0% found this document useful (0 votes)
91 views1 page

3-Platform Column Pylon

This document provides an estimate for scaffolding and platform materials needed for a bridge project. It includes a table listing the various parts and materials needed, such as climbing scaffolds, brackets, handrails, platforms, pipes, bolts and other accessories. The table provides details of the quantity, unit price and total price for each item. It estimates a total cost of $135,331,200 for the climbing platforms, $1,833,600 for pin accessories, $12,776,400 for pipe bracing, and $2,347,200 for pipe bracing accessories, along with costs for other items, for an overall estimated total of $162,218,400.

Uploaded by

Anwar Haryono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views1 page

3-Platform Column Pylon

This document provides an estimate for scaffolding and platform materials needed for a bridge project. It includes a table listing the various parts and materials needed, such as climbing scaffolds, brackets, handrails, platforms, pipes, bolts and other accessories. The table provides details of the quantity, unit price and total price for each item. It estimates a total cost of $135,331,200 for the climbing platforms, $1,833,600 for pin accessories, $12,776,400 for pipe bracing, and $2,347,200 for pipe bracing accessories, along with costs for other items, for an overall estimated total of $162,218,400.

Uploaded by

Anwar Haryono
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project

No. Offer
Date
Subject
Area
Customer
Location

:
:
:
:
:
:
:

Jembatan Rokan 1&2


BAFH - 0904
7-4-2009
Platform for Column 300/150/410 ( Lwr & Up )
Pylon2
PT. Waskita Karya
Rokan Hilir-Riau
Estimation Result

File : G:\Sales\Offer\2009\0904\Cost\[ROKAN BRIDGE (R0, 07.04).xls]PF1

D E S C R I P T I O N

No

1
2
3
4
5
6
7

1
2

1
2

1
2
4
5
6

1
2
3

1
2
3
4

Climbing Scaffold KG200/150


Climbing Bracket KG 200
Wall Scaffold Hinge WGS
Hand Rail Post 125 KG
Suspended Platform KG 200
Climbing Cone-2 M 24 / DW 15, galv.
Articulated Joint 24
Base Plate for KG 200
TOTAL
Pin Accessories
Pin D 16x65/86, galv
Cotter Pin FS 4/1, galv
TOTAL
Pipe Bracing
3,000 STK400, galv
Pipe RO 48,3 x 3,2 L =
TOTAL
Pipe Bracing Accessories
Swivel Coupl DK1 48/48, galv
Screw On Coupling 48, galv
TOTAL
Bolt & Nut for KG
40 - 8,8
Hex Bolt M 8 x
90 HTB
Hex Bolt M20 x
70 HTB
Hex Bolt M24 x
Hex Nut M8
Hex Nut M20
TOTAL
Vario Consumable Part
Coach Screw 8x60 DIN 571, galv
F.H Bolt M8 x 70 W.Nut
Tie Rod DW 15 Spec. Length per 50 cm (Bengkok)
TOTAL
Accessories Platform Beam BR
Crane Eye for Platform BR 0.4T
Gravity Pivot Plate
Spacer for Platform BR
Hook Strap HB , galv
TOTAL
BR Shaft Platform
195 cm
Platform Beam BR U100 TOTAL

Part
No

PERI Climbing Platform


Total
Total
Climbing Platform
KG200
UBR
Qty
Qty
Add.
( set )
( set )
( set )
1
1
2
6

Rev. : 0

Unit
Sales
Price
( Rp. )

Total
Rental
Price
(Rp/Mth)

Sales
Price
( Rp. )

Rental
Price
(Rp/Mth)

B10375
026110
026120
B10385
631220
027030
B10805

2
4
4
2
4
2
2

24
48
48
24
48
24
24

2,043,500
233,800
216,300
1,085,600
228,700
880,700
271,400

104,200
12,000
11,000
55,300
17,500
44,900
20,100

49,044,000
11,222,400
10,382,400
26,054,400
10,977,600
21,136,800
6,513,600
135,331,200

2,500,800
576,000
528,000
1,327,200
840,000
1,077,600
482,400
7,332,000

018050
018060

8
8

96
96

17,500
1,600

1,800
400

1,680,000
153,600
1,833,600

172,800
38,400
211,200

B10520

36

354,900

21,100

12,776,400
12,776,400

759,600
759,600

017010
B17040

2
4

24
48

32,600
32,600

2,400
2,400

782,400
1,564,800
2,347,200

57,600
115,200
172,800

7CA0 190
7CH0 200
026430
024090
710334

96
20
48
96
20

1,600
16,500
24,300
1,000
4,100

153,600
330,000
1,166,400
96,000
82,000
2,836,000

12

192
24
288

1,300
2,100
23,100

249,600
50,400
6,652,800
6,952,800

020610
020600
020620
024110

4
4
12
6

8
8
24
12

96,800
452,200
33,000
36,800

020320

1,158,900

024270
024140

10
4
8
10

16
4

5,300
23,100
1,700
1,900

774,400
3,617,600
792,000
441,600
5,625,600

42,400
184,800
40,800
22,800
290,800

4,635,600
4,635,600

edk/try

Mark01-A2R1

PL09-R0
Approved by :

Signature
Name
Date

Checked by :

Made by :