0% found this document useful (0 votes)
395 views120 pages

2.1 Roads-PKG C2

This document is a bill of quantities for earthworks at a new infrastructure site at Dammam Airport East in the Kingdom of Saudi Arabia. It includes items for site preparation such as removal of existing utilities and vegetation. It also includes items for excavation and filling works for site grading, roads, and drainage networks. Manhole construction items are provided for drainage networks of various diameters and depths. The document is intended to specify the scope and estimate the costs of the earthworks and drainage works for the new infrastructure site.

Uploaded by

freanne_0527
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
395 views120 pages

2.1 Roads-PKG C2

This document is a bill of quantities for earthworks at a new infrastructure site at Dammam Airport East in the Kingdom of Saudi Arabia. It includes items for site preparation such as removal of existing utilities and vegetation. It also includes items for excavation and filling works for site grading, roads, and drainage networks. Manhole construction items are provided for drainage networks of various diameters and depths. The document is intended to specify the scope and estimate the costs of the earthworks and drainage works for the new infrastructure site.

Uploaded by

freanne_0527
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 120

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING KSA


DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS
Site Preparation
5/2/1
5/2/4

Public utilities and lines removal


Remove and relocation of street lighting poles, cables to
the designated area as directed by the engineer

5/2/10

Cleaning of debris, materials, plants & grass removal.

5/2/11
5/2/13

Removal of trees
Removal of existing gullies and stacking to the
designated area as directed by the engineer

Number
Number

5/2/14

Removal of utility manholes and stacking to the


designated area as directed by the engineer

Number

5/2/15

Carefully remove, protect and relocate existing temporary


survey bench mark.

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

L.M
Number

S.M

Page 1 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

Supply, execution and install concrete block with


dimensions (150mm*200mm*400mm) with steel bar to be
used as a markup for the plots boundaries and rate shall
include the cut, grading and all related materials and
works required

Concrete block L shape with dimensions


(400mm*600mm)
Squared concrete block with dimensions
(400mm*400mm)

Number
Number

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 2 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


SITE GRADING AND ROADS WORKS
Excavation Works
5/3/1/1

Common Excavations

C.M

5/3/2/1

Rock Excavation

C.M

Fill Works

5/4/2/1

General filling, suitable excavated material; other than


top soil or rock in layers

C.M

5/4/2/2

General filling, imported natural material other than top


soil or rock in layers.

C.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 3 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 4 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


ROAD WORKS
Excavation Works

5/3/1/2

Common Excavations

C.M

5/3/2/2

Rock Excavation

C.M

Fill Works
5/4/1
5/4/2/2

Roadbed preparation

S.M

Embankment works

C.M

Sub grade
5/5/2/1

Untreated Sub grade

C.M

5/5/3/1

Lime treated Sub grade

C.M

5/5/4/1

Surface preparation

S.M

5/5/4/3

Cement treated Sub grade

C.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 5 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 6 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

Water Drainage
All work items herein shall include all the works stated
(including supply and installation of materials) in
MOMRA's General Specifications

5/7/1

Excavation for all types of soils including disposal

5/7/1/1

Depth to invert not exceeding 1.5m

C.M

5/7/1/2

Depth to invert 1.5-2.5m

C.M

5/7/1/3

Depth to invert 2.6-3.5m

C.M

5/7/1/4

Depth to invert 3.6-4.5m

C.M

5/7/1/5

Depth to invert 4.6-5.5m

C.M

5/7/1/6

Depth to invert 5.6-6.5m

C.M

5/7/1/7

Depth to invert 6.6-7.5m

C.M

5/7/1/8

Depth to invert 7.6-8.5m

C.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 7 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

5/7/1/9

Excavation of ponds to collect water from networks

C.M

5/7/1/10

Fill of ponds to collect storm water

C.M

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 8 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


5/7/2

Manhole

5/7/2/1
5/7/2/1/1
5/7/2/1/1/1

Manhole (Type 1)
From Pipe Dia. 400 to 800 mm
Depth to invert not exceeding 1.5m

Number

5/7/2/1/1/2

Depth to invert 1.5-2.5m

Number

5/7/2/1/1/3

Depth to invert 2.6-3.5m

Number

5/7/2/1/1/4

Depth to invert 3.6-4.5m

Number

5/7/2/1/1/5

Depth to invert 4.6-5.5m

Number

5/7/2/1/1/6

Depth to invert 5.6-6.5m

Number

5/7/2/1/1/7

Depth to invert 6.6-7.5m

Number

5/7/2/2
5/7/2/2/1

Manhole (Type 2)
From Pipe Dia. 800 to 1100 mm

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 9 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item


