Piping (Home Office) Labor Hour Estimating
Warning
This Excel Worksheet or Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells.
Other cells on this "Tool" includes locked "cells" that contain complex math formulas. Care should be taken to learn where these ce
are and if the spreadsheet is ever unlocked that the cells with the formulas are not disturbed. Disturbing or altering these cells may
render the "Tool" unable to function properly.
Introduction
This WorkBook "Tool" is part of a suite of 6 "Tools" that are intended to aid the Piping Engineering Lead (Senior Supervisor or
whatever he or she is called) who has the responsibility to make estimates, schedules, control the work, the hours, report the
progress and prepare & files the Final Job Report. These "Tools" are: (1) Piping Engineering & Design Scope of Work, (3) Piping
Labor Hour Estimating Forms, (3) Piping Control Level Schedule, (4) Physical Percent Complete Status Report, (5) Design Chan
Notice and (6) "Janus" Historical Data Log. These 5 WorkBook Tools are intended to be used as a "Set" and will bring value to your
effort only if you in fact use all of them.
Authors note: The information used in this example Labor Hour Estimate is pure fiction created by the author and any resemblance
real persons, projects, companies or places is coincidental.
#1
Study these instructions and all three of the WorkSheets of this WorkBook. If you have any questions about anything here please
contact me via E-mail ([email protected]) and I will help you.
#2
Make a Copy of the complete WorkBook and save it to your Project data base.
#3
The Prerequisite for the use of this tool is a completed and approved Scope of Work (SOW). Without an approved SOW it is not
possible to develop a Labor Hour Estimate because there is no definition of what is to be done.
#4
Start with the "Estimate Detail" sheet and enter the Project Number in the cell provided in the upper left corner. This number (and
others) will be transferred to the Estimate Summary sheet automatically
#5
Fill in the quantity of deliverables and activities. Use your "Approved" SOW for all the activities and deliverables. Start with the
"Default" hours and adjust up or down depending on the complexity that is expected.
#6
You can fill out almost the whole Estimate by only entering a value in the "Quantity" column. You do not need to enter a value in th
"Hours" column. The program automatinally uses the "Default" value.
#7
If you are not comfortable with the results using the "Default" value then you can enter a greater or lesser value in the "Hours"
column.
#8
When you have finished entering all the required data on the Estimate Detail sheet, look at the Summary sheet and finish the head
information (yellow cells). You will notice that all the Totals and Percantages have been transferred for you.
#9
Your next step will be the creation of your CLS (Control Level Schedule). To prepare for that collect the Operation Number/Activity
Code totals (example: the 251 A total, thew 251 B total, etc).
#10
At the end of the project collect the "actual" numbers for the number of deliverables and the hours it took to do the work. This
historical data will help you with the estimate for your next project.
Page 1
me Office) Labor Hour Estimating
d and password protected. The user may only enter date in the "yellow" cells.
at contain complex math formulas. Care should be taken to learn where these cells
e cells with the formulas are not disturbed. Disturbing or altering these cells may
that are intended to aid the Piping Engineering Lead (Senior Supervisor or
bility to make estimates, schedules, control the work, the hours, report the
These "Tools" are: (1) Piping Engineering & Design Scope of Work, (3) Piping
Level Schedule, (4) Physical Percent Complete Status Report, (5) Design Change
5 WorkBook Tools are intended to be used as a "Set" and will bring value to your
e Labor Hour Estimate is pure fiction created by the author and any resemblance to
cidental.
heets of this WorkBook. If you have any questions about anything here please
and I will help you.
it to your Project data base.
eted and approved Scope of Work (SOW). Without an approved SOW it is not
e there is no definition of what is to be done.
Project Number in the cell provided in the upper left corner. This number (and
y sheet automatically
se your "Approved" SOW for all the activities and deliverables. Start with the
on the complexity that is expected.
entering a value in the "Quantity" column. You do not need to enter a value in the
the "Default" value.
e "Default" value then you can enter a greater or lesser value in the "Hours"
ata on the Estimate Detail sheet, look at the Summary sheet and finish the header
e Totals and Percantages have been transferred for you.
ntrol Level Schedule). To prepare for that collect the Operation Number/Activity
otal, etc).
rs for the number of deliverables and the hours it took to do the work. This
ur next project.
Page 2
Activity Grouping
Supervision
Project Design Basis
Preliminary Design
Detailed Design
Acitivity
Code
Piping Group Time Charge Codes
Piping Sub-Group Operation Number & Name (*)
251
252
253
PME
PDG
PMC
250
PEL
Work Assignment,
Planning, Status Report
Meetings w/
Department, Project &
Client, Emp.. Perform.
