The document outlines the submission timeline for projects offered in Spring 2014, including the phases, deliverables, descriptions, and due dates. Students must submit a Software Requirements Specification document by June 25th that describes the project scope and requirements. By August 15th, a design document is due containing diagrams and designs. The final deliverable of the completed project, report, and presentation is to be submitted by January 20th, 2015.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
1K views
cs619 Final Project
The document outlines the submission timeline for projects offered in Spring 2014, including the phases, deliverables, descriptions, and due dates. Students must submit a Software Requirements Specification document by June 25th that describes the project scope and requirements. By August 15th, a design document is due containing diagrams and designs. The final deliverable of the completed project, report, and presentation is to be submitted by January 20th, 2015.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
Submission Timeline for Projects Offered in Spring 2014
Jun Jul Aug Sep Oct Nov Dec
Jan 2015 2015 1-SRS Last Date: 25/6/2014 2014 Phase: Gathering & Analyzing Requirement Deliverable: SRS Document Description: Describes the scope of the project, functional & non-functional requirements, use case diagram(s), usage scenarios, Adopted Methodology, Work Plan (Gantt Chart). Phase: Final Deliverable Deliverable: Final Deliverable Description: i. Complete Project (Code & Database) ii. Final Report iii. Final Presentation Phase: Analysis & Design Phase Deliverable: Design Document Description: Sequence diagrams, Architecture Design Diagram, ERD if the project domain requires, Class Diagram, Interface Design, Database Design (if the project domain requires database), Test Cases. Last Date: 15/8/2014 2-Design 3-Final Deliverable Last Date: 20/1/2015