Total in figures

5/7/2/2/1/1

Depth to invert not exceeding 1.5m

Unit
Number

5/7/2/2/1/2

Depth to invert 1.6-2.5m

Number

5/7/2/2/1/3

Depth to invert 2.6-3.5m

Number

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 10 of 120

Rate

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


Water Drainage (Con'td)
5/7/2/2/1/4

Depth to invert 3.6-4.5m

Number

5/7/2/2/1/5

Depth to invert 4.6-5.5m

Number

5/7/2/2/1/6

Depth to invert 5.6-6.5m

Number

5/7/2/2/1/7

Depth to invert 6.6-7.5m

Number

5/7/2/3

Manhole (Type 3)

5/7/2/3/1

From Pipe Dia. 1200mm and above

5/7/2/3/1/1

Depth to invert not exceeding 1.5m

Number

5/7/2/3/1/2

Depth to invert 1.5-2.5m

Number

5/7/2/3/1/3

Depth to invert 2.6-3.5m

Number

5/7/2/3/1/4

Depth to invert 3.6-4.5m

Number

5/7/2/3/1/5

Depth to invert 4.6-5.5m

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 11 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

5/7/2/3/1/6

Depth to invert 5.6-6.5m

Number

5/7/2/2/1/7

Depth to invert 6.6-7.5m

Number

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 12 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


Water Drainage (Con'td)
5/7/2/2/1/8

Depth to invert 7.6-8.5m

Number

5/7/2/2/1/9

Depth to invert 8.5-9.5m

Number

5/7/2/2/1/10

Depth to invert 9.5-10.5m

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 13 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 14 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


Water Drainage (Con'td)
5/7/2/7

Road Catchbasin

5/7/3

Bedding Layer

5/7/4

Pipes

Number
C.M

5/7/4/1/1

400 mm dia uPVC Pipe from inlet to manhole

L.M

5/7/4/1/2

75 mm dia uPVC Pipe for storm water at speed tables

L.M

5/7/4/2/1

400 mm dia GRP Pipe from manhole to manhole

L.M

5/7/4/2/2

500 mm dia GRP Pipe

L.M

5/7/4/2/3

600 mm dia GRP Pipe

L.M

5/7/4/2/4

700 mm dia GRP Pipe

L.M

5/7/4/2/5

800 mm dia GRP Pipe

L.M

5/7/4/2/6

900 mm dia GRP Pipe

L.M

5/7/4/2/7

1000 mm dia GRP Pipe

L.M

5/7/4/2/8

1100 mm dia GRP Pipe

L.M

5/7/4/2/9

1200 mm dia GRP Pipe

L.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 15 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

5/7/4/2/10

1300 mm dia GRP Pipe

L.M

5/7/4/2/11

1400 mm dia GRP Pipe

L.M

5/7/4/2/12

1500 mm dia GRP Pipe

L.M

5/7/4/2/13

1800 mm dia GRP Pipe

L.M

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 16 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


Water Drainage (Cont'd.)
5/7/4/2/14

2000 mm dia GRP Pipe

L.M

5/7/4/2/15

2200 mm dia GRP Pipe

L.M

5/7/4/2/16

2400 mm dia GRP Pipe

L.M

Backfilling Material

C.M

5/7/5/1

Concrete Surround (Encasement) for pipes including all


necessary works

C.M

5/7/5/2

Concrete Surround (Encasement) for 75mm dia conduit


pipe for storm water at speed tables including all
necessary works

C.M

5/7/5

5/7/9

Pipes Culvert

5/7/9/1

1200 mm dia RCC Pipe culvert

L.M

5/7/9/2

700 mm dia RCC Pipe culvert

L.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 17 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 18 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)

5/7/10

5/7/10/1
5/7/10/2
5/7/10/3
5/7/12
5/7/12/1
5/7/12/2
5/7/12/3
5/7/12/4
5/7/12/5
5/7/12/6
5/7/12/7
5/7/12/8
5/7/12/9
5/7/12/10
5/7/12/11
5/7/12/12
5/7/12/13

Water Drainage (Cont'd.)


