From NSCP Sec.204.1,204.2, and 204.3 Dead Load Computation at Third Floor: (TW 6.5m)

The document provides calculations for the dead load at the third floor of a building, which includes the weight of the concrete slab, floor finish, electrical layout, ceiling, and beams. It lists the individual load contributions of each component, and then calculates the total uniform load of 33.16 kN/m applied to a section of the third floor framing, consisting of spans I-J, J-K, and K-L each with given lengths. The bending moments at joints I, J, K, and L of that framing section are then listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

From NSCP Sec.204.1,204.2, and 204.3 Dead Load Computation at Third Floor: (TW 6.5m)

The document provides calculations for the dead load at the third floor of a building, which includes the weight of the concrete slab, floor finish, electrical layout, ceiling, and beams. It lists the individual load contributions of each component, and then calculates the total uniform load of 33.16 kN/m applied to a section of the third floor framing, consisting of spans I-J, J-K, and K-L each with given lengths. The bending moments at joints I, J, K, and L of that framing section are then listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

From NSCP Sec.204.1,204.2,and 204.

3
Dead Load Computation @ Third Floor:(TW=6.5m)
Slab Thickness - 170mm or 0.17m (computed) Density Unit of Concrete = 24km/m3
=
24kN/m3(0.17m)(6.5m) = 26.52kN
m
Floor Finish - Slate(per mm thickness)
=
(0.028kPa)(6.5m) = 0.18kN
m
Electrical Lay-out - assumed 0.11kPa
=
(0.11kPa)(6.5m) = 0.72kN
m
Ceiling - Plaster on Tile or Concrete and Mechanical Duct Allowance
=
(0.20kPa+0.24kPa)(6.5m) = 2.86kN
m
Beam - 300mm x 400mm or .30m x .40m Density Unit of Concrete = 24km/m3
=
(24km/m3)(.30m x .40m) = 2.88kN
m

Frame 5
Slab Thickness
Floor Finish
Electrical Lay-out
Ceiling
Beam

Span A-B,B-C,C-D,D-E,E-F,F-G,G-H,H-I = Span L-M,M-N,N-O,O-P,P-Q,Q-R,R-S,S-T


(Open Space)
(Open Space)
(Open Space)
(Open Space)
(Open Space)

Span I-J,J-K,K-L
26.52kN/M
0.18kN/M
0.72kN/m
2.86kN/m
2.88kN/m
33.16kN/m

Frame-5
I

K
33.16kN/m

7m

6m

7m

MI = -142.55kN.m
MJ = -113.63kN.m
MK = -113.63kN.m
ML = -142.55kN.m