A320-200 WEEKLY CHECK (Daily) : Airworthiness Management
A320-200 WEEKLY CHECK (Daily) : Airworthiness Management
AIRWORTHINESS MANAGEMENT
Ref: SAI/ENGG/AWM/WEEKLY Dated: _____________
2- Tasks to be accomplished every 7-calendar days (168 hours elapsed time) not exceeding the 8 day.
Page 1 of 7
TASK DESCRIPTION
MECH
AME
2.
For MLG brakes, check Heat Pack Wear Indicators. Open MLG doors. 1. The movement of door actuator must be smooth & continuous. The door should open from fully closed position to the point at which the actuator is vertical in 30 seconds. 2. Move the MLG Door with your hand away from the fully open position, through approximately 30 degrees & back to the fully open position, make sure that the resistance to motion is smooth. There must be hydraulic resistance only. 3. With the door fully open, measure the dimension DIM as shown in FIGURE 2. Dimension DIM must be greater than or equal to 385 mm (15.157 in). If the door actuator fails any of the above three inspection checks, it must be replaced before next flight.
Page 3 of 7
TASK DESCRIPTION
MECH
AME
5.
Page 4 of 7
Integrated Standby Instrument System (ISIS) Reset of the ISIS Indicator. On the panel 49VU, open the NAV/STBY/INST circuit breaker for more than 5 seconds then close it. After few seconds, INIT page comes into view on the ISIS Indicator. THIS TASK IS ONLY APPLICABLE ON A320 AP-BLJ, AP-BLK & AP-BLN (MSNs 1497,2027 & 3270) AIRCRAFT DOCUMENTATION Check the following onboard Documents 1- Certificate of Registration 2- Certificate of Airworthiness (C of A) 3- Insurance 4- Weight Schedule 5- Radio License
6- Radio Installation Certificate 7- Noise Certificate 8- Emergency Equipment Chart 9- Technical Log Book 10- AOC 11- Certificate of MR 12- Certificate of Maintenance Release
PASSENGER CABIN 1. Ensure A/C interior cleanliness. 2. Entry area floor covering for obvious damage and cleanliness. 3. Passenger seats for obvious damage and seat covers for condition and stain. 4. Sidewall- and ceiling panels, bins, partitions and curtains for obvious damages and cleanliness. 5. Ceiling panels for proper installation. 6. Carry out a visual inspection of fwd and aft lavatories extinguisher bottles for evidence of leakage and/or discharge and check temperature indicators for any color change. 7. Check all portable Oxygen units for minimum dispatch pressure. 8. Check for serviceability of cabin reading, external lights. Operational test of cabin emergency lights by Test Emergency Light Sys pushbutton & emergency escape path marking. 9. Visual check of the tamper seal/serviceability indication of the protective breathing equipment.(CKPT & CABIN) 10. Cleaning of vacuum waste lines with chemical cleaning agent. EMERGENCY EQUIPMENT Check all the emergency equipment for condition quantity & validity. Check that all installation/ fixtures / brackets etc required to secure the emergency equipment to their proper location are installed and in serviceable condition. Refer Emergency Equipment Chart in aircraft for location of equipments.
Page 5 of 7
1 2 3 4 5 6 7 8 9
Crew Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle Cabin Oxygen Bottle
Note: An item must be replaced if it has an expiry of less than 30 days starting from the date of compliance of this particular task.
Certificate of Release to Service (CRS) I hereby certify that the overhaul / repair(s) / replacement(s) / scheduled maintenance task(s) / modification(s) / mandatory inspection(s) have been carried out in accordance with the instructions of the manufacturer and requirements of the Airworthiness Directorate. It is further certified that work has been performed in accordance with updated manuals, drawing using proper tools, calibrated test equipments, etc. The aircraft is fully airworthy and meets all the safety / Airworthiness standards. I am fully conversant with relevant Rules given in CAR 94, ANO's and Airworthiness Notices. Signature: ____________ Name: _______________ AME No. _____________ Date: ________________
Note: The person signing CRS is responsible to ensure that each and every task is signed.
Page 6 of 7
Page 7 of 7