Box Culvert
(Including excavation, backfilling, disposal,
Reinforcement, water proofing & all associated works)
Concrete Blinding
Reinforced Concrete Grade 30

C.M
C.M

Culvert drop inlet

No.

Outfall
Non-Return Flap Valve, 2400 mm dia
Non-Return Flap Valve, 2200 mm dia
Non-Return Flap Valve, 1500 mm dia
Non-Return Flap Valve, 1400 mm dia
Non-Return Flap Valve, 1300 mm dia
Non-Return Flap Valve, 1200 mm dia
Non-Return Flap Valve, 1100 mm dia
Non-Return Flap Valve, 1000 mm dia
Non-Return Flap Valve, 900 mm dia
Non-Return Flap Valve,800 mm dia
Non-Return Flap Valve, 700 mm dia
Non-Return Flap Valve, 600 mm dia
Non-Return Flap Valve, 500 mm dia

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Number
Number
Number
Number
Number
Number
Number
Number
Number
Number
Number
Number
Number

Page 19 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 20 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 5 - EARTHWORKS (Cont'd.)


Water Drainage (Cont'd.)
5/7/14

Concrete Channels

5/7/14/1

Excavation & disposal to offsite authorized area or as


directed by Engineer.

C.M

5/7/14/2
5/7/14/3

Fill works
Concrete Blinding

C.M
C.M

5/7/14/4
5/7/14/5
5/7/14/6

Reinforced Concrete Grade 30


Expansion Joint each 50m
2 Layers of 4mm thick water proofing Membrane

C.M
Lm
S.M

5/7/14/6

Grouted Riprap for outfall protection in the pond

C.M

5/7/14/7

Gabions

C.M

5/7/15

Pond Fencing
Supply and construct chain link fence with height of 2.00
m including footing foundation, excavation, backfill,
finishes and other items to complete as per drawing and
specifications.

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Lm

Page 21 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 22 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

DIVISION 5 - EARTHWORKS (Cont'd.)


Division Summary
Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
Page 5/7
Page 5/8
Page 5/9
Page 5/10
Page 5/11

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 23 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 5 - EARTHWORKS

Package C2
BILL OF QUANTITY
Item

Description


Total in words (SR)

Total Division 5 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 24 of 120


Total in figures

Rate

Unit




C2

Qty

-5

1/2/5
4/2/5

10/2/5

11/2/5
13/2/5

50
10

14/2/5

10

15/2/5

Page 25 of 120

1,000
20

1,125,000

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

)150* 200* 400(



400 * 600 L

4,450

400 * 400

10,300

Page 26 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(


1/1/3/5

1/2/3/5

2,118,142
280,585

1/2/4/5

1,684,886

5/4/2/2

6,363,038

Page 27 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 28 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(

2/1/3/5

2/2/3/5

320,601
30,802


1/4/5
2/2/4/5

281,847
223,688

1/2/5/5

1/3/5/5

1/4/5/5

3/4/5/5

Page 29 of 120

262,655
789
892,516
1,024
MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 30 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty



) (
.

