A New Approach for In-Situ Calibration of Voltage Transformers Part II: VOTANO Extended Testing Benefits for your Applications
Florian Predl, OMICRON, Australia / Dr. Michael Krger, OMICRON, Austria Michael Freiburg, Technical University Dortmund, Germany 100% of the rated secondary burden. In addition for class 0.1 and 0.2 having a rated burden of 10VA or lower, the current ratio error and phase displacements is defined even for 0VA, representing an open circuit. For protection windings the voltage ratio error and phase displacement is specified even from 2% up to 100%*Fv of the rated primary voltage, whereas Fv is the rated voltage factor and can be specified up to 1.9 times of rated primary voltage. The burden range is specified from 25% to 100% of rated burden. Furthermore for voltage transformers having more than one secondary winding the class specification has to be fulfilled while other windings have to be treated as both, as open circuit (0VA) and loaded with 100% rated burden under consideration of the defined total simultaneous burden.
1 Introduction
To date the accuracy of conventional voltage transformers have mostly been obtained by applying rated voltage at the primary side and measuring the resulting secondary voltage, while rated load is applied. Due to the high voltage needed for such tests, this method has its practical limits, especially when it comes to on-site testing, respectively commissioning testing. A new approach for measuring the voltage and load depending voltage ratio error and phase displacement is the so called "modeling approach". Such an approach is used by the VOTANO device from OMICRON. This paper discusses this alternative approach and points out the information needed for calculating the voltage ratio error and phase displacement. Furthermore, some case studies from conducted field tests are presented.
In addition the VOTANO measures the turns ratio correction for considering a possible turns ratio compensation. A turns ratio compensation is a common practice for compensating the voltage ratio error towards a more positive ratio error. Using this method it can be achieved that the voltage transformer will stay within the tolerances defined by its accuracy class. Figure 1 indicates the equivalent circuit diagram of an inductive voltage transformer with five secondary windings, whereas the fifth winding is a residual voltage winding (da-dn). All voltages, currents and impedances are referred to the secondary winding 1a-1n.
Above standards require a certain amount of operating points where the voltage transformer has to fulfill the specified accuracy requirements. For metering windings the voltage ratio error and phase displacement is specified in between 80% to 120% of the rated primary voltage and from 25% to
Presentation 07.2.2
Xp''
R1 R2' R5'
X1 X2' X5' Xm Rm
primary voltage referred to the secondary winding 1a-1n core voltage (EMF Electro-Motive Force) secondary voltage at winding 1a-1n primary current referred to secondary winding 1a-1n exciting current burden current at winding 1a-1n burden current at winding xa-xn referred to winding 1a-1n winding resistance of primary winding referred to secondary winding 1a-1n leakage reactance of primary winding referred to secondary winding 1a-1n winding resistance of secondary winding 1a-1n winding resistance of winding xa-xn referred to secondary winding (1a1n) leakage reactance of secondary winding 1a-1n leakage reactance of winding xa-xn referred to secondary winding 1a-1n main inductivity of the core magnetic losses of the core
In addition to the equivalent circuit diagram of an inductive voltage transformer the equivalent circuit diagram of a CVT has following additional parameters Xc1'' impedance of top capacitor of the capacitor stack referred to secondary winding 1a-1n impedance of bottom capacitor of the capacitor stack referred to secondary winding 1a-1n impedance of compensation reactance referred to secondary winding 1a-1n
Xc2''
Xc''
For the determination of the individual losses several test have to be conducted. Therefore the measurement procedure of VOTANO is as follows: 1. Measurement of short-circuit impedances 2. Measurement of secondary winding resistances 3. Measurement of secondary short-circuit impedance (in case of more than one secondary winding) 4. Measurement of the initial magnetization curve and separation of frequency dependent core losses 5. Measurement of the turns ratio correction With the information of above tests the load dependent voltage ratio error and phase displacement can be calculated accordingly.
Figure 2 indicates the equivalent circuit diagram of a capacitive voltage transformer with five secondary windings whereas the fifth winding is a residual voltage winding (da-dn). The capacitive divider consists of C1 and C2. All voltages, currents and impedances are referred to the secondary winding 1a-1n.
Presentation 07.2.3
whereas x index of secondary winding where current signal is injected Figure 3 shows the test setup on an inductive VT and figure 4 indicates the test setup on a CVT. On CVTs the NHF (carrier) needs to be grounded.