Reviews, Technical
Direction, P&ID
Reviews
Work Assignment, Work
review, Meetings,
Status Reports, Emp..
Perform. Review, P&ID
Reviews
Work Assignment, Work
review, Meetings,
Status Reports, Emp..
Perform. Review, P&ID
Reviews
Work Assignment, Work
review, Meetings,
Status Reports, Emp..
Perform. Review, P&ID
Reviews
SOW, Labor Hour
Estimate, Control Level
Schedule, Collect,
Review and
Disseminate Client
Criteria, Coordinate
Vendor SQ CK, Field
Trips
Specifications,
Standards, Develop
CCC, Vendor Data SQ
CK
Specifications,
Standards, Plot Plan
Developm't, Vendor
Data SQ CK, Heat
Tracing Criteria, Field
Trips
Establish Mat'l Take-Off
Data Base, Define
Material "Bump"
Criteria,
Transpositions, Vessel
Orientations, Model
Index, Drawing Index,
Layout Studies,
Preliminary MTO &
RFQ
C
Model Reviews
SP Item Activities,
Model Reviews,
2D CADD, 3D CADD,
Manual Drawings,
Revise Exist.
Dwgs.,Model Reviews,
Intermediate MTO and
POR, Model Reviews
Construction Work
Packages (CWP)
Line List
Manual Isometrics,
CADD Isometrics,
Piping Plans, Piping
Sections, Isometric
Index, Tie-In Index,
Tie-In List, Tie-In Isos.,
Heat Tracing
Isometrics, Heat
Tracing Index, Demo
Dwg's,
Final MTO, PO
Supplements, Shortage
Reports, Overage
Reports,
Deliverables
Services
CADD Coordinator
(*) Definition of Piping Sub-Group Numbers & Names
250 - PEL = Piping Engineering Lead (See Company Job Description)
251 - PME = Piping Material Engineer (See Company Job Description)
252 - PDG = Piping Design Group (See Company Job Description)
253 - PMC = Piping Material Control (See Company Job Description)
254 - PSE = Piping Stress Engineering (See Company Job Description)
Page 3
ng Group Time Charge Codes
Piping Sub-Group Operation Number & Name (*)
254
PSE
Work Assignment, Work
review, Meetings,
Status Reports, Emp..
Perform. Review, P&ID
Reviews
Specifications,
Standards, Define Pipe
Stress Analysis Criteria,
Pre-Eng. Pipe Supports
Vendor Data SQ CK
Model Reviews, Pipe
Stress Analysis, Hanger
Data Sheets, Joint Data
Sheets, Review & Sign
Isometrics
Expansion Joint Dwgs,
Spring Hanger Dwgs,
Strut Dwgs.
ob Description)
ob Description)
Description)
b Description)
Job Description)
Page 4
PIPING ENGINEERING AND DESIGN __ SUMMARY OF HOME OFFICE LABOR AND COST ESTIMATE & FINAL REPORT
PROJECT NAME:
CLIENT:
LOCATION:
Temple Refinery Upgrade
PROJECT MANAGER:
Al Demming
ACME Products, LLC
PREPARED BY (LPE):
A. R. Tennyson
EST. LINE COUNT:
APPROVED BY:
A. G. Patterson
EQUIV. ISO. COUNT:
Anywhere,
PROJECT NO.:
2011-106
PLANT TYPE:
Refinery
EPCM
CONTRACT TYPE :
FINAL REPORT BY:
(EPC, EPCM, etc.)
PIPING ENGINEERING
OPER. No.
GROUP
DATE:
08/01/11
ESTIMATED
COMPUTER
EXPENSES $
$200MM
FINAL ISO COUNT :
APPV'D BUDGET
ESTIMATED
TRAVEL &
LODGING
EXPENSES $
BUDGET
LABOR
HOURS
ACTUAL
LABOR
HOURS
% OF TOTAL
772
2.79%
$500.00
$6,000.00
PIPING DESIGN
15340
55.45%
253
PIPE MATERIAL CONTROL
3800.5
13.74%
254
PIPE STRESS ENGR.
5624
20.33%
25536.2
% OF
TOTAL
FINAL REPORT
ESTIMATED
LABOR HOURS
252
2160
DISCIPLINE ESTIMATE
PIPE MATERIAL ENGR.
SUB TOTAL TECHNICAL LABOR HRS =
EST. TIC: ($MM)
REV.:
251
900
% OF TOTAL
0
$1,000.00
$0.00
$7,500.00
250
LPE, DEPT. & STAFF
2127
7.69%
ALL
TOTAL LABOR HOURS
27663.6
100 %
100 %
100 %
HRS/ISO=
12.81
HRS/ISO=
#VALUE!