1/7/5

1/1/7/5

1.5

105,080

2/1/7/5

1.5 2.5

31,435

3/1/7/5

2.6 3.5

22,835

4/1/7/5

3.6 4.5

16,940

5/1/7/5

4.6 5.5

13,010

6/1/7/5

5.6 6.5

7,745

7/1/7/5

6.6 7.5

4,325

8/1/7/5

7.6 8.5

1,845

Page 31 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

9/1/7/5

642,632

10/1/7/5

75,000

Page 32 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(

2/7/5

) (1

1/2/7/5
1/1/2/7/5
1/1/1/2/7/5

400 800
1.5

2/1/1/2/7/5

1.5 2.5

562

3/1/1/2/7/5

2.6 3.5

18

4/1/1/2/7/5

3.6 4.5

13

5/1/1/2/7/5

4.6 5.5

6/1/1/2/7/5

5.6 6.5

7/1/1/2/7/5

6.6 7.5

2/2/7/5
1/2/2/7/5

) (2
800 1100

Page 33 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty
10

1/1/2/2/7/5

1.5

2/1/2/2/7/5

1.6 2.5

93

3/1/2/2/7/5

2.6 3.5

40

Page 34 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(
)(
4/1/2/2/7/5

3.6 4.5

26

5/1/2/2/7/5

4.6 5.5

6/1/2/2/7/5

5.6 6.5

7/1/2/2/7/5

6.6 7.5

3/2/7/5
1/3/2/7/5

) (3
1200

1/1/3/2/7/5

1.5

2/1/3/2/7/5

1.5 2.5

3/1/3/2/7/5

2.6 3.5

16

4/1/3/2/7/5

3.6 4.5

18

5/1/3/2/7/5

4.6 5.5

Page 35 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

6/1/3/2/7/5

5.6 6.5

12

7/1/2/2/7/5

6.6 7.5

Page 36 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(
)(
8/1/2/2/7/5

7.6 8.5

9/1/2/2/7/5

8.5 9.5

10/1/2/2/7/5

9.5 10.5

Page 37 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 38 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(
)(
7/2/7/5
3/7/5

905
87,860

4/7/5
5/7/4/1/1

400 ) (UPVC

16,905

5/7/4/1/2

75 ) (UPVC

1,200

5/7/4/2/1

400 ) (GRP

9,760

5/7/4/2/2

500 ) (GRP

11,495

5/7/4/2/3

600 ) (GRP

7,395

5/7/4/2/4

700 ) (GRP

2,815

5/7/4/2/5

800 ) (GRP

3,310

5/7/4/2/6

900 ) (GRP

2,105

5/7/4/2/7

1000 ) (GRP

1,380

5/7/4/2/8

1100 ) (GRP

2,440

5/7/4/2/9

1200 ) (GRP

660

Page 39 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

5/7/4/2/10

1300 ) (GRP

500

5/7/4/2/11

1400 ) (GRP

1,080

5/7/4/2/12

1500 ) (GRP

1,275

5/7/4/2/13

1800 ) (GRP

590

Page 40 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(
)(
5/7/4/2/14

2000 ) (GRP

1,085

5/7/4/2/15

2200 ) (GRP

2,060

5/7/4/2/16

2400 ) (GRP

124

84,360

5/7/5
1/5/7/5

7,100

2/5/7/5

75 ) (UPVC
.

9/7/5

20

1/9/7/5

1200 ) (RCC

447

2/9/7/5

700 ) (RCC

258

Page 41 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 42 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(

10/7/5

1/10/7/5
2/10/7/5
3/10/7/6

)(
) :

(

30

5/7/12
5/7/12/1
5/7/12/2
5/7/12/3
5/7/12/4
5/7/12/5
5/7/12/6
5/7/12/7
5/7/12/8
5/7/12/9
5/7/12/10
5/7/12/11
5/7/12/12
5/7/12/13

11
179
1

, 2400
, 2200
, 1500
, 1400
, 1300
, 1200
, 1100
, 1000
, 900
, 800
, 700
, 600
, 500

Page 43 of 120

1
3
3
1
1
1
3
4
3
5
3
8
2

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 44 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(
)(

14/7/5
1/14/7/5

961

2/14/7/5
3/14/7/5

140
244

4/14/7/5
5/14/7/5
6/14/7/5

30
50
4

1,447
48
4,883

6/14/7/5

) (

4,200

7/14/7/5

15/7/5


2 chain link

Page 45 of 120

100

3,490

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 46 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-5 )(

5/1
5/2
5/3
5/4
5/5
5/6
5/7
5/8
5/9
5/10
5/11

Page 47 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 48 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA

DIVISION 6 - SUBBASE & AGGREGATE BASES

DAMMAM AIRPORT EAST INFRASTRUCTURE SITE


Package C2

- 6

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 6 - SUBBASE & AGGREGATE BASES


Aggregate Subbase
6/3/1

Subbase layer

C.M

Aggregate Bases
6/4/1

Aggregate Bases

C.M

Cement Treated Base


6/5/1

Cement Treated Base

C.M

6/5/2

Cement

Ton

Emulsified Asphalt Treated Base


6/6/1

Emulsified Asphalt Treated Base type I

C.M

6/6/2

Emulsified Asphalt Treated Base type II

C.M

6/6/3

Emulsified Asphalt Treated Base type III

C.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 49 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA

DIVISION 6 - SUBBASE & AGGREGATE BASES

DAMMAM AIRPORT EAST INFRASTRUCTURE SITE


Package C2

- 6

BILL OF QUANTITY
Item

Description


Total in words (SR)

