0% found this document useful (0 votes)
200 views1 page

ERKE Group, Vibratory Hammer PTC 30H2 CX85 Hydraulic Hammer Port of Cannes France

The document summarizes a construction project taking place in Cannes, France. Bouygues Construction was awarded the contract to modernize the Port of Cannes, which includes replacing jetties and building a new breakwater. A PTC 30H2 vibrodriver and CX85 hydraulic hammer powered by a PTC 400DO power pack are being used to drive 800mm casings into the seabed. Using a single power pack rather than two provides equipment savings. The power pack has a Stage IIIB compliant engine and fuel efficient Ecomode system to reduce emissions and consumption.

Uploaded by

erkegroup
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views1 page

ERKE Group, Vibratory Hammer PTC 30H2 CX85 Hydraulic Hammer Port of Cannes France

The document summarizes a construction project taking place in Cannes, France. Bouygues Construction was awarded the contract to modernize the Port of Cannes, which includes replacing jetties and building a new breakwater. A PTC 30H2 vibrodriver and CX85 hydraulic hammer powered by a PTC 400DO power pack are being used to drive 800mm casings into the seabed. Using a single power pack rather than two provides equipment savings. The power pack has a Stage IIIB compliant engine and fuel efficient Ecomode system to reduce emissions and consumption.

Uploaded by

erkegroup
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PTC - Job report

CX85 hammer & 30H2 vibrodriver working on the French Riviera, Port of Cannes, France.
In Frances Cte dAzur, at the ancient port of the city of Cannes near the congress hall of the famous Cannes Film Festival, the quay of Pantiero is going through major modernisation and renovation works.
Bouygues Construction, one of the world construction leaders, has been awarded the works concerning the replacement of fixed jetties and the construction of a new breakwater, which will reduce coastal erosion and provide safe harbourage.

KEY FACTS
- One power pack supplies power to both piling tools. - Power pack with particle filter. - Powerpacks engine with Stage IIIB certification. - Bio oil.

The agency, Bouygues Travaux Public Rgion France, has chosen a PTC 30H2 Vibrodriver together with a CX85 hydraulic hammer, to drive 800mm diameter casings needed for this project. Both piling tools are powered by the new PTC 400DO power pack (238kW), which has an open loop circuit that supplies power to various tools. The use of one power pack instead of two, represented important equipment savings for the contractor. The 400DO power pack has a Deutz engine TCD2013L6 4V, which complies with stage IIIB emission standards. This power pack is equipped with an Ecomode Sytem, which constantly adapts the speed of the diesel engine to supply only the needed complies power, thus reducing fuel consumption.
PTC 400DO Powerpack and CX85 hydraulic hammer on the barge.