Master Plan Perkeretaapian Jaboetabek

The document provides an overview of the existing and planned rail network in the Jabodetabek region of Indonesia between 2020-2030. It summarizes the existing rail lines and their lengths. It also outlines passenger demand forecasts and predicts a significant increase in rail ridership over this period, from over 2 million daily trips in 2020 to over 5 million in 2030. The master plan proposes expanding the network from 170km to over 500km through new lines, line extensions and capacity upgrades. Key projects included new airport express lines, four MRT lines, two outer orbital lines and five monorail lines. The plan aims to improve integration between rail and other transit modes at several stations.

Uploaded by

Bayu Wirawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
549 views16 pages

Master Plan Perkeretaapian Jaboetabek

The document provides an overview of the existing and planned rail network in the Jabodetabek region of Indonesia between 2020-2030. It summarizes the existing rail lines and their lengths. It also outlines passenger demand forecasts and predicts a significant increase in rail ridership over this period, from over 2 million daily trips in 2020 to over 5 million in 2030. The master plan proposes expanding the network from 170km to over 500km through new lines, line extensions and capacity upgrades. Key projects included new airport express lines, four MRT lines, two outer orbital lines and five monorail lines. The plan aims to improve integration between rail and other transit modes at several stations.

Uploaded by

Bayu Wirawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

KEMENTERIAN PERHUBUNGAN

DIREKTORAT JENDERAL PERKERETAAPIAN

MASTERPLAN PERKERETAAPIAN
JABODETABEK 2020
(Konsep 2)

Jakarta, Maret 2013


0

DAFTAR ISI
KONDISI EKSISTING
DEMAND FORECAST
MASTERPLAN PERKERETAAPIAN
JABODETABEK 2020

INTERCHANGE POINT
TRANSIT ORIENTED DEVELOPMENT
PROGRAM
1

KONDISI EKSISTING JARINGAN KERETA API JABODETABEK


LINE

KORIDOR

PANJANG
(KM)

Central
(Tengah)

Jakarta Kota
Manggarai

9,7

Bogor

Manggarai Bogor

44.9

Bekasi

Jatinegara Bekasi

14.6

Lintas Timur

Jakarta Kota
Jatinegara (Via Ps
Senen)

11.4

Lintas Barat

Jakarta Kota
Jatinegara (Via
Tanah Abang)

15.6

Serpong

Tanah Abang
Serpong

23.2

Tangerang

Duri Tangerang

19.3

Tanjung
Priok

Jakarta Kota TJ.


Priok

9.0

TJ. Priok
Kemayoran

9.5

Citayam Nambo

13.0

Nambo
Total

170.2

POLA PERJALANAN HARIAN DI WILAYAH JABODETABEK


(DENGAN SEMUA MODA TRANSPORTASI)

perjalanan/hari
000

PREDIKSI MODA SHARE TRANSPORTASI JABODETABEK


Perjalanan/hari

MODA

TAHUN
2020

PRIVATE CAR
SHARE
MOTOR CYCLE

2030

11.555.550

11.231.034

31,6%

29,5%

6.643.196

6.420.147

18,2%

16,9%

16.093.555

15.079.101

44,0%

39,6%

2.286.369

5.340.483

SHARE

6,3%

14,0%

TOTAL

36.578.671

38.070.766

SHARE
BUS
SHARE

RAIL

Sumber: PMC Service of Master Plan and FS for JABODETABEK Railway in Indonesia, KOICA 2012, diolah

DEMAND FORECAST PERKERETAAPIAN JABODETABEK


Perjalanan/hari

LINTAS
CIRCULAR
CENTRAL
TANJUNG PRIOK
BOGOR
BEKASI
TANGERANG
SERPONG
MRT
BANDARA
MONORAIL
INNER RING RAILWAY
PLUIT
SUNTER
JUMLAH

TAHUN
2020
209.692
321.020
37.226
348.834
295.759
119.266
165.812
192.574
135.529
460.657
2.286.369

2030
376.301
576.084
90.184
657.299
366.086
192.624
267.803
513.578
410.592
529.442
793.689
264.627
300.144
5.340.483

Sumber: PMC Service of Master Plan and FS for JABODETABEK Railway in Indonesia, KOICA 2012, diolah

KONSEP MASTERPLAN PERKERETAAPIAN JABODETABEK 2020 (2)

PERPINDAHAN DAN INTERMODA

Integrasi dengan moda lain :


1. Stasiun Manggarai :
KA Antar Kota KA Perkotaan KA
Bandara Busway

2.

Commuter Line KA Bandara (Eks


& CL) MRT N/S Busway

3.

5
2

Stasiun Kampung Bandan :


Commuter Line MRT N/S
Busway

4.

Stasiun Ps. Senen :


Commuter Line MRT E/W
Busway

Stasiun Dukuh Atas (or


Sudirman) :

5.

Stasiun Tanah Abang :


Commuter Line KA Bandara

6.

Rencana St. Lebak Bulus:


MRT N/S Busway

7.

Stasiun Cikarang:
Commuter Line MRT E/W

RENCANA PENGEMBANGAN KAWASAN TERPADU


NO

KAWASAN
PENGEMBANGAN
TERPDU

MANGGA DUA

2.

KOTA

3.

PASAR SENEN

4.

THAMRIN

5.

TANAH ABANG

6.

SUDIRMAN

7.

RASUNA SAID

8.

MANGGARAI

9.

CAWANG

10.

KUNINGAN

11.

BLOK M

12.

CISAUK

13.

CIKARANG

Cikarang

Cisauk

8
8

RENCANA JARINGAN PERKERETAAPIAN BERDASARKAN JENIS KERETA API


No.

Jenis Kereta Api

1.

