A320 Schematics PDF
A320 Schematics PDF
SKIN EXCH
OUTLET
BYPASS VLV
Temperature control
- HI TEMP if 290C > 5sec or
270C > 15sec or
257C > 55sec
- LO TEMP if < 150C
Pressure control
- HI PRESS if > 60psi
- LO PRESS if < 4psi
AVIONICS VENTILATION
CONFIGURATIONS:
CLOSED, on GND (skin<9-12C), FLT(skin<32-35C)
if (skin>32-35C) then EXTRACT VLV partially opens
OPEN, on GND (skin>9-12C)
SMOKE CONFIG
Air from avionics bay
SKIN HEAT
EXCHANGER
AEVC
[DC1]
[DC ESS
SHED]
5th
9th
PACK 1
FLOW
CONTROL
VALVE
[DC ESS
SHED]
SKIN AIR
INLET VLV
AIRCOND
INLET
VALVE
BLEED VALVE
ENG 1 [DC ESS SHED]
ENG 2 [DC2]
STARTER VLV
pressure
indication
OVERPRESS
VALVE (85psi)
HYD
RES
WATER
TANK
SAFETY
VALVES
WING ANTI ICE VLV
[AC ESS SHED]
Valve closes if unpowered
HP GND
CONNECT
OUTFLOW
VALVE
APU
ELECTRONIC
APU
LIMITATIONS
CONTROL BOX
BLEED
RPM min 95%, max 107% (auto shut down)
[BAT]
VALVE
running EGT max 682C (5sec) or 700-742
start EGT max 900C > 25'000ft
B
start EGT max 982C < 25'000ft
APU FF
LOW OIL LEVEL => 10 hrs APU ops
start cycles: S 1min S 1min S 60min
APU
Enveloppe:
STARTER
START with AC pwr up to 39'000ft
[BAT]
START with EMER ELEC pwr up to 25'000ft
APU LP VLV
BLEED ON 2packs max 15'000ft, 1 pack max 20'000ft
[DC BAT]
BLEED ON for engine start max 20'000ft
[HOT 1]
BLEED for WING A/ICE not permitted
APU FUEL FLOW ~130 kg/hr
APU PUMP
[DC BAT] P
[AC ESS
SHED]
FF
FWD
CARGO
COMP
B2
MOT 1
[DC ESS]
CPC 1
[DC ESS]
MAN
MOT
[DC BAT]
MAN V/S
SWITCH
MOT 2
[DC2]
CPC 2
[DC2]
A321 only
OUTLET ISOL
VALVE
SMOKE DETECT
CONTROL UNIT
SDCU
CH1 [DC ESS SHED]
CH2 [DC2]
SQUIBS
B [DC BAT]
EXTRACT FAN
[AC1]
AFT
CARGO
COMP
A321 only
BULK
INLET
ISOL
VALVE
CABIN
AMBIENT
AIR
ZONE CTL
CH1 [AC1/DC1]
CH2 [AC2/DC2]
B1
X-BLEED VLV
AUTOCTL [DC2]
MANCTL [DC ESS SHED]
HOT BLEED
COLD FAN AIR
COLD AIR FROM PACK
MIXED CONDITIONNED AIR
PACK 2 CTL
CH1 [AC1/DC1]
CH2 [AC2/DC2]
FF
FF
temperature
indication
FLAP
VALVE
EMER
RAM AIR AIRCOND
GND
[DC ESS]
CONNECT
PACK 2
FLOW
CONTROL
VALVE [DC2]
PACK
2
LOOP A
LOOP B
COCKPIT
TRIM
AIR VALVES
MIXING
UNIT
(ENG 1 only)
BLEED MONITORING
COMPUTER
BMC 1 [DC ESS SHED]
BMC 1 [DC2]
PACK 1 CTL
CH1 [AC1/DC1]
CH2 [AC2/DC2]
PACK CTL
Prim fail => flow not optimized
Sec fail => ECAM sgnal lost
Both fail => 15C by a/ice vlv
ZONE CTL
Prim fail => 24C by packs
CABIN
Sec fail => no effect
AIR
Both fail => 20C pack 1
10C pack 2
FILTER
CAB FAN 1
[AC1]
HOT AIR
PRESS
REG VLV
SKIN
EXCH
INLET
BYPASS
VLV
cargo
