Dr. Rhea Mar A. Angtud: Cebu City Don Carlos A. Gothong Memorial National High School

The principal of Cebu City Don Carlos A. Gothong Memorial National High School writes to inform the Schools Division Superintendent of the planned construction of a new Multi-Purpose Assembly Hall starting in August 2014. Additionally, the principal requests that the existing stage, which was newly renovated in March 2014, be preserved and that the construction project only connect to the existing structure to avoid demolishing parts of it.

Uploaded by

John Carter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
781 views1 page

Dr. Rhea Mar A. Angtud: Cebu City Don Carlos A. Gothong Memorial National High School

The principal of Cebu City Don Carlos A. Gothong Memorial National High School writes to inform the Schools Division Superintendent of the planned construction of a new Multi-Purpose Assembly Hall starting in August 2014. Additionally, the principal requests that the existing stage, which was newly renovated in March 2014, be preserved and that the construction project only connect to the existing structure to avoid demolishing parts of it.

Uploaded by

John Carter
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Department of Education
Region VII, Central Visayas
Division of Cebu City
CEBU CITY DON CARLOS A. GOTHONG MEMORIAL NATIONAL HIGH SCHOOL
C. Padilla St., Cebu City

June

18,

2014
DR. RHEA MAR A. ANGTUD
Schools Division Superintendent
Cebu City
Thru: Emmanuel G. Pepito
DEPED Physical Facilities Coordinator
Sir:
I have the honor to inform your good office for the implementation of
the Construction of Multi-Purpose Assembly Hall (AB2011 LDS-LSA for other
Bgy Projects 9999-300-290-001-021-2011) this coming August 2014.
Furthermore, We would like to request the following.
a.) That the affected existing stage will be preserved for it is newly
renovated last March 2014.
b.) That the project will be connected only to the existing structure to
avoid demolation of the later.
I hope that these request be given consideration.

Respectfully Yours,
BENEDICTA B. ARCILLA