process Control reference manual for additional information in understanding the basic principles of statistical stability and process measures (indices). For guidance on items listed below, contact the authorized customer representative.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 75
Dipl.-Ing. Ralf Glner
PPAP
Cpk and Ppk
Cpk - The capability Index for a stable process.
The estimate of sigma is based on within subgroup variation . Cpk is an indicator of process capability based on process variation within each subgroup of a set of data. Cpk does not include the effect of process variability between the subgroups. Cpk is an indicator of how good a process could be if all process variation between subgroups was to be eliminated. Therefore, use of Cpk alone may be an incomplete indicator of process performance.
Ppk - The performance index.
The estimate of sigma is based on total variation (all of individual sample data using the standard deviation. Ppk is an indicator of process performance based on process variation throughout the full Set of data. Unlike Cpk, Ppk is not limited to the variation within subgroups. However, Ppk cannot isolate within subgroup variation from between subgroup variation.
When calculated from the same data set, Cpk and Ppk can be compared to analyze the sources of process variation. For more information, see QS-9000 Statistical Process Control.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 76
Dipl.-Ing. Ralf Glner
PPAP
Purpose of Initial Process Studies
The purpose of the initial process study is to understand the process variation, not just to achieve a specific index value. When historical data are available or enough initial data exist to plot a control chart (at least 100 individual sarnples), Cpk can be calculated when the process is stable. Otherwise, for processes with known and predictable special causes and output meeting specifications, Ppk should be used. When not enough data are available (< 100 samples) or there are unknown sources of variation, contact the authorized customer representative to develop a suitable plan.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 77
Dipl.-Ing. Ralf Glner
PPAP
Examination of the stability (Process control)
process seems stable
process seems instable
examine capability continue with 4.11.3
Process may not meet customer requirements continue with 4.11.4
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 78
Dipl.-Ing. Ralf Glner
PPAP
4.11.3 Acceptance Criteria for Initial Study
Capability Index for stable process
Index > 1.67
the process currently meets the acceptance criteria after approval, begin production and follow control plan
1.33 Index 1.67
the process may be acceptable contact the authorized customer representative for a review of the study results
Index < 1.33
the process does not currently meet the acceptance criteria contact the authorized customer representative for a review of the study results
PPAP_engl.PPT vom 13.01.2007 Seite 79
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
Dipl.-Ing. Ralf Glner
PPAP
4.11.4 Unstable Processes
Depending on the nature of the instability, an unstable process may not meet customer requirements. The organization shall identify, evaluate and, wherever possible, eliminate special causes of variation prior to PPAP submission. The organization shall notify the authorized customer representative of any unstable processes that exist and shall submit a corrective action plan to the customer prior to any submission. NOTE: For bulk materials, for processes with known and predictable special causes and output meeting specifications, corrective action plans may not be required by the customer.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 80
Dipl.-Ing. Ralf Glner
PPAP
4.11.5 Processes With One-Sided Specifications or Non-Normal Distributions
The organization shall determine with the authorized customer representative alternative acceptance criteria for processes with one-sided specifications or nonenormal distributions. NOTE: The above mentioned acceptance criteria assume normality and a two-sided specification (target in the center). When this is not true, using this analysis may result in unreliable information. These alternate acceptance criteria could require a different type of index or some method of transformation of the data. The focus should be on understanding the reasons for the nonnormality (e.g., is it stable over time?) and managing variation. Refer to the Statistical Process Control reference manual for further guidance.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 81
Dipl.-Ing. Ralf Glner
PPAP
4.11.6 Actions To Be Taken When Acceptance Criteria Are Not Satisfied
The organization shall contact the authorized customer representative if the acceptance criteria cannot be attained by the required PPAP submission date. The organization shall submit to the authorized customer representative for approval a corrective action plan and a modified Control Plan normally providing for 100% inspection. Variation reduction efforts shall continue until the acceptance criteria are met, or until customer approval is received. NOTE: 100% inspection methodologies are subject to review and concurrence by the customer.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 82
Dipl.-Ing. Ralf Glner
PPAP
4.12 Qualified Laboratory Documentation
Inspection and testing for PPAP shall be performed by a qualified laboratory as defined by customer requirements (e.g., an accredited laboratory). The qualified laboratory (internal or external to the organization) shall have a laboratory scope and documentation showing that the laboratory is qualified for the type of measurements or tests conducted. When an external/commercial laboratory is used, the organization shall submit the test results on the laboratory letterhead or the normal laboratory report format. The name of the laboratory that performed the tests, the date (s) of the tests, and the standards used to run the tests shall be identified.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 83
Dipl.-Ing. Ralf Glner
PPAP
4.13 Appearance Approval Report (AAR)
AAR = approval report for the appearance of appearance items concerning requirements on color, structure, or surface For completion of AAR, see instruction in PPAP, appendix B A separate AAR shall be completed for each part or series of parts for which a submission is required if the product/part has appearance requirements on the design record Upon satisfactory completion of all required criteria, the supplier shall record the information on the AAR
since the Appearance Approval Report is a industry wide used form not all customers will require entries in every position
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 84
Dipl.-Ing. Ralf Glner
PPAP
4.13 Appearance Approval Report (AAR) /
The completed AAR and representative production products/parts shall be submitted to the location specified by your customer to receive disposition AARs (complete with part disposition and customer signature) shall then accompany the PSW at the time of final submission based upon the submission level requested
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 85
Dipl.-Ing. Ralf Glner
PPAP
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 86
Dipl.-Ing. Ralf Glner
PPAP
4.14 Sample Production Parts
The organization shall provide sample products as specified by the customer.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 87
Dipl.-Ing. Ralf Glner
PPAP
4.15 Master Sample
The organization shall retain a master sample for the same period as the production part approval records, or
a) until a new master sample is produced for the same customer part number for customer approval, or b) where a master sample is required by the design record, Control Plan or inspection criteria. as a reference or standard.
