0% found this document useful (0 votes)
376 views4 pages

Engineering 2

This document provides an index and revision history of standards and specifications for substation equipment and systems (SES), substation monitoring and supervisory systems (SMSS), and substation construction standards (SCS). It lists over 50 standards, specifications, and drawings covering topics like fire detection systems, gas flooding systems, painting standards, instrumentation symbols, emergency shutdown systems, HVAC systems, electrical power systems, cable specifications, grounding practices, and communications facilities. Most items are identified by document number, title, revision number and date.

Uploaded by

Tori Small
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
376 views4 pages

Engineering 2

This document provides an index and revision history of standards and specifications for substation equipment and systems (SES), substation monitoring and supervisory systems (SMSS), and substation construction standards (SCS). It lists over 50 standards, specifications, and drawings covering topics like fire detection systems, gas flooding systems, painting standards, instrumentation symbols, emergency shutdown systems, HVAC systems, electrical power systems, cable specifications, grounding practices, and communications facilities. Most items are identified by document number, title, revision number and date.

Uploaded by

Tori Small
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CONTENTS

SES MENU

SMSS MENU

SCS MENU

SES

DRAWINGS

ISSUE NO. 39 / 2002- 09

INDEX OF SES (UPDATED)

SES- B- 001

REV. 1 / 2002- 03

FIRE DETECTION AND ALARM SYSTEMS

(UPDATED)

SES- B- 002

REV. 0 / 1988- 01

HALON 1301 TOTAL FLOODING SYSTEMS

SES- B- 003

REV. 0 / 1988- 01

CARBON DIOXIDE (CO2 TOTAL FLOODING SYSTEMS )

SES- B- 004

REV. 0 / 1988- 04

DELUGE SYSTEMS

SES- H- 001

REV. 0 / 1984- 04

PAINTING

SES- H- 001.01

REV. 3 / 1998- 11

PAINT COLOR CODES AND STANDARDS

SES- J-004

REV. 0 / 1985- 06

INSTRUMENTATION AND CONTROL DRAWING SYMBOLS

SES- J- 300

REV. 0 / 1990- 03

EMERGENCY SHUTDOWN S YSTEM

SES- K- 100

REV. 2 / 1999- 12

HEATING, VENTILATING AND AIR CONDITIONI NG SYSTEM

SES- P- 103.00

Issue #1/ 1999- 06

CONTROL SHEET

SES- P- 103.01

REV. 1 / 1986- 08

GENERAL

SES- P- 103.02

REV. 3 / 1998- 04

STORAGE BATTERY SELECTION AND CAPACITY DETERMINATION

SES- P- 103.03

REV. 3 / 1998- 04

BATTERY CHARGER SIZING

SES- P- 103.04

REV. 2 / 1997- 04

STORAGE BATTERY INSTALLATION

SES- P- 103.05

REV. 1 / 1986- 08

UNINTERRUPTABLE POWER SYSTEMS

SES- P- 103.06

REV. 3 / 1998- 04

COMMUNICATION DC POWER S YSTEMS

CONTENTS

SES MENU

SMSS MENU

SCS MENU

DRAWINGS

SES- P- 104.00

Issue# 5/ 2002-09

CONTROL SHEETS (UPDATED)

SES- P- 104.01

REV. 1 / 2001-03

GENERAL

SES- P- 104.02

REV. 1 / 1998- 10

CABLE CONSTRUCTION

SES- P- 104.03

REV. 0 / 1985- 01

CABLE SIZING AND S ELECTION

SES- P- 104.04

REV. 2 / 2002- 09

SPLICE AND TERMINATION (UPDATED)

SES- P- 104.05

REV. 5 / 1999- 06

CABLE INSTALLATIONS ENGINEERING REQUIREMENTS

SES- P- 104.06

REV. 0 / 1985- 01

CABLE FIRE PROTECTION

SES- P- 104.07

WITHDRAWN, REFER TO SCS- P- 104. 08

SES- P- 104.08

REV. 0 / 1999- 04

BONDING AND GROUNDING OF INSULATED METALLIC SHEATH

SES- P- 111.02

REV. 0 / 1986- 10

COMMUNICATION FACILITY GROUNDING

SES- P- 119

SUBSTATION DESIGN STANDARDS

SES- P- 119. 00

Issue # 8/ 2002-06

CONTROL SHEET

(UPDATED)

SES- P- 119. 01

REV. 0 / 1996- 11

INTRODUCTION

SES- P- 119. 02

REV. 0 / 1996- 11

BASIC DESIGN ASPECTS

SES- P- 119. 05

REV. 0 / 1996- 11

INSULATION COORDINATION

SES- P- 119. 06

REV. 0 / 1997- 01

SURGE PROTECTION

SES- P- 119. 07

REV. 0 / 1996- 11

SHIELDING

SES- P- 119. 08

REV. 0 / 1996- 11

CLEARANCES

SES- P- 119. 09

REV. 0 / 1997- 04

BUSBARS AND S UPPORTING STRUCTURES

SES- P- 119. 10

REV. 1 / 2002- 11

GROUNDING

(UPDATED)

