Imported Items Shipment Details: PO PO# Date Supplier

This document contains details of 30 imported shipment items for a NYA CONGO PRO imported items project. It lists the project department, item descriptions, quantities, purchase order numbers, dates, suppliers, shipment dates, estimated times of arrival, actual delivery dates, and remarks for each item. The items include construction equipment, materials, and machinery for various project departments including civil works, mechanical works, and mining. The status and progress of each shipment is noted in the remarks column.

Uploaded by

mkpasha55mp
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views

Imported Items Shipment Details: PO PO# Date Supplier

This document contains details of 30 imported shipment items for a NYA CONGO PRO imported items project. It lists the project department, item descriptions, quantities, purchase order numbers, dates, suppliers, shipment dates, estimated times of arrival, actual delivery dates, and remarks for each item. The items include construction equipment, materials, and machinery for various project departments including civil works, mechanical works, and mining. The status and progress of each shipment is noted in the remarks column.

Uploaded by

mkpasha55mp
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

NYA CONGO PRO

IMPORTED ITEMS SHIPM


PO
Sr # Deptt

Description

Qty

PO #

DATE

Supplier

Civil

2 batching plants- 1 mob concrete pump

9X40

XCMG1408-092A

11-Jun-14

XCMG

Civil

1stat concrete pump-6 transit mixture

7 PCES

XCMG1408-092B

11-Jun-14

XCMG

Civil

PLYWOOD

2X40

DHNYA 002A

1-Aug-14

UTC

Civil

OTHER WOOD

10X40

DHNYA 002B-1

1-Aug-14

UTC

Civil

OTHER WOOD

2X40'

DHNYA 002B-2

1-Aug-14

UTC

Civil

OTHER WOOD

2X40'

DHNYA 002B-3

1-Aug-14

UTC

Civil

OTHER WOOD

4X40'

DHNYA 002B-4

1-Aug-14

UTC

Civil

OTHER WOOD

3X40'

DHNYA 002B-5

1-Aug-14

UTC

Civil

STEEL BARS (500 Ton)

19X40'

DHNYA 001

7-Aug-14

UTC

10

Civil

STEEL BARS (1300 Ton)

1300T

NC

7-Aug-14

UTC

11
12

Civil
Mech

SCAFFOLDING PIPES
COAL SHED PREFAB BULD

662 MT
40X40'

DHNYA 003
91-483/07

15-Aug-14
15-Aug-14

UTC
KIRBY

13
15

Mech
Civil

COAL SHED PREFAB BULD


BLOCKS MAKING MACHINE

40X40'
1

91-483/07
HQ 38193-DF

15-Aug-14
1-Aug-14

KIRBY
HYDRAFORM

16

Civil

PILLING MACHINES

4X20'

000101/08/2014

17-Jul-14

LUCKY CEMENT

17

Civil

PILLING MACHINES

4X20'

NC

17-Jul-14

LUCKY CEMENT

18

Civil

SCAFFOLDING JOINT

5X20'

000103/09/2014

1-Aug-14

LUCKY CEMENT

19

Civil

2X20

000102/09/2014

1-Sep-14

LUCKY CEMENT

20

Mech

6X40

91-486/04

16-Sep-14

KIRBY

BLOCK MAKING MACHINE&MIXER MACHINE


PREFAB. SHED (ACCOMMODATION)

21

Mech

PREFAB. SHED (ACCOMMODATION)

6X40

91-486/04

16-Sep-14

KIRBY

22

Mech

PREFAB. SHED (ACCOMMODATION)

6X40

91-486/04

16-Sep-14

KIRBY

23

Civil

SRC CEMENT 600 MTNS

23X20

51

12-Nov-14

HEXAGON

24

Civil

SRC CEMENT 1204 MTNS

43X20

LCL/EXP/3769

1-Nov-14

25

Civil

CUTTING&BENDING MACHINES

2 UNITS

2014DEV1029NCQG 29-Oct-14

LUCKY CEMENT
BEIJING DEV IMP
EXP CORP

26

QC

Lab Testing Equipment

19748/2014

1-Oct-14

Matest

27

Elect.

Generators 500kVA

2Units

23-Nov-14

BIA

28

Mech.

Hydraulic Tower crane

1 Nos

29

Mech.

Tower Crane 122mtr

1 Nos

30

Mining Earth Moving Machinery

Quot# XCMG-DRCNYA-13.9/28/2014

XCMG

GO PROJECT

S SHIPMENT DETAILS
Shipment
DateETS)

LC Date

DATE:14/1//2014

Actual
Shipment

ETA

Actual Delivery

Remarks

11-Jul-14

11-Sep-14

28-Nov-14

29/12/2014

RECEIVED/COMPLETED

11-Jul-14

6-Oct-14

28-Nov-14

25/12/2014

RECEIVED/COMPLETED

3-Sep-14

3-Sep-14

3-Nov-14

9/1/2015

RECEIVED/COMPLETED

3-Sep-14

18-Sep-14

18-Nov-14

13 -14/1/2015

6x40' RECEIVED

3-Sep-14

27-Sep-14

27-Nov-14

On way

3-Sep-14

20-Oct-14

20-Dec-14

On way

3-Sep-14

20-Nov-14

20-Jan-15

On way

3-Sep-14
26-Aug-14

2-Oct-14

Not yet shipped


30-Nov-14

6/1/2015

Supposed to be shipped
at 30-Sept-2014 but not
yet

?
26-Aug-14
30-Aug-14
29-Nov-14
29-Nov-14
1-Sep-14

14-Sep-14
14-Sep-14

30-Aug-14

9-Dec-14

30-Aug-14

18-Nov-14

10-Dec-14

30/12/2014

4-Oct-14

6-Dec-14

9/1/2015

1-Nov-14
?

30-Nov-14
30-Sep-14

On way
Not yet shipped

30-Aug-14

27-Oct-14

9-Oct-14
?

RECEIVED/COMPLETED

30-Dec-14

Not yet shipped


Received/COMPLETED
RECEIVED/COMPLETED
BIVAC Inspection is
Pending
on Way
Inspection Pending by
Lucky cement Team
Not yet Shipped

24-Nov-14

30-Sep-14

24-Nov-14

30-Sep-14

20-Nov-14

20-Nov-14

20-Dec-14

24/12/2014

Received/COMPLETED
Details awaited from
Lucky Cement

30/12/2014

Received/COMPLETED
LC Pending since 1st
October

?
15-Nov-14
?
30-Jan-15

15-Nov-14

Adv.Payment is pending
PO under approval
(Shipment after 2 month
of payment)
Under Technical
Recommendation
Quotation from Komatso
Awaited

jjvcffffffffffffffffffffffffff