SUMMARY OF CONCRETE CUBE TEST RESULTS
Contract Name: Contract Ref: Concrete Grade: Client:
Request Sheet No. Pile No. Cube Set No. Site Location Date Cast Date Collected
35
N/mm2
Specified Strength
Compressive Strength (N/mm2) after
7-13 Days 14-27 Days 28-42 Days 28-42 Days 43-55 Days 56+ Days
Characteristic Strength @ 28 Days (N/mm2)
Comments
5/14/2013
Contract Name: Contract Ref: Concrete Grade: Client:
Request Sheet No. Pile No. Cube Set No. Site Location Date Cast Date Collected
35
N/mm2
Specified Strength
Compressive Strength (N/mm2) after
7-13 Days 14-27 Days 28-42 Days 28-42 Days 43-55 Days 56+ Days
Characteristic Strength @ 28 Days (N/mm2)
Comments
5/14/2013