BOQ for Lafarge Chain Link Fence

This document provides a bill of quantities for Lafarge chain link fence works. It includes 3 sections: civil works for corner, straining, and intermediate posts; chain link materials such as barbed wire and mesh; and gate works. The civil works section details the excavation, concrete, formwork and fabrication for installing the fence posts. It estimates a total of 10 corner posts, 7 straining posts and 84 intermediate posts. The chain link materials section estimates quantities for barbed wire, mesh, tension wire and bolts. The gate works section provides excavation, concrete and fabrication costs to install a single gate. The overall grand total cost for the fence and gate works is estimated to be ₦2,493,

Uploaded by

abhi_ak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views4 pages

BOQ for Lafarge Chain Link Fence

This document provides a bill of quantities for Lafarge chain link fence works. It includes 3 sections: civil works for corner, straining, and intermediate posts; chain link materials such as barbed wire and mesh; and gate works. The civil works section details the excavation, concrete, formwork and fabrication for installing the fence posts. It estimates a total of 10 corner posts, 7 straining posts and 84 intermediate posts. The chain link materials section estimates quantities for barbed wire, mesh, tension wire and bolts. The gate works section provides excavation, concrete and fabrication costs to install a single gate. The overall grand total cost for the fence and gate works is estimated to be ₦2,493,

Uploaded by

abhi_ak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

BOQ FOR LAFARGE CHAIN LINK FENCE WORKS (INTERNAL COST)

S/N
A
i
ii
iii
a)
b)
iv
v
vi
vii

DESCRIPTION
Civil Works
Corner Post complete with Stay posts
Excavation
Level and compact bottom of excavations to
receive concrete
Concrete
50 mm thick blinding (1:4:8)
Footing and Column (1:3:6)
Backfilling and cartaway
Form Work
Corner Post (50x50x6 mm) with galvanizing
and fabricaiton
Stay Posts (50x50x6 mm) with galvanizing
and fabrication
SUB TOTAL

Straining Post Complete with Stay Post

Excavation
Level and compact bottom of excavations to
receive concrete
Concrete
50 mm thick blinding (1:4:8)
Footing and Column (1:3:6)
Backfilling and cartaway
Form Work
Straining Post (50x50x6 mm) with
galvanizing and fabricaiton

ii
iii
a)
b)
iv
v
vi
vii
C
i
ii
iii
a)
b)
iv
v
vi
2
a

Stay Post (50x50x6 mm) with galvanizing


and fabrication
SUB TOTAL
Intermediate Post
Excavation
Level and compact bottom of excavations to
receive concrete
Concrete
50 mm thick blinding (1:4:8)
Footing and Column (1:3:6)
Backfilling and cartaway
Form Work
Intermediate Post (50x50x6 mm) with
galvanizing and fabricaiton
SUB TOTAL
Chain Link Materials
Galv Barbed Wire SWG 14 with points at 3
inches apart

UOM

QTY

Nos

10.00

Nos

10.00

Nos
Nos
Nos
Nos

10.00
10.00
10.00
10.00

Nos

10.00

Nos

10.00

Nos

7.00

Nos

7.00

Nos
Nos
Nos
Nos

7.00
7.00
7.00
7.00

Nos

7.00

Nos

7.00

Nos

84.00

Nos

84.00

Nos
Nos
Nos
Nos

84.00
84.00
84.00
84.00

Nos

84.00

900.00

b
c
d
3
i
ii
iii
iv
v

Galv chain link 3" Diamond wire mesh


sq m
guage 10
4 mm dia GI Tension wire
m
12 mm dia GI Bolt and nut
Nos
SUB TOTAL
GATE WORKS
Excavation
Cum
Level and compact bottom of excavations to
LS
receive concrete
Concrete
1:3:6
cum
Backfilling and cartaway
cum
Fabrication & Installation of Gate with
LS
Wheels and ---SUB TOTAL
GRAND TOTAL

720.00
900.00
100.00

4.00
1.00
3.01
4.00
1.00

ORKS (INTERNAL COST)


RATE

202.15

TOTAL

2,021.46
-

317.52
2,320.99
151.61
3,262.50

3,175.20
23,209.88
1,516.09
32,625.00

8,400.00

84,000.00

7,350.00

73,500.00
220,047.62

165.39

1,157.74
-

317.52
2,320.99
151.61
2,952.00

2,222.64
16,246.91
1,061.26
20,664.00

8,400.00

58,800.00

7,350.00

51,450.00
151,602.56

202.15

16,980.23
-

317.52
2,320.99
151.61
2,610.00

26,671.68
194,962.95
12,735.17
219,240.00

8,400.00

705,600.00
1,176,190.04

12.00

10,800.00

10,800.00
1,000.00

4,000.00
-

26,000.00
750.00

78,260.00
3,000.00

850,000.00

850,000.00
935,260.00
2,493,900.22