Total Division 6 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 50 of 120


Total in figures

Rate

Unit




C2

Qty

- 6

1/3/6

1,000

1/4/6

352,309


1/5/6

2/5/6

1,000
100


1/6/6

1,000

2/6/6

1,000

3/6/6

1,000

Page 51 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 52 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 8 - ASPHALTIC CONCRETE WORKS

Package C2

- 8

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 8 - ASPHALTIC CONCRETE WORKS


Prime Coat
8/3/1

Prime Coat

S.M

8/4/1

Tack Coat

S.M

Asphaltic Concrete
8/5/1/1

Asphaltic Concrete base course type A

C.M

8/5/1/2

Asphaltic Concrete base course type C

C.M

8/5/2/1

Asphaltic concrete wearing type A

C.M

8/5/2/2

Asphaltic concrete wearing type A for Overlay


including preparation of surface

C.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 53 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 8 - ASPHALTIC CONCRETE WORKS

Package C2

- 8

BILL OF QUANTITY
Item

Description


Total in words (SR)

Total Division 8 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 54 of 120


Total in figures

Rate

Unit




C2

Qty

- 8

1/3/8

1,230,283

1/4/8

1,230,283


1/1/5/8

)(

78,421

2/1/5/8

)(

1,000

1/2/5/8

)(

61,514

2/2/5/8

)(

Page 55 of 120

1,000

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 56 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA

DIVISION 15 - SIDE WALKS. CURBS, GUTTERS AND MEDIANS

DAMMAM AIRPORT EAST INFRASTRUCTURE SITE


Package C2

- 15

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

15/3/1/1

DIVISION 15 - SIDE WALKS. CURBS, GUTTERS


AND MEDIANS
Cement Concrete upstand curbs 150 x 305 mm

L.M

15/3/1/2

Cement Concrete drop curbs 305 x 150 mm

L.M

15/3/1/3

Cement Concrete Flush curbs 305 x 150 mm

L.M

15/3/1/4

Edge beam: cement concrete heel curb

L.M

15/3/1/5

Cement concrete transition curb

L.M

Curbs paint

L.M

15/3/2

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 57 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA

DIVISION 15 - SIDE WALKS. CURBS, GUTTERS AND MEDIANS

DAMMAM AIRPORT EAST INFRASTRUCTURE SITE


Package C2

- 15

BILL OF QUANTITY
Item

Description


Total in words (SR)

Total Division 15 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 58 of 120


Total in figures

Rate

Unit




C2

Qty

- 15
1/1/3/15

305x150.

192,530

2/1/3/15


305x150.

15,282

3/1/3/15

150X 305

9,000

4/1/3/15

1,000

5/1/3/15

1,000

2/3/15

192,530

Page 59 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

15

Page 60 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS

16/2/3/1

Traffic Signal Controller including foundation

Unit

16/2/3/2

Pedestrian Traffic Signal Controller

Unit

16/2/3/3

Pedestrian Traffic Signal Head 200 mm2

Unit

16/2/3/4/1

Traffic Signal 100mm Head 3 Aspects

Unit

16/2/3/4/2

Traffic Signal 300mm Head 3 Aspects

Unit

16/2/3/5/1

Traffic Signal Support including foundation (Pole mounted)

Unit

16/2/3/5/2

Traffic Signal Support including foundation (Cantilever Type)

Unit

16/2/3/8

Traffic Loop Detectors

Unit

16/2/3/9

Pedestrian Traffic Signal Push Button

Unit

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 61 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Total in figures

16/2/3/10

Traffic Signal Manhole

Unit
Unit

16/2/3/11

Earth point

Unit

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 62 of 120

Rate

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

uPVC Ducts including excavation,bed & Surround ,


warning tape,back filling etc complete.

16/2/4/1

1 way duct

L.M

16/2/4/2

2 way duct

L.M

16/2/4/3

3 way duct

L.M

16/2/4/4

4 way duct

L.M

16/2/4/5

5 way duct

L.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 63 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 64 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

16/3/10/1

Traffic Signs

16/3/10/1/1 A Highway Signs, Ground mounted type R1-1

S.M

16/3/10/1/1 B

Highway Signs, Ground mounted type R1-2

S.M

16/3/10/1/2

Highway Signs, Ground mounted type R14-1

S.M

16/3/10/1/3

Highway Signs, Ground mounted type R15-2

S.M

16/3/10/1/4

Highway Signs, Ground mounted type R15-3

S.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 65 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 66 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

Traffic Signs (Cont'd.)


