Traffic Census Data Sheet: Weekly Traffic Summary Construction of Mudkhusra Boridkala Kasawahi Road Length 3.0 KM

The document is a traffic census data sheet and construction proposal for the Mudkhusra Boridkala Kasawahi Road in Chhattisgarh, India. It summarizes weekly traffic data from April 17 to 23, 2016, including average daily traffic of 1,164 vehicles. Based on a commercial vehicle count of 130, 5% annual growth rate, 15-year design life, and 5% CBR subgrade strength, the proposed pavement composition is 540mm total thickness including 240mm granular sub-base, 250mm wet mix macadam, 50mm dense bituminous macadam, and 25mm semi-dense bituminous concrete. The design meets standards for estimated commercial traffic of 2 million standard

Uploaded by

gagajain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views2 pages

Traffic Census Data Sheet: Weekly Traffic Summary Construction of Mudkhusra Boridkala Kasawahi Road Length 3.0 KM

The document is a traffic census data sheet and construction proposal for the Mudkhusra Boridkala Kasawahi Road in Chhattisgarh, India. It summarizes weekly traffic data from April 17 to 23, 2016, including average daily traffic of 1,164 vehicles. Based on a commercial vehicle count of 130, 5% annual growth rate, 15-year design life, and 5% CBR subgrade strength, the proposed pavement composition is 540mm total thickness including 240mm granular sub-base, 250mm wet mix macadam, 50mm dense bituminous macadam, and 25mm semi-dense bituminous concrete. The design meets standards for estimated commercial traffic of 2 million standard

Uploaded by

gagajain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Traffic Census Data Sheet

Weekly Traffic Summary


Construction of Mudkhusra Boridkala Kasawahi Road Length =3.0 km
Government Of Chhattisgarh Public Works Department
Date :- 17/04/16 TO 23/04/16 Per Day 24 Hours
Direction OF Traffic :Up From :
Down From :
Vehicle Class

DAY
1
4/17/2016
4/18/2016
4/19/2016
4/20/2016
4/21/2016
4/22/2016
4/23/2016
Total
Average Daily
Traffic

Village Road
kilometerage Of Count Staion :
Place Of Count Station :
District : Balod
State : Chhattisgarh

Cars,Jeeps,
Vans,ThreeWheelers

Motorised
two- Wheelers

Three
Wheeler/ Auto
Rickshaw

Trucks/
Tankers

Agricultural
Tractors/
Trailers

Buses

2
174
145
187
203
217
187
184
1297

3
204
286
267
213
256
304
215
1745

4
55
84
65
76
87
98
45
510

5
35
56
78
75
87
65
39
435

6
55
50
67
57
48
59
65
401

7
12
11
10
11
11
12
12
79

185.00

249.00

73.00

62.00

57.00

11.00

Average Comercial Vechile Per day :-

Annual
Drawn
Vehicles

Total

8
356
432
456
493
434
461
369
3001

9
85
78
76
101
112
105
123
680

10
976
1142
1206
1229
1252
1291
1052
8148

429.00

97.00

1164.00

Cycle

130.00
Engineer
P.W.D Sub Dn. No.2 Balod
Balod Dn. Balod

P.W.D.

Detail Estimate For


Construction of Mudkhusra Boridkala Kasawahi Road Length
=3.0 km
Length of proposed Road -3.00 k.m.
DESIGN OF FLEXIBLE PAVEMENT BY C.B. R. METHOD

Design Data
p

130.00

CVPD

2) Number of years between the last count and the years of completion of construction

Years

3) Annual growth rate of commercial Vehicle for 5.0 %


r=0.05

0.05

n
n

8
15

Years
Years

3.5

(standard axle per commercial vehicle)

1) Number of Commercial Vehicle as per last Count

1.05

4) design life

For bitumen portion


For non bitumen portion

5)Vehicle Damaging Factor (VDF)


based on axle load survey

6) CBR of the 500 mm of the subgrade from borrow pits

Design Calculation
1)Distribution Factor as per para 4.5.1 IRC :37-2012
3)Traffic in the Years of completion

A=130 (1+0.05)1
137
(N)=365x[(1+r) -1]XAxDxF/r

4) Design traffic

137

A = P (1+r) x
CVPD

For bitumen portion

N=365x(1+0.05)8-1]x137x0.5x3.5/0.05
1671261.16266705
1.67 msa
(N)=365x[(1+r) -1]XAxDxF/r

4) Design traffic

say

msa

say

msa

540

mm

For non bitumen portion

N=365x(1+0.05)15-1]x137x0.5x3.5/0.05
3776626.25280258
3.78 msa

4) Pavement Composition interpolated from plate 3,CBR 5 %& Cumulative traffic 2


msa for bitumen portion & 4 msa for non bitumen portion respectively para 10.1
(IRC :37-2012)

Adopted Composition
1) Granular Sub Base
2) WMM
3) Bituminous Surfacing
a) Dense Bituminous macadum
b) Semi dense bituminous concrete

240
250

mm
mm

50
25

mm
mm

As per Design thickness is 540 mm


Hence, proposed Thickness of Crust =540 mm(safe)

Sub Engineer

Sub Divisional Officer


P.w.d Sub Division No.2 Balod