Boiler super heater tube failure
(Reference: Japan METI report)
Summary -One through water tube boiler -Fuel: only coal combustion -MCR 2,120t/h
-The leakage of steam was found during operators patrolling.
-One stub of 4th stage super heater outlet header was ruptured -As the result of extensive inspection, further one nozzle were found to be ruptured
4th S.H. inlet tube header
4th S.H. outlet tube header
Non-heating zone
Rapture
4th S.H. tubes Heating zone
4th S.H. outlet tubes header cross-section
Cause of failure
-When the header was fabricated in the factory, some tubes were heated to rectify the pitch of nozzles.
-The heating temperature was over phase transformation point, so locally metal structure changed and creep strength was down. So creep rupture occurred at short time which was expected.
Countermeasure to recurrence
-Failed tube and other distorted tubes found by extensive inspection (Total 29 tubes) were replaced to new ones.
-Soundness of the tubes were confirmed every turnaround