UAE ARMED FORCES Reference
COMMAND OF MILITARY WORKS: MTs! X_|0017}
po F Date |v
15-Oct-11 | 2
‘This Material Submittal must be accompanied by a Compliance Statement
I =] 26 [Subject [Repair material for structural concrete
[National Warne Dredging Company Yo | [Dorsth Gruppe DC Abudhabi
loot "address 7 | UAE.
Contact, 0 80%3649,Abu Dhabi UAE eee .0 Box26417,Abu Dhabi , UAE
Facility
Discipine
|Comptiance @ Comptes with Contact documents TO Ateratve (atach support documents)
Ser Full Description Sues /DetaTs Ref to BOO Specs / Owes
1 [Recon GP comenttious structural grade repair mortar for crown wal
z pas am
a speciation Reference 6.5.8
4 |Nole-yeviscd Zo zeh
3 :
The Corractorceifiesthat formation ued under thi Submit! hove been reviewed ord veri ard found oben
Contract documents ules eked of “ertve above.
C
ite Engineer / Services Engineer Comments:
fame] [Sanat |
[Approval Committee / Consultant Comments:
Qa
Nome - Signature Date
set Mana ConTT Bed ONT te ecTaon Box abare eed
capy
Review Status iby CO codes C) Codes L Codec Oi code
“Ai deals mustbe fled w Enalah
50.900) 208 Suc 8542 234
159] DUTSEBHse 00106
Time;__:__hs
LOG-INNo.: 10004 R-‘UAE ARMED FORCES Reference
‘COMMAND OF MILITARY WORKS MTs__X 0017 ey
De ‘ev
Waa LLL 2e-Aug-tt 01
‘This Material Submittal must be accompanied by @ Compliance Statement
[Project No. 10004 - 2a] Subject ‘{MW-OU-241-2008) ReCon GP
from tional Marine Dredging Company To ‘Dorsch Gruppe: DC Abu Dhabi
iddress / 7 Address /
(ese po.soxno: 364s, abu oneal, uae ASSES! p.0.90x NO: 26417, ABU DHABI, UAE
SUBMITTAL TITLE: ReCon GP Cementitious structural Grade Repair Mortar
ractity General Fetevel General Zone N/A
losiptine combined wasio N/A csi WA
|Compliance © Complies with Contract documents O Alternative (attach support documents)
Ser. Full Dexcintion/sies Deval Ref to BOG / specs /Bwas
Con GP Cementitious structural Grade Repalr Mortar Yor crown wall
|Specification Refrence:
lose
‘The Cntvetor certifies ata nfrmetion ised under Bis submit have bee reviewed ord veried ond found oben
‘Contoct documents anes ticked a "Aemotie” above.
FORTHE CONTRACTOR
tome MeN Metamed Sungre
[SUBMITTAL REVIEW & COMMENTS
[site Engineer / Services Engineer Comments:
Checked and found acceptable,
Nome _Roger Inker Signature a bate 08 Sept tt
[Approval Committee / Consultant Comments: U
Escalation
toPMis
Required
Review status (wy cade a cade B Cleoce Dleode
Fl owrove) APPROVED P.AS NOTED) REVISE & RESUBMAT REIECTED
[tome - Signature ate
(ee I Dal fhe Enger sa yetio any ay eve te Conan oF ny of
iB - i
| Ee FOR THE CONT@ACTOR ete
arg B SEP 2011
KEvEWEDLG. prover: 10004—GaTooT NWA BASE, UAE, BJ vorsch Gruppe
# Works DREDGING, RECLAMATION AND REVETMENT WORKS DC Abu Dhabi
i Contract No. MW-OU-241-2009 7
Sais [DocuwenrTme: MATERIAL SUBMITTAL CHECKLIST
Project No: 241 ‘Subject | Concrete repair material MTSRef.No|MTSX | Date [15/107
A7Rev2 | 1
Employer | Command of miliary works | Engineer Dorsch Gruppe Abu Dhabi
Contractor | NOC Tnstale /Appicatorieecior
Name: Signature z
Cont 1510-11
logo. | Mr. Nasser Mohammed Ali ——f_
not] Tove
Tew DESCRIPTION epiate | Subnites
Catalog extract. usraione, schedules, diagrams, performance chats, in
and brochures ilustatig size, physical appearance and other characteristics
materials, systems or equipment for some portion of the Works a
Enclose Copies of paricuar Coniract Specification page applicable to tis Mater
Submital and reference standards (eg) ASTM, AISC, etc) used. a
Stamped compliance statement covering each clauses of the Specification particular
to the product N
Product tests reports. ¥
Shop drawing (A3 or Ad) [sketches indicalng area where Ws used and italation
details including manufacturer's dimensional drawings. N
Prepare writen stalements on Manufacturers lelleriead Coriying thal the product or
Material complies withthe requirement in the Contract Documents and tha the
Installer is authorized to cary out the corresponding works accordingly N
Copy of installer / appicators/ ereciors approval rom the Employer. N
Draft warranty forthe productimateral and workmanship. N
‘aly procedure paricuar to this scope of Works. Nl
Samples or mock-up of proposed material (on site) Y
"11 | Fire rating dlassficaions or letings from UL, NFPA, or an gency Raving jurisdiction N
“12 Design and Csleulations, as spectied N
Witten confirmation o assign representatives with experise and authoriy to act on
13. | behalf ofthe manufacture on site for general commissioning requirements of the
system N
a Preliminary terface contol documents wih other services and systems 6s
specified N
‘Gia docurents nt Tote, waver, deeried portant and necessary to waTant BOCeplance end approval
aie sheet necessary
Docarns eared to be erconed Yor al Mater SuDial
ee eed
Name _ 7 Sanat Date
— — =
Document Ne TOSOKDCADDOC ECONO ——~—CSC*RSOR OSS Stas: FIA
Originator! Controller. AP Date Issue: 22 Sep 2010
Printed 15-Oct-2011 5 12.AMTAE ARWED FORCES Teena
COMMAND OF MILITARY WORKS MTs) X_| 17
; 7 Bate] ee
0 i 15-Octdi
MUST be attached to every Material Submittal
role No] [= 24 [Subject Repair material or strucrval concrete
ii as Complance a Comply (Y/N) a
7 [Recon GP comenthious structural grade 358 Y
~ 2 |repair mortar for crown wall — _ — -
2s | -
The Contractor ceifies that al hfermetion sued unde ths Subita ave Been reviewed and verified andfourd oben cmplone with he
Contac document oteruee, non compliance must bestia nts
Notes and Remarks by the Issuer
—_ FOR THE CONTRACTOR
Name MrNasser Mohammed » Signature bate
12D conw sorss-cseev 0.101006 130 900: 208-sne-8547-216 ;(8) peoser, GumoorNavn. Bae, UAE Peta Maine ‘
Q Worcs: DreDatio, Rec aNAMioW AND REVETWENT CONTRACT Eira’) Seve rnp