CONTENTS

SES MENU

SMSS MENU

SCS MENU

DRAWINGS

SES- P- 119. 11

REV. 1 / 2002- 03

INSULATORS

(UPDATED)

SES- P- 119. 12

REV. 0 / 1997- 01

APPLICATION CRITERIA FOR ELECTRICAL EQUIPMENT

SES- P- 119. 18

REV. 0 / 1997- 04

FOUNDATIONS

SES- P- 119. 19

REV. 2 / 2001- 11

BUILDING AND YARD

SES- P- 119. 20

REV. 0 / 1997- 01

LV CABLE RACEWAYS AND CABLE INSTALLATION P RACTICES

SES- P- 119. 21

REV. 2 / 2002- 03

FIRE AND LOSS PREVENTION REQUIREMENTS

SES- P- 119. 25

REV. 2 / 2001- 03

LIGHTING AND RECEPTACLES FOR SUBSTATION YARD AND

(UPDATED)

(UPDATED)

BUILDING
SES- P- 119. 27

REV. 1 / 2001- 11

SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)

(UPDATED)

SES- P- 119. 29

REV. 0 / 1997- 01

LV CABLE SELECTION AND SIZING

SES- P- 119. 30

REV. 2 / 2002- 06

AUXILIARY POWER SYSTEMS

SES- P- 119. 31

REV. 0 / 1997- 04

METERING DEVICES

SES- P- 119. 33

REV. 1 / 1999- 12

SUBSTATION ELECTRICAL DIAGRAMS

SES- P- 122. 01

REV. 3 / 2001- 11

BASIC D ESIGN REQUIREM ENTS

SES- P- 122. 03

REV. 3 / 2001- 09

CONDUCTORS AND OVERHEAD GROUND WIRES

SES- P- 122. 04

REV. 4 / 2002- 06

LINE HARDWARE AND FITTINGS FOR CONDUCTOR AND OVERHEAD GROUND


WIRE
(UPDATED)

SES- P- 122 05. P1

REV. 3 / 1998- 04

TRANSMISSION STRUCTURES - Latticed Steel Structures.

(UPDATED)

(UPDATED)

SES- P- 122. 05. P2 REV. 3 / 1998- 04

TRANSMISSION STRUCTURES - Steel Poles

SES- P- 122. 05. P3 REV. 3 / 1998- 04

TRANSMISSION STRUCTURES - Wood Poles

SES- P- 122. 06

REV. 1 / 1990- 10

TRANSMISSION FOUNDATIONS

SES- P- 122. 07

REV. 3 / 1999- 06

TRANSMISSION STRUCTURE SPOTTING

(UPDATED)

CONTENTS

SES MENU

SMSS MENU

SCS MENU

DRAWINGS

SES- P- 122. 08

REV. 1 / 1990- 10

SURVEY GUIDELINES

SES- P- 122. 09

REV. 0 / 1999- 04

CLEARANCE AND RI GHT OF WAY REQUIREMENTS

SES- P- 122. 10

REV. 1 / 1999- 04

GROUNDING

SES- P- 122. 11

REV. 2 / 2002- 09

ACCESS ROADS AND STRUCTURE PADS

SES- S- 100- 127

REV. 0

SAFETY AND SECURITY

SES- S- 129

REV. 0 / 1997- 04

PIPELINES FOR THE CONVEYANCE OF PETROLEUM AND GAS ON- SHORE

SES- S- 130

REV. 0 / 1988- 09

GENERAL PROCEDURES/ SAFETY STANDARDS FOR BLASTING NEAR SCECOEAST FACILITIES

SES- T- 011

REV. 0 / 1987- 02

SYMBOLS COMMUNICATIONS

SES- T- 153

REV. 0 / 1989- 03

COMMUNICATION FACILITY LIGHTNING & ELECT. PROTECTION

SES- T- 556

REV. 0 / 1988- 06

CIRCUIT QUALITY AND P ERFORMANCE

SES- T- 558

REV. 0 / 1991- 07

COMMUNICATIONS FEEDER CABLES

SES- T- 559

REV. 0 / 1991- 05

COMMUNICATIONS DISTRI BUTION CABLES

SES- T- 560

REV. 0 / 1992- 03

OUTSIDE PLANT STANDARDS AND PRACTICES

SES- T- 742

REV. 0 / 1987- 01

BUILDI NG ENGINEERI NG FIRE PROTECTION OF COMM. FACILITIES

SES- T- 743

REV. 0 / 1987- 06

ENVIRONMENTAL CONSIDERATIONS FOR COMMN. SITES AND REMOTE COMM.


TERMINALS

SES- T- 744

REV. 0 / 1987- 06

DESIGN CRITERIA FOR COMMUNICATION TOWERS

SES- W- 1

REV. 0 / 1984- 06

GENERAL WELDI NG CRITERIA

(UPDATED)

You might also like