0% found this document useful (0 votes)
122 views

Costing

The document outlines the costs for two items - Gear C2 and Gear Starter Reduction. It shows the raw material costs, processing costs including forging conversion, heat treatment and machining, and other costs like overhead, transport and profit. The total cost per item is calculated separately for the old and new scenarios, with the new scenario showing lower raw material and processing costs, resulting in a slightly lower total cost per item.

Uploaded by

Emba Madras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views

Costing

The document outlines the costs for two items - Gear C2 and Gear Starter Reduction. It shows the raw material costs, processing costs including forging conversion, heat treatment and machining, and other costs like overhead, transport and profit. The total cost per item is calculated separately for the old and new scenarios, with the new scenario showing lower raw material and processing costs, resulting in a slightly lower total cost per item.

Uploaded by

Emba Madras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 64

OLD

Gear C2
Machine Wt
Net Caluculated Forging Wt
Gross Wt
Raw Material Rate /Kgs
Raw Material Cost / Piece
Scrap realisation
Scrap Kgs
Scrap Rate /Kgs
Scrap Recover cost/Item
RM cost /Item( After scrap Realization)
Forging Convertion Cost /Item
HT Cost /Item( Normalizing)
Shot blasting Cost/Piece
Coining per Item
Machining Cost
Net Processing Cost
Total Cost per Item ( A+B)
OH -3 % on Processing Cost
ICC Cost 2.2% on RM
Packing Cost
Transport Cost ( Modern to Modern Blr
Local Transport Cost ( Modern Blr to MAP-ID
Total Cost per Item ( A+B+C)
Profit -7% on prcessing Cost
Total Cost per Item
Special Discount
After Discount per Item Price

0.13
0.27
0.30
63.94
19.18
80%
0.14
17.71
2.48
16.70
4.5
1.62
0.27
0
11
17.39
34.09
0.52
0.38
0.73
1.08
0.39
3.10
37.19
1.22
38.41
0.02
0.58
37.83

NEW
0.13
0.27
0.30
61.00
18.30
80%
0.14
17.71
2.48
15.82
4.5
1.62
0.27
0
11
17.39
33.21
0.52
0.36
0.73
1.08
0.39
3.08
36.29
1.22
37.51
0.02
0.56
36.94

16.7
6
1

OLD

Gear Starter Reduction


Machine Wt
Net Caluculated Forging Wt
Gross Wt
Raw Material Rate /Kgs
Raw Material Cost / Piece
Scrap realisation
Scrap Kgs
Scrap Rate /Kgs
Scrap Recover cost/Item
RM cost /Item( After scrap Realization)
Forging Convertion Cost /Item
HT Cost /Item( Normalizing)
Shot blasting Cost/Piece
Coining per Item
Machining Cost
Net Processing Cost
Total Cost per Item ( A+B)
OH -3 % on Processing Cost
ICC Cost 2.2% on RM
Packing Cost
Transport Cost ( Modern to Modern Blr
Local Transport Cost ( Modern Blr to MAP-ID
Total Cost per Item ( A+B+C)
Profit -7% on prcessing Cost
Total Cost per Item
Special Discount
After Discount per Item Price

0.13
0.27
0.30
63.94
19.18
80%
0.14
17.71
2.48
16.70
4.5
1.62
0.27
0
11
17.39
34.09
0.52
0.38
0.73
1.08
0.39
3.10
37.19
1.22
38.41
0.02
0.58
37.83

NEW
0.13
0.27
0.30
61.00
18.30
80%
0.14
17.71
2.48
15.82
4.5
1.62
0.27
0
11
17.39
33.21
0.52
0.36
0.73
1.08
0.39
3.08
36.29
1.22
37.51
0.02
0.56
36.94

16.7
6
1

You might also like