Speedtronic™ Mark VI Turbine Control: Software Maintenance
Speedtronic™ Mark VI Turbine Control: Software Maintenance
GE Industrial Systems
Publication: GEJ-7485
Original Issue Date: 2000-07-20
SPEEDTRONIC
Mark VI Turbine Control
Software Maintenance
Introduction
This quick reference guide provides a brief set of procedures
for frequently used Mark VI maintenance tasks. It presumes
that the user possesses at least a medium-level knowledge of
the software used.
Conventions
Arial Bold
Indicates a procedure.
>
Procedure
Page
GEJ-7485
Mark VI Maintenance 1
Procedures
To Validate, Build, and Download
After making any change to the configuration code you must
perform the following commands for the changes to take
effect in the controller.
1.
Select Validate
2.
Select Build
3.
Select Download
2 Mark VI Maintenance
GEJ-7485
1.
2.
3.
4.
5.
6.
GEJ-7485
Mark VI Maintenance 3
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. If a new board was added, select the board and download
the configuration (click the right-mouse button and select
Download).
4 Mark VI Maintenance
GEJ-7485
An instanced
module is from a
Module
Definition.
1.
2.
3.
4.
GEJ-7485
Mark VI Maintenance 5
1.
2.
3.
4.
Put all signals into the database (Device > Put into
database > Full).
5.
6.
7.
8.
9.
Get all signals from the database (Device > Get from
database > Full).
6 Mark VI Maintenance
GEJ-7485
1.
2.
3.
4.
Put all signals into the database (Device > Put into
database > Full).
5.
6.
7.
GEJ-7485
8.
9.
Stop
and start
the project.
Mark VI Maintenance 7
1.
2.
3.
Put all signals into the database (Device > Put into
database > Full).
4.
5.
6.
7.
8.
Stop
and start
the project.
b.
c.
8 Mark VI Maintenance
GEJ-7485
1.
2.
3.
4.
5.
6.
7.
Stop
8.
Select Services.
9.
10. Run
GEJ-7485
Mark VI Maintenance 9
1.
2.
3.
From DOS:
4.
5.
6.
Stop
7.
Select Services.
8.
9.
Run
10 Mark VI Maintenance
GEJ-7485
1.
2.
Put the new signals into the database. (Device > Put into
database > Full)
3.
4.
5.
6.
Stop
and start
the project.
7.
8.
9.
GEJ-7485
Mark VI Maintenance 11
1.
2.
3.
Add this signal to the EGD page. Make sure the point
direction is Write and you have entered a valid
CIMPLICITY resource ID.
4.
Put the new signals into the database. (Device > Put into
database > Full)
5.
6.
7.
8.
9.
Stop
and start
the project.
GEJ-7485
GEJ-7485
Mark VI Maintenance 13
If your help files do not work, select the Options menu and
Settings, and the tab Directories. Make sure that the Mark
VI controller product library is set to C:\Program Files\GE
Control System Solutions\MarkVI.
Related Publications
In addition to this quick reference guide, other related
publications are available as follows:
14 Mark VI Maintenance
GEJ-7485
*(,QGXVWULDO6\VWHPV
*HQHUDO(OHFWULF&RPSDQ\
5RDQRNH%OYG
ZZZ*(LQGXVWULDOFRP
6DOHP9$86$