0% found this document useful (0 votes)
60 views1 page

COVER Ground Studi

The document discusses modifications to the storage and maintenance facilities at the LIRIK-Field manufactured terminal. It includes a grounding study for the project with the document number LIRIK-EL-CAL-003. The document has been issued for construction following reviews and approval.

Uploaded by

sugii97
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

COVER Ground Studi

The document discusses modifications to the storage and maintenance facilities at the LIRIK-Field manufactured terminal. It includes a grounding study for the project with the document number LIRIK-EL-CAL-003. The document has been issued for construction following reviews and approval.

Uploaded by

sugii97
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MODIFIKASI SISTEM PENYIMPANAN DAN PERBAIKAN

FASILITAS OPERASI DI TERMINAL BUATAN-FIELD LIRIK

GROUNDING
STUDY

DOCUMENT NUMBER :
LIRIK-EL-CAL-003

REV DATE DESCRIPTION PREP’D CHK’D APP’D CLIENT.

A 05/10/09 Issued For Review EPS TEU BS

B 18/11/09 Issued For Approval EPS TEU BS

0 12/01/10 Issued For Construction EPS TEU BS

You might also like