Heavy-Duty Gas Turbine Operating and Maintenance Considerations
HYDERABAD
GT INSPECTIONS
Running Inspections Standby Inspections Shutdown Inspections
HDGT.PPT/ 2
HYDERABAD
Running Inspection Data Parameters to be monitored -Summary
Speed Load Fired Starts Fired Hours Site Barometric Reading Temperatures Inlet Ambient Compressor Discharge Turbine Exhaust Turbine Wheelspace Lube Oil Header Lube Oil Tank Bearing Drains Exhaust Spread
Pressures Compressor Discharge Lube Pump(s) Bearing Header Cooling Water Fuel Filters (Fuel, Lube, Inlet Air) Vibration Data for Power Train Generator Output Voltage Field Voltage Phase Current Field Current VARS Stator Temp. Load Vibration Start-Up Time Coast-Down Time
RUNNING INSPECTIONS
HYDERABAD
OPERATIONAL DIAGNOSTICS
Start up
Increased Startup time Jaw clutch disengagement at a lower speed Higher vibrations during critical speeds
- Indicative of unhealthy starting means / turbine bearings
HDGT.PPT/ 4
HYDERABAD
Critical speeds Typical (Fr-5P)
First critical 1900 rpm Second critical 3250 rpm Third critical 5200 to 5600 rpm
Critical speeds Typical (Fr-6B)
First critical 1650 to 1880 rpm Second critical 3260 to 3900 rpm Third critical 7050 to 7350 rpm
HDGT.PPT/ 5
HYDERABAD
Critical speeds Typical (Fr-9E)
First critical 980 rpm Second critical 1300 rpm Third critical 2300 rpm
Critical speeds Typical (Fr-6FA)
First critical Second critical 1840 rpm 4743 rpm
HDGT.PPT/ 6
RUNNING INSPECTIONS
HYDERABAD
OPERATIONAL DIAGNOSTICS
Load Limitation / Hunting
Unable to maintain load Unable to increase load
- Indicative of clogged hydraulic filters and / or damaged fuel pump and / or relief valve
HDGT.PPT/ 7
RUNNING INSPECTIONS
HYDERABAD
OPERATIONAL DIAGNOSTICS
Combustion Trouble / exhaust spread
Increasing trend in exhaust temperature spread Changing pattern of exhaust temp. spread with load
- Indicative of unequal fuel distribution to fuel nozzles
HDGT.PPT/ 8
RUNNING INSPECTIONS
HYDERABAD
OPERATIONAL DIAGNOSTICS
Lower Loads under similar conditions Higher Exhaust Temperature under similar
conditions - Indicative of compressor fouling
HDGT.PPT/ 9
HYDERABAD
STANDBY INSPECTION
Inspections carried out during Off-peak periods when Unit is not running for a long duration
Check Battery system, Oil levels, instrument calibrations, replacement of various filters & servicing of accessory systems etc. Put the unit on ratcheting / barring gear for atleast 30 min daily Crank the Turbine once in a Fortnight to drive away Moisture Run the Gas Turbine FSNL once every month to avoid corrosion to turbine wheel dovetails
HDGT.PPT/ 10
HYDERABAD
PERIODIC SHUTDOWN INSPECTIONS A Maintenance Program should:
Optimize owners maintenance costs
Maximize equipment availability
HYDERABAD
Factors Affecting Maintenance Planning and Maintenance Program
Manufacturers Recommended Maintenance Program
Design Features
Duty Cycle
Cost of Downtime
Diagnostics
Type of Fuel
Maintenance Program
Availability Need On-Site Maintenance Capability Expert Systems
Utilization Need
Environment
Reserve Requirements
HYDERABAD
Because not all customers operate their gas turbines the similarly
not all customer maintenance programs are the same.
Case 1
8,000 Hrs/Yr 160 Starts/Yr HGP at 3 years
Case 2
1,000 Hrs/Yr 400 Starts/Yr HGP at 3 years, not 24 years
BHEL Provides Guidance for Customer Maintenance Planning
HYDERABAD
Maintenance Cost and Equipment Life Are Influenced by Key Service Factors
Fuel Firing Temperature Steam/Water Injection Cyclic Effects (Start-up rate, number of trips) Air Quality
Service Factors Different From the Reference Condition* Can Increase Maintenance Cost & Reduce Maintenance Intervals
HYDERABAD
Potential Failure Modes
Hot-Gas-Path Components Continuous Duty Application Cyclic Duty Application Creep Deflection Thermal Mechanical Fatigue Creep Rupture Rubs/Wears. Corrosion Oxidation Erosion. High-Cycle Fatigue.
