Reply To Queries:: S.No Clause No. / Page No. Comment Reply

The document is a reply to queries regarding a project specification. It addresses 3 queries, accepting changes to specify 3 pumps rather than 2, confirming the motor control center will be located in the pump house electrical room, and clarifying that cleaning up debris and temporary structures is the contractor's responsibility.

Uploaded by

Monu Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views1 page

Reply To Queries:: S.No Clause No. / Page No. Comment Reply

The document is a reply to queries regarding a project specification. It addresses 3 queries, accepting changes to specify 3 pumps rather than 2, confirming the motor control center will be located in the pump house electrical room, and clarifying that cleaning up debris and temporary structures is the contractor's responsibility.

Uploaded by

Monu Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Reply to Queries:

S.No

Clause No. / Page


No.

Comment

Cl. No.- 2.1 / (f),


Page no.-6

All three pumps as


there are three
pumps not two

Cl. No.- 2.1 / (h),


Page no.-6

MCC / VFD panels


should be placed at
Pump House E Room

Cl. No.- 2.1 / (t),


Page no.-8

Are Cleaning up at
site of all debris and
temporary structures
in the contractors
scope

Reply
Accepted. But at any given
point of time only two pumps
are required to operate and
the third will be a standby
Accepted, The Motor control
centre (MCC) shall be housed
in the pump house Electrical
room (E room)
Yes, This is in contractors
scope.