Fig. 5 Setup for winding resistance measurement on inductive VTs and CVTs
The information of this measurement allows separating between the primary and secondary leakage reactance. In figure 6 the basic test setup is illustrated. For CVTs it is important to lift NHF (carrier) from ground, otherwise C2 will cause an additional parallel impedance on the primary. Additionally, a second voltage sense is connected at the shorting link directly. The reason for this is to compensate for possible contact resistances caused by the clamps of the shorting link and as well as the impedance itself of the shorting link. The secondary short-circuit impedance is expected to be very low, thus a possible contact impedance would drastically influence the test results obtained.
Fig. 6 Setup for secondary short-circuit impedance measurement on inductive VTs and CVTs
Presentation 07.2.4
3.5.1 Measurement of Turns Ratio Correction on Inductive VTs A VT can have a turns ratio correction, in order to compensate the voltage ratio error. Physically, the voltage ratio error is always negative, unless the VT has a turns ratio correction, which will shift the voltage ratio error towards a positive voltage ratio error. For the turns ratio correction measurement a voltage of maximum 4kV will be applied on the primary winding, while the induced secondary voltage is measured on each winding successively. This measurement represents a no load voltage ratio measurement at rather low primary voltages. At the same time the theoretical voltage ratio error is calculated using the mathematical model, assuming no turns ratio correction. The difference between the measured no load voltage ratio error and the calculated voltage ratio error is caused by the turns ratio correction of the VT. 3.5.2 Measurement of Turns Ratio Correction on CVTs On CVTs the turns ratio correction is measured in two sub-steps. First of all the overall voltage ratio is measured by applying a voltage (UprimM1) of maximum 4kV on the primary winding, while the induced secondary voltage (UsecM1) is measured on the first secondary winding (1a-1n). This result delivers the voltage ratio of the complete CVT, consisting of the voltage ratio caused by the capacitive divider (Nc) and the intermediate inductive VT (NVT).
Fig. 7 Setup for initial magnetization curve measurement on inductive VTs and CVTs
Presentation 07.2.5
As a second step the NHF (carrier) terminal is disconnected from ground and connected to HV terminal A. The primary voltage (UprimM2) is applied between A and NHF (carrier) against ground, while the induced secondary voltage (UsecM2) is measured on the first secondary winding 1a-1n, see figure 9. It has to be ensured that the intermediate inductive VT is now operated at the same working point as for the CVT total voltage ratio measurement, since the inductive part is non-linear with the applied voltage. This approach allows separating between the voltage ratio of the capacitive divider and the inductive divider. The measured voltage ratio is equal to the voltage ratio of the inductive intermediate VT.
3.6 Calculation of the Load Dependent Voltage Ratio Error and Phase Displacement
At this stage all parameters for the mathematical model are known, thus the load depending voltage ratio error and phase displacement can be calculated for every desired operating point of the VT defined in the selected standard. The burden current causes a voltage drop across the secondary stray impedance. This voltage drop is added to the terminal voltage in order to calculate the core voltage. At the obtained core voltage the resulting exciting current and its phase angle related to the core voltage is known. The information about the exciting current is needed for calculating the total primary current (Ip''). Depending on the load condition of the other windings, their burden current is added to the total primary current. The primary current causes and additional voltage drop across the primary stray impedance. The primary voltage drop is added to the core voltage in order to derive the primary voltage. The voltage ratio error can be derived from the primary voltage and secondary terminal voltage. As the turns ratio correction is known, the offset caused by the turns ratio correction is added to the calculated voltage ratio error. As the calculation itself is done in complex plane the phase displacement can be derived as well.
As a last step the primary voltage is raised up to 3kV as a maximum in order to measure the voltage ratio error of the intermediate VT at a higher test voltage for a more accurate calculation of the turns ratio correction. The measurement of the CVT inductive voltage ratio at maximum 3kV has to be repeated successively for every secondary winding, since the turns ratio correction has to be derived for every secondary winding.
4 Case Studies
4.1 Measurement on a 66kV Reference VT
The first case study is about an onsite measurement on a 66kV to 132kV reference VT. The secondary winding has two taps for adapting the voltage ratio between 132kV/3:110V/3 and 66kV/3:110V/3. The nameplate information about the VT is indicated on figure 10. The accuracy of this reference VT is defined as 0.03% in voltage ratio error and 1.5min in phase displacement at a rated load of 1VA with a power factor of 1.0 and for a voltage range from 50% to 125% of rated primary voltage. The accuracy of the VT is specified for a frequency range of 50Hz to 60Hz.