16/3/10/1/5

Highway Signs, Ground mounted type R3-1

S.M

16/3/10/1/6

Highway Signs, Ground mounted type R3-2

S.M

16/3/10/1/7

Highway Signs, Ground mounted type R3-3

S.M

16/3/10/1/8

Highway Signs, Ground mounted type R17-1R

S.M

16/3/10/1/9

Highway Signs, Ground mounted type W11-1

S.M

16/3/10/1/10

Highway Signs, Ground mounted type W37-1B

S.M

16/3/10/1/11

Highway Signs, Ground mounted type W24-3

S.M

16/3/10/1/12

Highway Signs, Other Types

S.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 67 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Total in figures

16/3/10/1/13

Sign Support, (Breakaway) Tubular

Unit
Unit

16/3/10/1/14

Kilometer Post

Unit

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 68 of 120

Rate

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

Traffic Signs (Cont'd.)


16/3/10/1/15

Structural Paint

S.M

16/3/10/1/16

Highway Signs, Overhead

S.M

16/3/10/1/17

Sign Support - Overhead

TON

16/3/10/1/18

Speed table; One way maximum 150mm thick block paving


speed table, including flush kerb, white retro reflective road
stud 650 c/c, white thermoplastic marking and all other
necessary fittings & fixings as per drawings & specification

number

16/3/10/1/19

Speed table; Two way maximum 150mm thick block paving


speed table; including flush kerb, white retro reflective road
stud 650 c/c, white thermoplastic marking and all other
necessary fittings & fixings as per drawings & specification

number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 69 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 70 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

Traffic Paint and Road Marking


16/4/9/1/1

Stop Line; White Continous Line 300mm Wide

S.M

16/4/9/1/2

Give Way line; 0.6m Dash, 0.3m Gap, 300mm Wide White
Line

S.M

16/4/9/1/3

Pedestrian Crossing Line; 0.5m Dash, 0.5m Gap, 3000mm


Wide White Line

S.M

16/4/9/1/4

No Passing Line; Continuous Yellow Line 120mm Wide

S.M

16/4/9/1/5

Channelization Line; Continuous White Line 120mm Wide

S.M

16/4/9/1/6

Edge Line; 200mm Wide Yellow Line

S.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 71 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item
16/4/9/1/7

- 16

Total in words (SR)

Description

Parking envelop Line; 1.0m Dash, 1.0m Gap, 120mm Wide,


White Line

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 72 of 120


Total in figures

Rate

Unit
S.M

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

Traffic Paint and Road Marking (Cont'd.)


16/4/9/1/8

Broken Line;3.0m Dash, 6.0m Gap 120mm Wide White


Line

S.M

16/4/9/1/9

Broken Line;3.0m Dash, 6.0m Gap 120mm Wide Yellow


Line

S.M

16/4/9/1/10

Broken Line;3.0m Dash, 3.0m Gap 120mm Wide White


Line

S.M

16/4/9/1/11

Box Junction Marking

S.M

16/4/9/1/12

Rumble Strip

S.M

16/4/9/1/13

Chevron Marking

S.M

16/4/9/1/14

Hatch Marking

S.M

16/4/9/1/15

Traffic Arrow

Number

16/4/9/1/15.1 Cat Eye Road Studs

Number

16/4/9/1/15.2 Ceramic Studs

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 73 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

16/4/9/1/16

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

Pedestrain crossing ramps

Rate

Unit
No.

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D


Total in figures

Page 74 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description


Total in figures

Rate

Unit

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

MISCELLANEOUS WORKS
16/6/1

Construct survey bench mark


including excavation,
backfilling, etc complete as per Dammam Municipality
specifications

Unit

16/6/2

Supply and install large highway Billboard signs including


foundation work, Steel Structure, lighting, printing material,
maintenance, etc, to be located within the site boundary
and as per drawing and specification.

Unit

16/6/3

Pedestrain Security Railing

Lm

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 75 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 76 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS

Package C2
BILL OF QUANTITY
Item

- 16

Total in words (SR)

Description

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND
CONCRETE BARRIER WORKS (Cont'd.)