HYDERABAD
Maintenance Factors
Typical Max Inspection Intervals (MS6B/Ms7EA) Hot Gas Inspection 24,000 hrs or 1200 Starts Major Inspection 48,000 hrs or 2400 Starts
Criterion is Hours or Starts (Whichever Occurs First)
Hot Gas Path (Buckets & Nozzles)
Factors Impacting Maintenance
Hours Factors
Fuel Gas Distillate Crude Residual
Starts Factors
Trip From Full Load 8 Fast Load 2 Fast Start 20
1 1.5 2 to 3 3 to 4
Peak Load 6 Water/Steam Injection Dry Control 1 (GTD-222) Wet Control 1.9 (5% H20)
HYDERABAD
Operation of Gas Turbine in Extended lean-lean base mode in DLN-1 units has a maintenance factor of 10
HDGT.PPT/ 17
HYDERABAD
Maintenance Factor Definition
IDEAL INTERVAL = RECOMMENDED INTERVAL =
Interval for Continuous Base Load on Clean Natural Gas
Ideal Interval determined from application of maintenance factors
HYDERABAD
Maintenance Factors Summary
Maintenance Requirements are Based on an Independent Count of Hours and Starts Certain Operating Factors Reduce Maintenance Intervals Peak Load Steam/Water Injection >2.2% Liquid Fuel Trips From Load Fast Starts Exceeding BHEL Specification Limits can Significantly Increase Maintenance Factors and Reduce Component Life Equations for Establishing Application Specific Hot Gas Path Maintenance Intervals are Available
HYDERABAD
Estimated Effect of Fuel Type on Maintenance
Residual
Maintenance Factor
Distillates
Heavy
Light Natural Gas
7 8 9 10 11 12 13 14 15
20
Fuel Percent Hydrogen by Weight in Fuel
HYDERABAD
Turbine Start/Stop Cycle
Base Load
540 Deg C
Acceleration Light-off
Unload Ramp
Exh. Temp.
Load Ramp Full Speed No Load Trip
Full Speed No Load
Warm-up
Fired Shutdown
Start-up
Time
Shutdown
HYDERABAD
Maintenance Factor - Trips from Load
10 9 8 7 6 5 4 3 2 1 0 0
Trip Severity Factor
Base
FSNL
For trips during Start-up Acceleration, assume Trip Severity Factor = 2
40 60 % Load 80 100 120
20
HYDERABAD
Heavy-Duty Gas Turbine
Major inspection
Hot-Gas-Path Inspection Combustion Inspection
Shutdown Inspections
Combustion Hot-Gas-Path Major
Special Inspections
Borescope IGV Bushing insp.
HYDERABAD
Base Line Recommended Inspection Intervals Base Load - Gas Fuel - Dry
Type of Inspection Combustion Hot-Gas Path Major MS32/52/51 Upgrade (Standard)
Hours/Starts MS6B MS6FA & 9FA Standard DLN2 & DLN1 12000/1200
24000/1200 48000/2400
MS9E Standard & DLN1 8000/900 24000/900 48000/2400
12000/800
Eliminated/1200 48000/2400
8000/450
24000/900
48000/2400
Factors That Can Reduce Maintenance Intervals Trips from Load Fuel Start Cycle Load Cycle HGP Hardware Design Steam/Water Injection Peak Load Operation
HYDERABAD
Maintenance Inspections Combustion Inspection - Key Elements
Key Hardware Combustion Liners Combustion Covers Fuel Nozzles Transition Pieces Cross Fire Tubes Flow Sleeves Check Valves Spark Plugs Flame Detectors Flex Hoses Inspect for: Foreign Objects Abnormal Wear Cracking Liner Cooling Hole Plugging TBC Coating Condition Oxidation/Corrosion/Erosion Hot Spots/Burning Missing Hardware Clearance Limits Borescope Compressor and Turbine Potential Actions: Repair/Refurbishment Liners Cracking/Erosion/Wear TBC Repair Transition Pieces Wear TBC Repair Distortion Fuel Nozzles Plugging Erosion/Wear Cross Fire Tubes Wear/Burning Availability of On Site Spares Is Key to Minimizing Downtime
WORK SCOPE:
Criteria:
Op. & Instr. Manual TILs Service Engineers
Inspection Methods:
Visual LP Borescope
HYDERABAD
Maintenance Inspections Hot Gas Path Inspection - Key Elements
WORK SCOPE: Combustion Inspection work scope +
Key Hardware Nozzles (1,2,3) Inspect for: Potential Actions:
Buckets (1,2,3)
Stator Shrouds IGVs & Bushings
Compressor Blading (Borescope)
Foreign Objects Damage Repair/Refurbishment Nozzles Oxidation/Corrosion/Erosion Weld Repair Cracking Reposition Cooling Hole Plugging Recoat Remaining Coating Life Buckets Nozzle Deflection/Distortion Strip & Recoat Weld Repair Abnormal Deflection/Distortion Blend Abnormal Wear Missing Hardware Clearance Limits
Criteria:
Op. & Instr. Manual TILs Service Engineers