HRS/ISO =
#VALUE!
REMARKS:
PIPING ENGINEERING & DESIGN HOME OFFICE LABOR, EXPENSE ESTIMATE DETAIL
PROJECT NO.
PLEASE NOTE
Only the yellow boxes are for data entry
2011-106
251. . . . P I P I N G M A T E R I A L E N G I N E E R I N G
SPECIFICATIONS
SPEC NO.
ESTIMATE
QUANTITY
HOURS
DEFAULT
LABOR HRS
PIPING MAT'L LINE CLASS NOTES & DATA
Review Existing
4.00
20
INDIVIDUAL LINE CLASS SPECS
Review Existing
22
20
110
PURCHASE (PIPE, VALVES, FITTINGS, ETC.)
52001 to 52010
10
50
TESTING, CLEANING, PASSIVATING
20
SP ITEM - SPEC, LIST, & DATASHEETS
80
ISULATING,PAINTING,COATING,LINING
20
WELDING / NDE
20
52024
20
53
TOTAL NUMBER OF SPECIFICATIONS AND HOURS
244
ACTIVITIES
B
PROJECT COMMODITY CATLAOG
LINE LIST / INDEX - DEVELOP & MAINTAIN
LABOR HRS
8
EST. LINE COUNT
900
SUPERVISION
252--PIPING MATERIAL ENGINEERING TOTALS - HRS
0.5
450
458
SUB-TOTAL ACTIVITY MAN HOURS
A
TOTAL LABOR
HRS
10%=
70.2
AJUSTMENT
70.2
772
2011-106
252 . . . . P I P I N G D E S I G N
ESTIMATE
ACTIVITY
DRAWINGS/DOCUMENTS
SCALE
( DWG. SIZE= A - B - C - D - E )
(OPTIONAL)
SIZE
(OPTIONAL)
NUMBER
HOURS
OF
PER
DEFAULT
ITEMS
ITEM
HRS
LABOR HRS
40
100
40
20
20
40
400
TRANSPOSITION LAYOUTS (NON CAD)
LAYOUTS, STUDIES, VESSEL ORIENTATIONS
LOCATION CONTROL PLANS (LCP)
40
120
120
PLOT PLANS (SITE AND/OR UNIT)
80
100
240
PIPING INDEX ( PLANS, MODEL, TIE-IN )
20
40
DRAWING /VENDOR PRINT SQ. CK.
200
200
PIPING PLAN DRAWINGS ( 2D/MANUAL)
141
3D MODELING - EQUIPMENT
250
1500
3D MODELING - PIPE LINES
710
2840
PIPING STANDARD & DETAIL DRAWINGS
40
HEAT TRACE DRAWINGS (PIPING ONLY)
4.25
DEMOLITION DRAWINGS ( NON-CAD)
15
ISOMETRICS (NEW LINES & TIE-INS)
300
8.25
2475
PIPING PLAN DRAWINGS (REV EXIST'G)
40
1200
PIPING PLAN - AS-BUILTS *
20
EXTRACT PLAN DRAWINGS - 3D
20
250
EXTRACT ISOMETRICS - 3D
1800
1800
SUB-TOTAL DRAWING QUANTITIES AND LABOR HOURS
3374
VARIOUS
N/A
VARIOUS
60
20
0
25
10
11105
TOTAL LABOR
HRS
SPECIFICATIONS
SPEC NO.
QUANTITY
HRS. PER.
DEFAULT
HRS
10
DESIGN, LAYOUT & DRAWING
SHOP FABRICATION
51025
10
10
FIELD FABRICATION
51026
10
10
TIE INS
51045
10
10
GEOGRAPHIC COLOR CODE
10
HEAT TRACING
10
0
30
SUB-TOTAL NUMBER OF SPECIFICATIONS AND LABOR HOURS
ACTIVITY
QUANTITY
HRS. PER.
DEFAULT
HRS
DESIGNER FIELD TRIPS
DAYS / HOURS
TIE IN LIST
No TIE-INS/ HRS PER
30
30
CAD COORDINATOR
WEEKS / HOURS
17
40
680
2100
2100
ISOMETRIC DRAWING LIST/INDEX
ISOMETRIC
COUNT
2810
SUB-TOTAL ACTIVITY LABOR HOURS
A
SUPERVISION
251 - PIPING DESIGN TOTALS - DWGS, SPECS, LABOR HOURS
10%=
1394.5
AJUSTMENT=
1394.5
15340
2011-106
253 . . . . P I P I N G M A T E R I A L C O N T R O L
ESTIMATE
ACTIVITIES
QUANTITY
HRS. PER.
