No. Handling (Level) Plan (Rev .1e) Catch Up Schedule Actual Hand Over Duration (Day) Delayed (Day)

Descon is requested to complete concrete pouring for building slabs within strict timelines to avoid further project delays. They must pour and reach strength within 4 days for each slab and remove scaffolding once strength is reached. A schedule is provided detailing planned and actual pouring dates for the remaining slabs to be completed by early October. Confirmation of following the schedule is requested.

Uploaded by

Nguyen Chi Thanh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

No. Handling (Level) Plan (Rev .1e) Catch Up Schedule Actual Hand Over Duration (Day) Delayed (Day)

Descon is requested to complete concrete pouring for building slabs within strict timelines to avoid further project delays. They must pour and reach strength within 4 days for each slab and remove scaffolding once strength is reached. A schedule is provided detailing planned and actual pouring dates for the remaining slabs to be completed by early October. Confirmation of following the schedule is requested.

Uploaded by

Nguyen Chi Thanh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DearHien/Thong,

Becauseofdelayedforhandlingarea,WerequestthatDesconhavetohaveaquickactionto
completingandhandingovertoMeura.
Asyourconfirmation,youwillcompletingofeachslabwithin4dayswith7daysconcretestrength.And
Webelievedthatyoucancarryoutthiswork.
Therefore,weadvisethattheremainingslabsshouldbepouredconcreteastheplanbelow(orearlierif
any).

Pleasecheckandconfirmingtoussoon.

Furthermore,pleasearrangemanpowertoremove/dismantle/cleaningthescaffoldinguntilconcrete
strengthofslabhavereachedthestrength.

No.

Handling
(Level)

Plan
(Rev
.1e)

Actual

Hand
over

Duration

Delayed

(day)

(day)

19/08/13

16/09/13

Level +10.00

10/08/13

Level
+14.000

17/08/13

28/08/13

29/08/13

20/09/13

10

Level
+18.000

24/08/13

05/09/13

07/09/13

26/09/13

10

Level
+23.500

02/09/13

14/09/13

(14/09/13)

02/10/13

Level
+26.500

09/09/13

18/09/13

(18/09/13)

Level
+29.300

16/09/13

22/09/13

(22/09/13)

Wearewaitingforearlyfeedback.

Regard,
Nguyen Chi Thanh
Resident Engineer, Industry, Energy & Mining

Catch up
schedule