This document outlines a 4 stage method statement for constructing a non-suspended slab. Stage 1 involves casting the ground beam lower than original depth and leveling and compacting the sub-grade. Stage 2 places a damp proof membrane and steel reinforcement before casting the ground slab. Stage 3 levels the slab and applies a floor hardener. Stage 4 forms a groove line at the ends of the ground beam.

Uploaded by

Kelly
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views3 pages

Method Statement For Construction - Method Statement - Non Suspended Slab

This document outlines a 4 stage method statement for constructing a non-suspended slab. Stage 1 involves casting the ground beam lower than original depth and leveling and compacting the sub-grade. Stage 2 places a damp proof membrane and steel reinforcement before casting the ground slab. Stage 3 levels the slab and applies a floor hardener. Stage 4 forms a groove line at the ends of the ground beam.

Uploaded by

Kelly
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Method Statement For Construction: Method Statement - Non Suspended...

http://methodofconstruction.blogspot.com/2011/07/method-statement-no...

| Construction | Method Statement | Inspection Checklist | Construction Method | Project Management | Project Planning | Sample | Example |

1 of 3

2/8/2011 10:54 PM

Method Statement For Construction: Method Statement - Non Suspended...

http://methodofconstruction.blogspot.com/2011/07/method-statement-no...

WEDNESDAY, JULY 13, 2011

Method Statement - Non Suspended Slab


Method Statement For Construction Of Non Suspended Slab

SUPPORT THIS BLOG FOR M ORE INFORM ATION

ABOUT M E

BLOG ARCHIVE

mny Share this blog with your friends. View my complete profile

STAGE 1 1. Casting the ground beam 25mm lower from original depth 2. Leveling and well-compacted sub-grade and crusher run

2011 (10) July (5) Method Statement - Bored Cast-In-Place Piles Inspection Check List - General Earthwork Excavati... Inspection Check List - Structural Work (Reinforce... Inspection Check list - Piling Work Method Statement - Non Suspended Slab

STAGE 2 1. Placing damp proof polythene sheet and followed by B.R.C. layer 2. Casting the ground slab to required level as specified in the construction drawing
JOIN AND REQUEST FOR M ORE

June (5)

with Google Friend Connect

There are no members yet. Be the first!

Already a member? Sign in

STAGE 3 1. Leveling the slab with gradient to fall as specified in the construction drawing 2. Applying floor hardener finisher

STAGE 4 1. Forming a groove line by diamond cutter at both end of ground beam

2 of 3

2/8/2011 10:54 PM

Method Statement For Construction: Method Statement - Non Suspended...

http://methodofconstruction.blogspot.com/2011/07/method-statement-no...

*The illustration and information is for guidance only. Please refer to your engineer or consultant for further advise.

Posted by mny at 11:40 AM Labels: Non Suspended Slab

0 comments: Post a Comment

Comment as:

Newer Post Subscribe to: Post Comments (Atom)

Home

Older Post

3 of 3

2/8/2011 10:54 PM

You might also like