0% found this document useful (0 votes)
219 views8 pages

Drilling Mud Waste Water Treatment Using AOP Methods

The document describes an in-situ wastewater treatment system called ECO-MOBILE that uses non-thermal plasma technology to treat drilling mud wastewater. It uses an indirect plasma treatment concept involving ozone generation to reduce organic and inorganic compounds through advanced oxidation processes. The system is capable of treating 1000 bbl/day of drilling wastewater to reduce COD levels from over 15,000 ppm to under 200 ppm to meet regulatory standards for discharged water. Plasma Centre Indonesia provides the plasma treatment unit and operators while customers are responsible for mobilization and demobilization.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
219 views8 pages

Drilling Mud Waste Water Treatment Using AOP Methods

The document describes an in-situ wastewater treatment system called ECO-MOBILE that uses non-thermal plasma technology to treat drilling mud wastewater. It uses an indirect plasma treatment concept involving ozone generation to reduce organic and inorganic compounds through advanced oxidation processes. The system is capable of treating 1000 bbl/day of drilling wastewater to reduce COD levels from over 15,000 ppm to under 200 ppm to meet regulatory standards for discharged water. Plasma Centre Indonesia provides the plasma treatment unit and operators while customers are responsible for mobilization and demobilization.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Drilling Wastewater Treatment Unit

Plasma Centre Indonesia


Wisma Bumi Putera lt. 15, Jln. Jendral Sudirman kavling 75, Jakarta
12910

Plasma Centre Indonesia Simplify process


Drilling mud wastewater

wastewater

Plasma Centre Indonesia Simplify process


Basic Concept

in out

ECO-MOBILE is in-situ
treatment process.
It was designed to treat
wastewater which generated
from drilling process

Drilling wastewater pit Clean water


Plasma Centre Indonesia Simplify process 3
In-Direct plasma treatment concept
Water out
In-Direct
Inlet Filter Outlet
Chamber
Plasma-UV

Ozone
Generator

Ozone

Water in
Ozone generation using non-thermal plasma
Plasma Centre Indonesia Simplify process
Treatment Concept

wastewater AOP Coag/sed filtration clearwater

COD =100 (%) COD <10 (%) COD <1 (%) COD < 0.5 (%)

Reduced organic and Reduced metals and Reduced various


inorganic compounds solid particles micro particles

Plasma Centre Indonesia Simplify process 4


Drilling mud wastewater treatment
Oil Industry

Drilling mud
wastewater

In-direct plasma COD removal


Deodorizing

Chemical Solid removal

AC filter Neutralizing

Treated water
In-situ drilling wastewater treatment
Mud formation

Plasma Centre Indonesia Simplify process


Treatment handling services
• Treatment Capacity : 1000 bbl/day
• Wastewater type : Drilling mud
• Inlet profile : various max COD 15.000 ppm
• Outlet profile : COD 200 ppm (government regulations)
• Services cost : USD/IDR
• Customer responsible : Drilling company
– Mob-deMob
• PCI responsible :
– Electricity
– Plasma Unit
– Chemical
– Operator

before after
Plasma Centre Indonesia Simplify process
Thanks

Plasma Centre Indonesia Simplify process

You might also like