KETERANGAN
5/7 atap genteng 8/12
8/12
+ 10.39
2x 5/10
DAK BETON
RAILING BALKON
+ 7.34 + 7.34 + 6.24 + 7.34
+ 4.96 + 4.14 + 3.74 + 3.74 + 3.74 ROOM 3 + 4.14
+ 1.14 + 0.54 0.00 120 A B
ROOM 1 + 0.54 0.00 400 B' 100 100 C D 361,5 D'
POTONGAN.A-A
SCALE 1 : 100
01
IMAGINE
TAMPAKDEPAN
SCALE 1 : 100
01
IMAGINE
8/12 atap genteng
8/12
+ 10.39
NO. DATE
SUBJECT
+ 7.34 + 7.34 + 6.24
Proyek
+ 7.34
+ 7.34
+ 7.34
+ 4.14 + 3.74
KM / WC + 4.09
ROOM 3 + 4.14
ROOM 4 + 4.14
ROOM 5 + 4.14
KANTOR (TEGAL)
+ 3.74
Pemilik Proyek
+ 3.74
+ 3.74
+ 0.54 0.00 0.00 160 1 2 475
ROOM 1 + 0.54
ROOM 2 + 0.54
515 2' 3
515 3' 4
Arsitek Perencana
Ivan Hanley S.T.
Asisten Arsitek
Perencana Sipil
POTONGAN.B-B
SCALE 1 : 100
Digambar
Imgn / 18 July 2011
01
IMAGINE
Diperiksa
Disetujui
DRAWING NO
CODE
JOB NO
ARS - 002
JUDUL GAMBAR TANGGAL HALAMAN
- TAMPAK & POTONGAN
17 JULI 2011
02 00
ALL DESIGN ARE THE PROPERTY OF THE ARCHITECT AND CANNOT BE USED WITHOUT THEIR WRITEN PERMISION ALL DIMENSION MUST BE CHEKED AND VERIFIED ON SITE BEFORE COMMENCEMENT OF WORK. THE DESIGNER MUST BE INFORMED OF ANY DISCREPANCY AT SITE IMMEDIATELY