0% found this document useful (0 votes)
805 views2 pages

SPT Correction Table

This document provides soil test data from borehole BH-2 in Fazilpur, D.G. Khan, including bulk density, water level, average energy ratio and dynamic efficiency values used in Pakistan according to a cited research paper. The document also includes soil test data from 4 depths, listing effective overburden pressure, rod length, sampler, corrections for hammer energy, overburden pressure, borehole diameter, and observed and corrected SPT N-values.

Uploaded by

Faisal Sardar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
805 views2 pages

SPT Correction Table

This document provides soil test data from borehole BH-2 in Fazilpur, D.G. Khan, including bulk density, water level, average energy ratio and dynamic efficiency values used in Pakistan according to a cited research paper. The document also includes soil test data from 4 depths, listing effective overburden pressure, rod length, sampler, corrections for hammer energy, overburden pressure, borehole diameter, and observed and corrected SPT N-values.

Uploaded by

Faisal Sardar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Fazilpur, D.G.

Khan

Bulk Density =
Water Level =

17.28 kN/m3
3.1 m

Ave. Energy Ratio in Pak. According to Skempton (1986) =


Dyn. Efficiency in Pak. According to Skempton (1986) =
Standard Energy Ratio Value Used =
Research Paper (Ref: Geotechnique 36, No.3,425-447,Page-431)
Sr

Depth

Eff. Overburden
Pressure

No

(m)

kN/m2

Rod
Length

Sampler

85 (Donut Hammer)
0.7
70

Borehole
Diameter

Correction Correction Correction

Hammer
Energy

Eff. Overburden
Pressure

Observed
SPT

Ratio

Correction

N - Value

3.015
1.907
1.508
1.314

6
2
2
10

Borehole # BH-2
1
2
3
4

0.60957
1.52393
2.43828
3.35264

10.53
26.33
42.13
55.46

0.75
0.75
0.75
0.75

1
1
1
1

1
1
1
1

0.850
0.850
0.850
0.850

Corrected
SPT
N1(70)
12
2
2
8

You might also like