Kereta Api Kecepatan Normal


Jalur Bandara Soekarno-Hatta (Comuter Line)
Jalur Bandara Soekarno-Hatta (Express Line)
MRT East-West (Balaraja - Cikarang)
MRT East-West (Cikokol Bekasi)
MRT North-South (Kp. Bandan Lebak Bulus)
Jalur Kereta Api Lingkar Luar (Parung PanjangCitayamNambo
CikarangTj. Priok)

Jalur Kereta Api Lingkar Dalam (Kamal Muara-Rawa Buaya-Lebak


Bulus-Margonda-Cibubur-Cakung-Pulo Gebang-Tj. Priok)
Pluit Line (Pluit-Daan Mogot-Kebayoran Lama)
Sunter Line (Sunter-Cempaka Baru-Jatinegara)

2.

Kereta Api Monorel


Jalur Biru (Kampung Melayu Casablanca Tanah Abang Roxy)
Jalur Hijau (Rasuna Said Gatot Subroto SCBD - Gelora Senayan Asia Afrika - Taman Ria Senayan - Gatot Subroto Pejompongan)
Jalur Selatan (Cawang Cibubur Bogor)
Jalur Timur (Cikarang Cawang Kuningan)
Jalur Barat (Batu Ceper Serpong)

Total

Panjang
Lintasan
(km)
386
12
38
90
52
23
60
75
15
21
147
14
14
54
43
22
533
9

PROGRAM PERKERETAAPIAN JABODETABEK

Panjang
No.

Program

1. Pembangunan Perkeretaapian
Peningkatan kapasitas lintas dan stasiun
2.
kereta api eksisting
Pengembangan fasilitas pendukung
3.
perkeretaapian Jabodetabek
TOTAL

(Km)

Biaya (Milliar Rupiah)


Swasta
Pemerintah
/BUMN

519,6

372.300

78,3

65.822

116.500

21.383
597,9

459.505

116.500

10

PROGRAM PEMBANGUNAN PERKERETAAPIAN JABODETABEK


Biaya
(Milliar Rupiah)

Panjang
No.

Program
(Km)

Pemerintah Swasta/BUMN

Pendek

Menengah

Jalur Bandara Soekarno-Hatta (Commuter Line)

12,3

2.

Short Cut antara Palmerah dan Karet pada Lintas


Serpong

5,2

1.448

3.

Short Cut Lintas Tangerang

1,3

1.000

4.

Short Cut Manggarai Pondok Jati

597

5.

Jalur Bandara Soekarno-Hatta (Express Line)

38

6.000

14.000

6.

MRT East-West (Balaraja-Cikarang)

90

82.000

35.000

7.

MRT East-West
(Cikokol Bekasi)

52

48.000

20.000

8.

MRT North-South (Kampung Bandan Lebak


Bulus)

23

9.

Jalur Kereta Lingkar Luar

60

10.

Jalur Kereta Lingkar Dalam

75

11.

Pluit

15

12.

Sunter

21

13.

Monorail
TOTAL

14.000

15.500

78.000

97.500

19.500

27.300
372.300

Panjang

1.

133,3
519,6

2.000

TAHAPAN

30.000
116.500

11

PROGRAM PENINGKATAN KAPASITAS LINTAS DAN STASIUN KERETA API EKSISTING


Panjang
No.

Program

Biaya (Milliar Rupiah)

(Km)

Pemerintah

1.

Double Double Tracking jalur Bekasi,


Elektrifikasi dan Peninggian

35

10.000

2.

Double Double
Tracking Lintas Barat (KaretManggarai)

4,3

1.662

4.

Pengembangan stasiun baru antara


Bogor and Cilebut pada Lintas Bogor

1 stasiun

154

5.

Double Tracking Lintas Serpong antara


Parung Panjang Rangkasbitung

39

50.700

6.

Penyediaan 2 (dua) stasiun baru


(Matraman St. and Bekasi Timur St.) on
the Bekasi Line

1.419

7.

Penyediaan 2 (dua) stasiun baru


(Stasiun Kuningan dan Stasiun
Sudirman) pada Lintas Priok

1.085

TOTAL

78,3

65.002

Swasta/BUMN

TAHAPAN
Pendek Menengah Panjang

12

PROGRAM PENGEMBANGAN FASILITAS PENDUKUNG


PERKERETAAPIAN JABODETABEK
Panjang
No.
1.
2.
3.
4.

5.

Program
Peningkatan fasilitas stasiun
pada lintas Bogor
Peningkatan fasilitas stasiun
pada lintas Tangerang
Rehabilitasi sinyal/fasilitas
telekomunikasi
Peningkatan fasilitas
perkeretaapian pada lintas
Bekasi
Peningkatan fasilitas
perkeretaapian pada lintas
Serpong
Peningkatan fasilitas
perkeretaapian pada Lintas
Serpong
TOTAL I

(Km)

Biaya (Milliar Rupiah)

TAHAPAN

Pemerintah Swasta/BUMN Pendek Menengah Panjang


575

156

2.226

3.506

3.781

802

11.046

13

(lanjutan)
Panjang
No.

Program

(Km)

Biaya Milliar Rupiah)


Pemerintah

Swasta/BUMN

TAHAPAN
Pendek

Menengah

Panjang

Peningkatan fasilitas
7. perkeretaapian pada lintas
Bogor

2.936

Peningkatan fasilitas
8. perkeretaapian pada lintas
Tj. Priok

997

Peningkatan fasilitas
9. perkeretaapian pada lintas
Tangerang

5.104

713

1.389

Automatic Train Protection


(ATP) System
Pembangunan Workshop di
11.
Depok
TOTAL II
TOTAL I + II

10.

11.139
22.185

14

TERIMA KASIH