This is reference to the various discussions over Phone with us please find below the consolidated requirement of RDSO inspection of our New Flash butt welding machine.
Action to be take for RDSO inspection of new FBW machine Sl.No. 1 Materials Rail Pieces Specification 60Kg Rail Section Qty 32 Uom Nos Length Remarks
Rem
750mm Reqd for making 16nos test piece, 1.5 mtr each(10nos for Transverse load test& Hardness Test + 6 nos for Macro test), straightness of cutting end of rail should be as per RDSO FBW manual. 750mm Reqd for making 16nos test piece, 1.5 mtr each(10nos for Transverse load test& Hardness Test + 6 nos for Macro test), straightness of cutting end of rail should be as per RDSO FBW manual. For cutting of rail. For cutting of rail. For grinding of welded rails. For grinding of welded rails.
NB:No. of Test pieces to b RDSO instruction, It is on
Rail Pieces
52Kg Rail Section
32
Nos
3 4 5 6
Rail Cutting Machine Rail Cutting blade Grinding Machine Grinding Wheel 14" (Bipco Make) AG7(Bosch make) 7"(Bosch Make)
2 20 2 25
Nos Nos Nos Nos
Band Shaw Work Shop Fine polish paper Nitric Acid Transverse Load testing and Hard ness testing lab Dia-7",100 grade(approx)
Nos
For slicing of rail (length 100mm) Vertically from rail head for Macro testing. For polishing surface of sliced rail, For Macro test at site. For Macro test at site It may be Arakonam Srly,EWS.
NB: Searching Work Shop
8 9 10
10 2 8
Nos Ltrs nos (for each rail sec) Rmtr.
NB: Clint intimation letter
11 12 13 14 15 16 17 18 19
Cable Lighting Arrangement at Site USFD machine with operator Labour FBW Operator Vehicle Vehicle Diploma Engineer Manual
25sqmm,3core
25
If reqd to work at site,(for mainly rail cutting work after weld) 1 Skilled(Technical) With operator certificate Carriage Van Exicutive Car Plant Engineer OEM 6 1 1 1 1 1 Nos Persons person Nos Nos Person SET For transporting of test pieces to testing lab. Foe movement of RDSO inspector. As written in QAP Should be available at site Rail Cutting and grinding work
Mr.Dipankar Roy is hav
Hope Mr.Sudagar is hav certificate Available with Plant
We request you to arrange all the above for the RDSO inspection at site on
01.07.2011.