Inspection Methods:
Visual LP Borescope
Availability of On Site Spares Is Key to Minimizing Downtime
HYDERABAD
Maintenance Inspections GT Major Inspection - Key Elements
WORK SCOPE: Combustion Inspection Work Scope + HotGas Path Inspection Work Scope +
Key Hardware
Compressor Blading Turbine Wheels Dovetails Journal and Seal Surfaces
Inspect for:
Foreign Objects Damage Oxidation/Corrosion/Erosion Cracking Leaks Abnormal Wear Missing Hardware Clearance Limits
Potential Actions:
Repair/Refurbishment Stator Shrouds Oxidation/Corrosion/Erosion Buckets Coating Deterioration FOD/Rubs/Cracking Tip Shroud Deflection Creep Life Limit Nozzles Deterioration IGV Bushings Wear Bearings/Seals Boring/Wear Compressor Blades Corrosion/Erosion Rubs/FOD
Availability of On Site Spares Is Key to Minimizing Downtime
Bearing Seals
Inlet System Exhaust System
Criteria:
Op. & Instr. Manual Inspection Visual Methods: LP TILs Service Engineers Borescope
HYDERABAD
Estimated Repair/ Replacement Cycles
Repair Starts Replacement Hours 3CI 4CI 2CI 3HGPI 2HGPI 3HGPI 2HGPI 5CI 6CI 3CI 3HGPI 3HGPI 4HGPI 2HGPI
Liners TPs Fuel Nozzles N#1,2,3 B#1 B#2,3 Shroud#1
CI CI CI HGPI HGPI HGPI HGPI
Shroud#2,3
HGPI
4HGPI
3HPGI
Typical and informative only. Depends upon GT type and size
HDGT.PPT/ 28
HYDERABAD
Repair/ Replacement Cycles Life Extension
New Nozzle
Nozzle Condition
Repaired Nozzle Min Acceptability Standard
First repair
2nd repair Without repair 3rd repair
Severe Deterioration
10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 Operating Hours FIRST STAGE NOZZLE WEAR - PREVENTIVE MAINTENANCE LIFE EXTENSION
HDGT.PPT/ 29
Repair cost exceeds replacement cost
Acceptance Standard
HYDERABAD
SPARE PARTS PLANNING - CONSIDERATIONS
Repair / replacement intervals
Cost Procurement cycle time Repair cycle time Vs. Inspection down time Shelf life Storage facilities Environment Transport facilities
HDGT.PPT/ 30
HYDERABAD
Borescope Inspection
BORESCOPE INSPECTION CRITERIA
ACCESS AREA Compressor Blades
INSPECT FOR Foreign object damage Dirt buildup
Corrosion
Tip Erosion Trailing Edge thinning
Stator blade root erosion
Tip clearances
HDGT.PPT/ 31
HYDERABAD
Borescope Inspection
BORESCOPE INSPECTION CRITERIA
ACCESS AREA Combustion (Liner and transition piece)
INSPECT FOR Carbon build-up Hot spots
Cracking
Bulging Wear
Missing metal or thermal barrier coating
HDGT.PPT/ 32
HYDERABAD
Borescope Inspection
BORESCOPE INSPECTION CRITERIA
ACCESS AREA Turbine Nozzles
INSPECT FOR Foreign object damage Corrosion
Blocked cooling holes
Cracks Trailing edge bowing
Erosion
Burning
HDGT.PPT/ 33
HYDERABAD
Borescope Inspection
BORESCOPE INSPECTION CRITERIA
ACCESS AREA
Turbine buckets
INSPECT FOR
Foreign object damage Corrosion
Blisters
Erosion Cracks Tip clearance Missing metal
HDGT.PPT/ 34
HYDERABAD
Borescope Inspection
RIGID BORESCOPE
BORESCOPE
FLEXIBLE BORESCOPE
HDGT.PPT/ 35
HYDERABAD
VIGV Bushing Inspection
1. Set vanes to full open position
84
VIGV in fully Open Position
Airflow Direction
2. Set up dial indicator to measure motion normal to the vane chord. Position the indicator to read as close to the vane inner button as possible 3. Deflect vane in a tangential direction (perpendicular to the air flow direction) to both sides of the bushing clearance and record full dial indicator reading.
HDGT.PPT/ 36
VIGV
Dial Indicator
HYDERABAD
VIGV Bushing Inspection
HDGT.PPT/ 37
HYDERABAD
DOWN TIME REDUCTION
Casings are horizontally split
SPECIAL DESIGN FEATURES FOR EASY MAINTENANCE
With upper half of casings removed, it is possible to remove nozzles and inspect buckets without removing rotor
All bearing housings are horizontally split and bearings can be replaced without removing the rotor. Large blades are moment weighed and sequenced to avoid rebalancing of rotor after site replacement. Components like governing components, fuel nozzles, combustion components are mounted type for easy maintenance. All major accessories are separate assemblies and are accessible for inspection and maintenance.
HDGT.PPT/ 38