Division Summary
Page 16/1
Page 16/2
Page 16/3
Page 16/4
Page 16/5
Page 16/6
Page 16/7
Page 16/8

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 77 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2
BILL OF QUANTITY
Item

DIVISION 16 - TRAFFIC SIGNALS, TRAFFIC SIGNS,


ROAD MARKING, FENCES, GUARDRAILS AND CONCRETE BARRIER WORKS
- 16

Description


Total in words (SR)

Total Division 16 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 78 of 120


Total in figures

Rate

Unit




C2

Qty

-16
, ,

1/3/2/16

2/3/2/16

200 2

3/3/2/16
1/4/3/2/16

100 3

10

2/4/3/2/16

300 3

1/5/3/2/16

2/5/3/2/16

10

8/3/2/16

28

9/3/2/16

) (

17

Page 79 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

10/3/2/16

11/3/2/16

Qty
42
3

Page 80 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...

, , , UPVC ,
....

1/2/4/16

231

2/4/2/16

378

3/4/2/16

315

4/4/2/16

263

5/4/2/16

263

Page 81 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 82 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...

16/3/10/1

16/3/10/1/1 A

R1-1

207

16/3/10/1/1 B

R1-2

23

16/3/10/1/2

R14-1

18

16/3/10/1/3

R15-2

38

16/3/10/1/4

R15-3

53

Page 83 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 84 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...

)(
16/3/10/1/5

R3-1

33

16/3/10/1/6

R3-2

12

16/3/10/1/7

R3-3

17

16/3/10/1/8

R17-1R

16/3/10/1/9

W11-1

16/3/10/1/10

W37-1B

97

16/3/10/1/11

W24-3

156

16/3/10/1/12

572

Page 85 of 120

1,440

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

16/3/10/1/13

16/3/10/1/14

Qty
50
10

Page 86 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...

)(
16/3/10/1/15

2,000

16/3/10/1/16

1,000

16/3/10/1/17

25

16/3/10/1/18

15


.

30

16/3/10/1/19

15


.

225

Page 87 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 88 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...


1/1/9/4/16

. ) ( 300

2/1/9/4/16

) ( 0.6 0.3
. 300

7,000

3/1/9/4/16

0.5 0.5
3000.

5,000

4/1/9/4/16

. ) ( 120

2,000

5/1/9/4/16

. ) ( 120

2,000

6/1/9/4/16

. ) ( 200

7,805

Page 89 of 120

915

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

7/1/9/4/16


) ( 1 1
. 120

Qty
13,800

Page 90 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...

)(
8/1/9/4/16

9/1/9/4/16

. 3 6 120

. 3 6 120

6,405

7,571

10/1/9/4/16

. 3 3 120

10,000

11/1/9/4/16

1,000

12/1/9/4/16

Rumble

1,000

13/1/9/4/16

chevron

500

14/1/9/4/16

500

15/1/9/4/16

500

1.15/1/9/4/16

) (

7,000

2.15/1/9/4/16

7,000

Page 91 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

16/1/9/4/16

Qty

1,390

Page 92 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty


-16
, ,
)(...


16/6/1

16/6/2


, ,
.

16/6/3

Page 93 of 120

1,000

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 94 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-16
, ,
)(...


16/1
16/2
16/3
16/4
16/5
16/6
16/7
16/8

Page 95 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

16

Page 96 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 18 - ROAD LIGHTING WORKS

uPVC Ducts, 100mm dia including excavation, bed &


Surround , warning tape, back filling etc complete.
18/2/4/1

1 way duct

L.M

18/2/4/2

2 way duct

L.M

18/2/4/3

3 way duct

L.M

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 97 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 98 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 18 -ROAD LIGHTING WORKS (Cont'd.)


Concrete foundation for
18/6/1
18/6/2
18/6/3
18/6/4
18/6/5

8 m high lighting column


10 m high lighting column
12 m high lighting column
14 m high lighting column
Feeder Pillar

Number
Number
Number
Number
Number

Lighting Column
18/6/6
18/6/7
18/6/8
18/6/9
18/6/10

8m lighting pole
10m lighting pole
12m lighting pole
14m lighting pole
Feeder Pillar

Number
Number
Number
Number
Number

18/6/11

Earthing for feeder pillar and for lighting columns

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 99 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 100 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 18 -ROAD LIGHTING WORKS (Cont'd.)


