RFI for Piping Inspection Request

This document is a request for inspection of piping pre-installation work at the Samsung Laydown Area 35 site for the Clean Transportation Fuels project at Riyadh Refinery. The contractor has verified that the work is ready for inspection and meets the requirements of specification SATIP-L-350-01 section 3.1. An inspector from the Project Inspection Unit, Mr. Sajeev, is requested to perform the inspection on February 2nd, 2015 at 9:00 AM. The form was received by Mr. Sajeev and notes that his signature only acknowledges receipt of the request, not approval or disapproval of the work.

Uploaded by

muhammedemraan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
273 views2 pages

RFI for Piping Inspection Request

This document is a request for inspection of piping pre-installation work at the Samsung Laydown Area 35 site for the Clean Transportation Fuels project at Riyadh Refinery. The contractor has verified that the work is ready for inspection and meets the requirements of specification SATIP-L-350-01 section 3.1. An inspector from the Project Inspection Unit, Mr. Sajeev, is requested to perform the inspection on February 2nd, 2015 at 9:00 AM. The form was received by Mr. Sajeev and notes that his signature only acknowledges receipt of the request, not approval or disapproval of the work.

Uploaded by

muhammedemraan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

REQUEST FOR INSPECTION

Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department)


BI

10-00741

JO

SO2636

Ref:
Phase

To : Project Inspection Unit/Mr.

Sajeev

Inspection /monitoring is required on (date)

2-Feb-15

Title
Civil
at (time)

9:00 AM

Clean Trasportation F
Mech
prior to

Piping Pre-Installation Inspection

Samsung Laydown Area 35

for the following location/equipment


Work Permit required:

Yes

No

Project Quality Plan:

SAPMT representative has verified that the work is ready for


inspection and conforms to the project requirements.

CONTRACTOR has verified that the w


complete and in compliance with the fol

SAPMT Name
Signature
Telephone

SAES/SAMS/Other #
Contractor/Company
QA/QC Name
QA/QC Signature

Julius
Date
Fax

This form received by the undersigned Inspection Department employee:


Name

Sajeev

Signature

Date

Note : Inspector's signature is for receiving this this request only and not for approval or disapproval of the work or facility inspe
Distribution:

A. Original - Project Management

B. 1st Copy - Inspection

RFI No.
Clean Trasportation Fuels at Riyadh Refinery
Plumb.

Comms.

Elect.

Erection

wn Area 35
Hold Point

Witness Point

R has verified that the work to be inspected is


n compliance with the following specifications:
SATIP-L-350-01 # 3.1
SAMSUNG EPC CO. LTD.
Richard
Date

Time

of the work or facility inspected.


C. 2nd Copy - Contractor

QR Number #
QMIS RFI #

Other