0% found this document useful (0 votes)
107 views2 pages

Piyush Mishra

Piyush Mishra is seeking an assignment in electrical engineering, projects, maintenance, or operations. He has a B.Tech degree in electrical and electronics engineering from University of Utter Pradesh technical University. He has professional experience commissioning and testing equipment on a 12 MW power plant project. His skills include commissioning drives and testing various temperature measuring instruments used in power plants. He is currently the shift incharge electrical at a 8MW power plant.

Uploaded by

piyushmishra19
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views2 pages

Piyush Mishra

Piyush Mishra is seeking an assignment in electrical engineering, projects, maintenance, or operations. He has a B.Tech degree in electrical and electronics engineering from University of Utter Pradesh technical University. He has professional experience commissioning and testing equipment on a 12 MW power plant project. His skills include commissioning drives and testing various temperature measuring instruments used in power plants. He is currently the shift incharge electrical at a 8MW power plant.

Uploaded by

piyushmishra19
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

PIYUSH MISHRA

Mo. 09754388111
Email [email protected]
[email protected]

Objective :- Assignment in Electrical Engineering , project, maintenance & operation.

Academic & Professional Attainment:-

• B.Tech degree in electrical & electronics engineering in 2006, University of Utter

Pradesh technical University, Lucknow (U.P.).

• Project engineer.

Professional Experience Summary:-

1. Construction supervision & equipment test experience gained on 12 MW power

plant project (C.F.B.C. Boiler)

2. Project engineering skills acquired as company representative in 12 MW power

plant project.

3. Drive commissioning ( Micro Master 440, Sinamic G130.

4. Maintenance of three phase Induction Motor and Transformer.

5. Commissioning of Air Cooled Condenser.

6. Commissioning of Turbine./boiler commissioning.

7. Testing of different type of temperature measuring Instruments which is used in pawer

Plant. ( RTD- PT100, THERMOCOUPLE, THERMISTER )

8. Control and Power Wiring of Star-Delta Starter, Direct Online Starter Feeder.

9. 132kv/11kv substation commissioning..


Working Profile I have completed 12 MW power plant project inSHRI

NAKODA ISPAT LTD.since june. 2006 to march

2009 from electrical side

Currently I am looking operation & maintance of 8MW

power plant in ALOK FERRO & POWER LTD from

electrical side. It is a unit of Hira Group of

Industries,Raipur(C.G)

Designation: Shift Incharge Electrical

Personal Details :-

Father’s Name : Shri Jawahar lal Mishra

Date of Birth : 20.10.1985

Sex : Male

Nationality : Indian

Marital Status : Single

Language known : Hindi English

Permanent Address : Piyush Mishra

131 A/ 90/ 1 A Malakraj New Bairahana Allahabad

Pin. 211003,.

I consider myself familiar with Electrical Engineering Aspects. I am also confident of my

ability to work in a team.

I hereby declare that all the information furnished above is true and correct to the best of my

knowledge

Thanking you.

Place : Allahabad (Piyush Mishra)

You might also like