SAMPLING SYSTEM SELECTION QUESTIO
Client: Mine:
Method of drilling? Type of Drilling? Drill Rig Make & Model Sampling System Mounting Configuration? Rig Compressor Air Volume (scfm)? Compressor Pressure? Altitude? Ambient Operating Conditions (Range?) Drill Bit Diameter? Drill Rod Diameter? Sampling Interval? Drill Hole Depth? Mineral being drilled for? Maximum Ore Moisture Content? Minimum Ore Moisture Content? Are sticky clays present? Ore Specific Gravity? Drilled ore bulk density? Maximum Particle Size? Maximum "Instantaneous" Drill Penetration Rate Primary Sample Weight Primary Sample Splitting Percentage Duplicate Sample Weight Duplicate Sample Splitting Percentage Logging Sample Weight Logging Sample Splitting Percentage RC Drill String Inner Tube Diameter RC Hammer Model RC Hammer Shroud Fitted Sampling Hose Inside Diameter Selected scfm psi m C " " m m
RC, Conventional, Other Production, Grade Control, Exploratio
On Rig, Trailer, Truck, Other
Above sea level Standard System designed for -5C to
Gold, Copper, Iron Ore, Nickel, etc % % Yes or No In ground prior to drilling After drilling
kg/m mm m/min kg % kg % kg % "
Maximum of 1m/min
If Required If Required If Required If Required
"
Electrical Supply Voltage Comments:-
VDC
12 or 24VDC
1) 2) 3) 4) 5) 6) 7) 8) 9) 10)
SELECTION QUESTIONNAIRE
Date: Enquiry Number: RC, Conventional, Other Production, Grade Control, Exploration
On Rig, Trailer, Truck, Other
Above sea level Standard System designed for -5C to +50C
Gold, Copper, Iron Ore, Nickel, etc
In ground prior to drilling After drilling
Maximum of 1m/min
If Required If Required If Required If Required
12 or 24VDC