004 Defect Radar Furuno STBD Side

1. The starboard side Furuno 21" radar on the MV.SETIA EMAS was occasionally not detecting targets within range during a sail out to the Buhaseer Oilfield. 2. The defect was investigated onboard and suspected to be caused by a magnetron that needed renewal. 3. Switching the radar off and on again for 5 minutes did not reproduce the issue, and the scanner was found to be satisfactory, so the defect was not able to be repaired onboard. Further action through a work order request was required.

Uploaded by

Jeet Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views2 pages

004 Defect Radar Furuno STBD Side

1. The starboard side Furuno 21" radar on the MV.SETIA EMAS was occasionally not detecting targets within range during a sail out to the Buhaseer Oilfield. 2. The defect was investigated onboard and suspected to be caused by a magnetron that needed renewal. 3. Switching the radar off and on again for 5 minutes did not reproduce the issue, and the scanner was found to be satisfactory, so the defect was not able to be repaired onboard. Further action through a work order request was required.

Uploaded by

Jeet Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC

Vessel: MV.SETIA EMAS


Location: AT SEA

What is wrong? (Defect details)

Observer Stbd Side Radar Furuno 21


During Sail Out to Buhaseer Oilfield No
Detect of the Target Occasionally in the
Range

Send to:

Investigation
(Cause of defect)

Suspected the
Magnetron need to be
renewed

If the defect could not be repaired onboard, and onshore support


is needed, then please complete this work order request.

Details of work required.

Designated Person/technical Manager

DEFECT REPORT / D 004

Action taken onboard to repair the defect.

Switched off for the while 5 Minutes


and Switched On no target observer,
Checked the scanner found satisfactory

WORK ORDER

If YES, send this report


to office for information.

If NO, complete Work


Order request (below) and
send for further action.

For approval send to:


Designated Person/technical Manager

Repairs carried out


satisfactorily.
(Signed by originator)

To be completed by Supervisor
Repairs carried out and
spare parts used

Defect repaired? YES/NO.

Repaired by
(Signature)

Required for the Technician

Form No. SMS/29/Rev. 1

Date: 06/07/2014

ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC


Corrective and Preventive Action :

Name of Originator: NURUL AMIN


Title
: MASTER
Date
: 06 July 2015
Signature
:

Form No. SMS/29/Rev. 1

Approved By :
Name :.
Date :.
Signature:

Date: 06/07/2014