DEFAULT
HRS
60
180
0.5
1050
MATERIAL MANAGEMENT CRITERIA, P&ID REVIEW
MAT'L TAKEOFF (PRELIM) & RFQ
PER EQIV. ISO
2100
MAT'L TAKEOFF (INTERMEDIATE) & PO
PER EQIV. ISO
2100
0.5
1050
MAT'L TAKEOFF (FINAL,MANUAL) & SUPPL.
PER ISO
550
0.5
275
MAT'L TAKEOFF (FINAL, DOWNLOAD) & SUPPL.
PER ISO
1800
0.5
900
MATERIAL OVERAGE?SHORTAGE REPORTS.
PER RFQ/PO,
ETC
80
0
3455
SUB-TOTAL ACTIVITY MAN HOURS
A
SUPERVISION
253 - PIPING MATERIAL CONTROLS TOTAL - LABOR HRS
TOTAL LABOR
HRS
10%=
345.5
AJUSTMENT=
345.5
3800.5
2011-106
254. . . . P I P E S T R E S S E N G I N E E R I N G
SPECIFICATIONS
SPEC NO.
ESTIMATE
QUANTITY
HOURS
DEFAULT
LABOR HRS
ANALYSIS
54001
20
20
PRE ENG & ENG SUPPTS
54040
20
20
COMPONENTS (EXP JTS, STRUTS, ETC)
10
OTHER
20
0
40
TOTAL NUMBER OF SPECIFICATIONS AND MAN HOURS
ACTIVITIES
D
STRESS ANALYSIS ACTIVITIES
STRESS ANALYSIS PRODUCT DRAWIBGS
TOTAL LABOR
HRS
DEFAULT
LABOR HRS
500
10
5000
10
80
QUANTITY
HRS. PER LINE
ACTUAL
HRS. PER
PRODUCT
ACTUAL
HOURS
SUB-TOTAL ACTIVITY LABOR HOURS
A
SUPERVISION
254 - PIPE STRESS ENGINEERING TOTAL -LABOR HRS
10%=
504
AJUSTMENT=
504
5624
TECH. TOTAL
25536.20
2011-106
250 . . . . L E A D P I P I N G E N G I N E E R
NUMBER
HOURS
DEFAULT
LABOR HRS
DAYS
26
104
EACH
17
20
340
PEOPLE
40
DAYS
DAYS
35
70
DAYS
130
260
WEEKS
26
40
1040
ACTIVITIES
B
LPE FIELD TRIPS - PRELIM. JOB SITE SURVEY
CONSTRUCTION WORK PACKAGE PREP
TRIPS - CONSTRUCTION SUPPORT
TRIPS - PIPE FAB SHOP SURVEY ( INSPECT./QUALIFY)
DEPARTMENT MANAGEMENT REVIEWS
TECHNICAL SUPPORT ACTIVITIES
TECHNICAL AIDE
FRONT END PLANNING (SCOPE, EST, ETC)
SUPERVISION / COORDINATION / MEETINGS
PEOPLE
WEEKS x 40
HRS
Q.A. AUDIT
ACTIVITIES
PEOPLE
WEEKS x 40
HRS
250 - LEAD PIPING ENGINEER & STAFF -TOTAL LABOR HRS
"X" = Activity that is required but will be handled under a different budget.
ESTIMATE
TOTAL LABOR
HRS
120
10%=
193.4
193.4
AJUSTMENT=
FLWB
PROJECT OR JOB TOTAL
2127
27663.6
AIL
NOTES:
2.8%
NOTES:
55.5%
NOTES:
13.7%
NOTES:
20.3%
NOTES:
7.7%
100
PIPING ENGINEERING & DESIGN FINAL REPORT DETAIL
The area below is to be used only at
the end of the project to record the
historical actual data.
2011-106
FINAL
QUANTITY
LABOR HRS
TOTAL
LABOR HRS
0
LABOR HRS
ACTUAL.
LINE No. =
2011-106
FINAL
SIZE
SCALE
NUMBER
AVG. HOURS
OF
OF
PER
LABOR
DRAWINGS
DRAWINGS
DRAWING
HRS
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
TOTAL
LABOR HRS
QUANTITY
HRS
QUANTITY
HRS
2011-106
FINAL
QUANTITY
LABOR HRS
TOTAL
LABOR HRS
2011-106
FINAL
QUANTITY
HRS
TOTAL
LABOR HRS
0
HRS
0
2011-106
FINAL
LABOR HRS
TOTAL
LABOR HRS
0
0
100