Presentation 07.2.6
The obtained phase displacement was slightly outside the required limits of 1.5min, see figure 14 and figure 15. The highest variance was at 80% rated primary voltage and 1VA load with an absolute value of -1.07min. This discrepancy would be acceptable for verification measurements on class 0.1 metering VTs.
Power Phase displacement table (min) VA [%] 100,0% 0,0% cos phi 1,0000 1,0000 80% -2,5727 -2,3296 100% -2,5655 -2,3225 120% -2,5576 -2,3146
VA 1,0000 0,0000
The picture below (figure 11) shows the terminal box of the secondary winding. The VT was tested several times in order to prove the stability of the test results for 50Hz, 60Hz and even for both possible voltage ratios.
The test results below are an example for the full tap (66kV/3:110V/3) at 50Hz. It can be seen (figure 12 and figure 13) that the voltage ratio error is within the required limits of 0.03% from 80% up to 120% of rated primary voltage and from 0VA up to 1VA load condition.
Power VA 1,0000 0,0000 VA [%] 100,0% 0,0% cos phi 1,0000 1,0000 Voltage ratio error in % of rated voltage 80% -0,0064% -0,0052% 100% -0,0038% -0,0025% 120% -0,0019% -0,0006%
The results itself have proven to be very stable over the frequency range of 50Hz to 60Hz and for all successive measurements conducted. The biggest absolute variance between all successive tests was 0.001% in regards to the voltage ratio error and 0.03min in regards to the phase displacement. This proves that the modeling concept works in a reliable and repeatable way.
Presentation 07.2.7
measurement according to the International System of Units (SI). The extended measurement uncertainty UFu for the voltage ratio error is 0.006%, respectively Uu for the phase displacement is 0.4min. Figure 16 shows the nameplate information of the reference VT and figure 17 illustrates the obtained voltage ratio error and phase displacement obtained at the laboratory.
0,0000
5 Conclusion
This paper discusses a new methodology for mobile testing of inductive voltage transformer and capacitive coupled voltage transformers by using a modeling approach. This concept of modeling is utilized by the VT Analyzer VOTANO 100. In order to calculate the load dependent voltage ratio error and phase displacement all parameters according to the equivalent circuit diagram of a voltage transformer needs to be obtained. The selected case studies have proven that the approach is resulting in quite accurate test results which are fairly close to the reference. Therefore the device can be used for testing VTs during the manufacturing process and as well for on-site verification of the voltage transformer's accuracy. Nevertheless, voltage transformers should be tested once with high primary voltages before putting in service, since insulation faults for instance might not be detected by a modeling concept using low voltage and low frequency signals.
The obtained test results by VOTANO in regards to the voltage ratio error and phase displacement are shown in figure 18 to figure 21. The test had been conducted at 50Hz and 60Hz. At 100% of rated primary voltage and 100% of rated load the absolute difference in regards to the reference is 0.0042% in voltage ratio error and 0.75min in phase displacement. At 100% rated primary voltage and 0VA load the absolute difference is 0.0062% in regards to the voltage ratio error and 0.703min in phase displacement.
Power VA 1,0000 0,0000 VA [%] 100,0% 0,0% cos phi 1,0000 1,0000 Voltage ratio error in % of rated voltage 80% -0,0101% 0,0063% 100% -0,0118% 0,0046% 120% -0,0178% -0,0014%
Presentation 07.2.8
6 Literature
[1] VOTANO preliminary user manual [2] IEC 60044-2 Edition 1.2 / 2003-02 "Instrument Transformers, Part 2: Inductive voltage transformers", Reference number CEI/IEC 60044-2:1997+A1:2000+A2:2002 [3] IEC 60044-5 First Edition / 2004-04 "Instrument transformers, Part 5: Capacitor voltage transformers" Reference number CEI/IEC 60044-5:2004 [4] IEC 61869-3 Edition 1.0 / 2011-07 "Instrument transformers, Part 3: Additional requirements for inductive voltage transformers" [5] IEC 61869-5 Edition 1.0 / 2011-07 "Instrument transformers, Part 5: Additional requirements for capacitor voltage transformers" [6] IEEE "Standard Requirements for Instrument Transformers" IEEE Std C57.13TM-2008 [7] ANSI C93.1 1999 Requirements for PowerLine Carrier Coupling Capacitors and Coupling and Coupling Capacitor Voltage Transformers (CCVT)