Next 14 Day Concrete Program

The document outlines a concrete pouring schedule for various structures from June 25 to July 2, 2015. It lists 5 activities including the HRSG Foundation #1 F3 Combine Raft pouring on June 27th, the Finfan Cooler Unit #2 Blinding pouring also on June 27th, the HRSG Control Building 5'-8" Elevated Slab pouring on June 28th, the Gantry Pedestal pouring on July 1st, and the Firewall Column pouring up to the Plinth Beam on July 2nd. A total of 95 cubic meters of concrete is scheduled to be poured over the period.

Uploaded by

Nadim Jilani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views4 pages

Next 14 Day Concrete Program

The document outlines a concrete pouring schedule for various structures from June 25 to July 2, 2015. It lists 5 activities including the HRSG Foundation #1 F3 Combine Raft pouring on June 27th, the Finfan Cooler Unit #2 Blinding pouring also on June 27th, the HRSG Control Building 5'-8" Elevated Slab pouring on June 28th, the Gantry Pedestal pouring on July 1st, and the Firewall Column pouring up to the Plinth Beam on July 2nd. A total of 95 cubic meters of concrete is scheduled to be poured over the period.

Uploaded by

Nadim Jilani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Concerete Pouring Program for Next week

Sr No.

Period :
25-06-2015 to 02-07Forcaste Date

Activity / Structure Name

HRSG Foundation # 1 F3 Combine Raft

Saturday, June 27, 2015

Finfan Cooler Unit # 2 Blinding

Saturday, June 27, 2015

HRSG Control Building 5'-8 Elevated Slab

4
5

Gantry Pedestal
Firewall Column Upto Plinth Beam

Sunday, June 28, 2015


Wednesday, July 01, 2015
Thursday, July 02, 2015
Total =

Pouring Program for Next week


Period :

25-06-2015 to 02-07-2015
Qty
50
6
30
7.5
1.5
95

UNIT ELECTRICAL UNIT ELECTRICAL


BUILDING # 01
BUILDING # 02
Date

26-

GTP CONTROL
BUILDING

HRSG CONTROL
BUILDING