0% found this document useful (0 votes)
211 views2 pages

Form Ssa PDC 5

This document is a certificate for endorsement of electrical drawings, design calculations, equipment data, and material sheets (EDMS) for a sewerage system. It certifies that the installation details in the EDMS are true and correct, and that the electrical works have been installed according to engineering practices and regulatory requirements. It also certifies the same for the mechanical works and installation. The qualified electrical and mechanical engineers sign the certificate and take responsibility for the proper installation and performance of the system.

Uploaded by

Lee LaiHaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
211 views2 pages

Form Ssa PDC 5

This document is a certificate for endorsement of electrical drawings, design calculations, equipment data, and material sheets (EDMS) for a sewerage system. It certifies that the installation details in the EDMS are true and correct, and that the electrical works have been installed according to engineering practices and regulatory requirements. It also certifies the same for the mechanical works and installation. The qualified electrical and mechanical engineers sign the certificate and take responsibility for the proper installation and performance of the system.

Uploaded by

Lee LaiHaa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

FORM SSA/PDC/5

SEWERAGE SERVICES ACT 1993 SEWERAGE SYSTEMS AND SEPTIC TANKS CERTIFICATE OF ELECTRICAL DRAWINGS, DESIGN CALCULATIONS, EQUIPMENT DATA AND MATERIAL SHEETS (EDMS) (for endorsement on plans, calculations and EDMS to be lodged with the Director General)

Date: __________________ 20 ____

To: The Director General of Sewerage Services I hereby certify that the installation and details in the equipment data and material sheet viz: On Lot/s: _____________________________________________________________________ Section: ______________________________________________________________________ Jalan: ________________________________________________________________________ for (Name of owner): ____________________________________________________________

are filled, completed, true and correct, and these electrical works have been installed in accordance to sound engineering practices and are in accordance to the Guidelines For Developers, the MS1228 Codes of Practice for Design and Installation of Sewerage System, and other regulatory agencies requirements and that I take full responsibility for the installation and performance of the same.

Signature of Qualified Person (Electrical Installation) Address:

I.C.No.: Registration No: Class: Discipline: Electrical Engineer

FORM SSA/PDC/5

I hereby certify that the installation and EDMS provided are filled, completed, true and correct, and these mechanical works have been installed in accordance to sound engineering practice and are in accordance to the Guidelines For Developers, the MS1228 Codes of Practice for Design and Installation of Sewerage System, and other regulatory agencies requirements and that I take full responsibility for the installation and performance of the same.

Signature of Qualified Person (Mechanical Installation) Address:

I.C.No.: Registration No: Class: Discipline: Mechanical Engineer

FOR OFFICIAL USE ONLY Date Received: ______________________ Checked By:_______________________ Ref.No._____________________________

You might also like