under-floor
HP VLV
ENG 1 [DC ESS SHED]
ENG 2 [DC2]
ZONE CTL
CH1 [AC1/DC1]
CH2 [AC2/DC2]
PACK
1
FILTER
SKIN
EXCH
ISOL
VLV
AIRCOND
CARGO
VENTILATION
CONTROL
FWD
CABIN
TRIM
AIR VALVES
AFT
CABIN
CAB FAN 2
[AC2]
FILTER
SATCOM
CABIN AIR
(85% recycle air)
PRESSURIZATION
- 2 safety valves (max 8.6psi or -.25psi)
- if RAM AIR ON and p<1psi, outflow vlv
is 50% open (if not in MANUAL)
- EXCESS CAB ALT (>9550+/-350ft)
FIRE PROTECTION
& CARGO VENT
SMOKE DETECTORS
F
FIRE DETECTORS
FIREX BOTTLES
ELECTRICAL SUPPLY
ENG 1 loop A [DC ESS], loop B [DC2]
ENG 2 loop A [DC2], loop B [DC ESS]
APU loop A & B[DC BAT]
ENG 1&2 BTL 1 squib A [HOT1] squib B [HOT2]
ENG 1&2 BTL 2 squib A [DC2] squib B [DC2]
APU BTL squib A [HOT1] squib B [DC BAT]
APU auto extinguish [DC BAT]
ENGINE
FUEL A319/A320
FUEL
EIU
NOZZLES ENG1 [DC BAT]
ENG2 [DC ESS]
19088kg
A321 FUEL
18960kg
BATTERIES
2 x 28V 23 Ah, allow at
least 20min in-flight PWR
DC BAT BUS
BAT 1
BAT
CONT
HOT BUS 1
FIRE ENG 1&2 BTL 1 SQUIB A, APU BTL
SQUIB A
FLT CTL ELAC 1, SEC 1
FUEL APU LP VLV
HYD RAT AUTO CTL
LDG GEAR PARK BRK CTL
NAV ADIRU 3 (5min if on NORM or F/O)
DC TIE
CONT
STAT
INV
CONT
TR 1
HOT BUS 2
DC TIE
CONT
DC ESS
DC BUS 2
STAT
INV
CONT
DC ESS SHED
STATIC
INVERTER
converts DC into AC
speed>50kts & on
batteries only:
STAT INV activates
regardless of BAT
switch position
ESS TR
AC BUS 1
DC FLT/GND
RAT
AC BUS 2
AC ESS
FEED
(ALTN)
AC ESS SHED
BUS TIE
CONT
GCU
(1 per generator)
controls frequency
and voltage
GEN
LINE
CONT
GEN
1
AC FLT/GND
to L & R
FUEL PUMP 1
in SMOKE config
converts AC 115V
into DC 28V
max 200A
5kVA 115V
400Hz
AC ESS
AC ESS
FEED
(NORM)
TR 2
BLUE HYD
EMER
GEN
identical
to TR1&2
failure of TR1
and/or TR2 or
AC1
A320
ELECTRICAL
converts AC 115V
into DC 28V
max 200A
BAT
CONT
ESS DC TIE
DC BUS 1
COND PACK 1 PRIM, PACK 2 PRIM, ZONE
CTL PRIM, AEVC
COM VHF 3, SELCAL, 3rd ACP,
FUEL LEFT TK PUMP 1, RIGHT TK PUMP 1,
CTR TK PUMP 1 (A319/A320), LEFT XFR
VLV (A321)
HYD ENG 1 PUMP CTL
ICE ENG A/ICE CLOSURE VLV 1, WHC 1,
STBY PHC, STBY & CAPT STATICS, CAPT
TAT, CAPT WIPER
LDG GEAR BSCU CH1
LIGHTS L CONSOLE, R MAIN INST PNL,
SUPP READ, PEDESTRAL, L READ, L
BRIEF, L MAP, FLOOR
NAV GPS 1, CFDS
ENGINE ENG 1 OIL PRESS & QTY
BAT 2
APU
LINE
CONT
APU
GEN
EXT
PWR
CONT
GEN
LINE
CONT
GEN
2
GPCU
EXT
PWR
LEGEND
normal PWR distribution
PWR on BAT only
PWR with EMER GEN
alternate feeding lines
Busses in red are available in
EMER ELEC config with EMER
GEN running