Lighting Column Luminaries
18/6/12

1 x 84 watt LED street light luminaire, Horizontal Tenon


Mount, 84W, 7211 lumens , (525mA), IP66 rated .

Number

18/6/13

1x205 watt LED street light luminaire, Horizontal Tenon


Mount, 205W, 20764 lumens , (350mA), IP66 rated

Number

18/6/14

1x305 watt LED street light luminaire, Horizontal Tenon


Mount, 305W, 26944 lumens , (700mA), IP66 rated

Number

18/6/15

1x390 watt LED street light luminaire, Horizontal Tenon


Mount, 390W, 34060 lumens , (700mA), IP66 rated

Number

18/6/16

2x305 watt LED street light luminaire, Horizontal Tenon


Mount, 305W, 26944 lumens , (700mA), IP66 rated

Number

18/6/17

2x390 watt LED street light luminaire, Horizontal Tenon


Mount, 390W, 34060 lumens , (700mA), IP66 rated

Number

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 101 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 102 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)


Total in figures

Rate

Unit

DIVISION 18 -ROAD LIGHTING WORKS (Cont'd.)

Power supply cables


18/6/18

4c x 25mm cable

L.M

18/6/19

4c x 70mm main cable

L.M

18/6/20

Earthing cables for feeder pillar 1x35mm 2

L.M

Lantern cables
18/6/21

3c x 2.5mm Cable

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

L.M

Page 103 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

To Collection

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 104 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

DIVISION 18 -ROAD LIGHTING WORKS (Cont'd.)

Division Summary
Page 18/1
Page 18/2
Page 18/3
Page 18/4

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 105 of 120


Total in figures

Rate

Unit

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE

DIVISION 18 -ROAD LIGHTING WORKS

Package C2

-18

BILL OF QUANTITY
Item

Description


Total in words (SR)

Total Division 18 Carried to Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 106 of 120


Total in figures

Rate

Unit




C2

Qty

-18

100 , , UPVC
, ....
1/4/2/18

2,363

2/4/2/18

473

3/4/2/18

210

Page 107 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 108 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-18 )(

1/6/18
2/6/18
3/6/18
4/6/18
5/6/18

. 8
. 10
. 12
. 14

487
2,228
168
236
32


6/6/18
7/6/18
8/6/18
9/6/18
10/6/18

11/6/18

8
10
12
14

Page 109 of 120

487
2,228
168
236
32

3,151

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 110 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-18 )(

12/6/18

x84 1
84 7211 ,
IP66.

13/6/18

x205 1
205 IP66. 20764

1,059

14/6/18

x305 1
305 IP66. 26944

884

15/6/18

x390 1
390 IP66. 34060

285

16/6/18

x305 2
305 IP66. 26944

168

17/6/18

x390 2
390 IP66. 34060

236

Page 111 of 120

487

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 112 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty


-18 )(

)(
18/6/18

c x 25mm 4

105,000

19/6/18

c x 70mm e 4

10,500

20/6/18

x35mm2 1

683


21/6/18

c x 2.5mm 3

Page 113 of 120

39,375

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

Page 114 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

-18 )(


18/1
18/2
18/3
18/4

Page 115 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Qty

18

Page 116 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2

Summary Enabling & Roads & Highways


BILL OF QUANTITY

Total in words (SR)


Total in figures

Division 5 - Earthworks

5/12

Division 6 - Subbase & Aggregate Bases

6/1

Division 8 - Asphalt Concrete Works

8/1

Division 15 - Side Walks. Curbs, Gutters And Medians


15/1
Division 16 - Traffic Signs, Road Marking, Fences, Guardrails
16/9
Division 18 -Road Lighting Work

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

18/5

Page 117 of 120

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING KSA
DAMMAM AIRPORT EAST INFRASTRUCTURE SITE
Package C2

Summary Enabling & Roads & Highways


BILL OF QUANTITY

Total in words (SR)

Total Carried Forward to Grand Summary

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

Page 118 of 120


Total in figures




C2

-5
-6
-8
-15

- 16 , , ,

-18

Page 119 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D




C2

Page 120 of 120

MOH-TD-DM-PKG C2-BOQ-11
February 2015, Rev.D

You might also like