The master sample shall be identified as such, and shall show the customer approval date on the sample. The organization shall retain a master sample for each position of a multiple cavity die, mold, tool or pattern, or production process unless otherwise specified by the customer.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 88
Dipl.-Ing. Ralf Glner
PPAP
4.16 Checking Aids
If requested by the customer, the organization shall submit with the PPAP submission any part-specific assembly or component checking aid. The organization shall certify that all aspects of the checking aid agree with part dimensional requirements. The organization shall document all released engineering design changes that have been incorporated in the checking aid at the time of submission. The organization shall provide for preventive maintenance of any checking aids for the life of the part. measurement system analysis studies, e.g. gage R&R, accuracy, bias, linearity, stability studies, shall be conducted in compliance with the customer requirements. See MSA (Measurement Systems Analysis reference manual).
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 89
Dipl.-Ing. Ralf Glner
PPAP
4.17 Customer-Specific Requirements
The organization shall have records of compliance to all applicable customer-specific requirements. For bulk materials, applicable customer-specific requi rements shall be documented on the Bulk Material Requirements Checklist.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 90
Dipl.-Ing. Ralf Glner
PPAP
4.18. Production Part Submission Warrant
Upon completion of all PPAP requirements, the organization shall complete the Part Submission Warrant (PSW).
Warrant
A separate PSW shall be completed for each customer part number unless otherwise agreed to by the authorized customer representative. If production parts will be produced from more than one cavity, mold, tool, die, pattern, or production process. e.g., line or cell, the organization shall complete a dimensional evaluation on one part from each. The specific cavities, molds, line, etc., shall then be identified in the Mold/Cavity/Production Process line on a PSW, or in a PSW attachment.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 91
Dipl.-Ing. Ralf Glner
PPAP
4.18. Production Part Submission Warrant/
Warrant The organization shall verify that all of the measurement and test results show conformance with customer requirements and that all required documentation is available and, for Level 2, 3, and 4, is included in the submission as appropriate.
A responsible official of the organization shall approve the PSW and provide contact information.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 92
Dipl.-Ing. Ralf Glner
PPAP
Part Submission Warrant
consists of: Information about the part Some formal information Materials reporting Reason of the submission Requested submission level Result of the submission Declaration For customer use (result)
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 93
Dipl.-Ing. Ralf Glner
PPAP
Detail of Part Submission Warrant
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 94
Dipl.-Ing. Ralf Glner
PPAP
Dimension Results / Part Weight (Mass)
The organization shall record on the PSW the part weight of the part as shipped, measured and expressed in kilograms to four decimal places (0.0000) unless otherwise specified by the customer. The weight shall not include shipping protectors, assembly aides, or packaging materials. To determine part weight, the organization shall individually weigh ten randomly selected parts, calculate and report the average weight. At least one part shall be measured from each cavity, tool, line or process to be used in product realization. NOTE: This weight is used for vehicle weight analysis only and does not affect the approval process. Where there is no production or service requirement for at least ten parts, the organization should use the required number for calculation of the average part weight.
2007 by R.Glner, D-85221 Dachau, +49-8131-53595, www.glaessner.de PPAP_engl.PPT vom 13.01.2007 Seite 95
Dipl.-Ing. Ralf Glner
PPAP
Contents
1. 2. Introduction Content of the QS-9000
1. 2. 3. 4. 5. 6.
PPAP
General PPAP Requirements Customer Notification and Submission Requirements Submission Levels Part Submission Status Record Retention
3. 4. 5.
Summary of the Process The Documentation and its Preparation Summary
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 96
Dipl.-Ing. Ralf Glner
PPAP
The Attempt to Run PPAP without APQP!
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 97
Dipl.-Ing. Ralf Glner
PPAP
The Production Part Approval Process is an extensive strict approval process for new or changed designs or processes.
Summary
It is very formalized, so it inevitably causes some administration work, but it doesnt demand anything that makes no sense from an engineers point of view! Later changes of the product or the process are expensive and take a lot of time. The prerequisite to fulfill PPAP demands is a carefully done quality planning according to QS-9000 APQP.
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 98
Dipl.-Ing. Ralf Glner
PPAP
6.
Internet Links
http://www.din.de http://www.iso.ch http://www.cenorm.be https://www.carwin.co.uk/qs/qs9000default.htm http://www.aiag.org http://www.iaob.org http:// www.vda-qmc.de
2007 by R.Glner, D-85221 Dachau,
+49-8131-53595, www.glaessner.de
PPAP_engl.PPT vom 13.01.2007
Seite 99