Questionnaire PM
Questionnaire PM
Blueprint
[Customer logo]
Changed by:
Version:
Table of Contents
A. Organization............................................................................................................. ....................6
1. Plant Maintenance................................................................................................. ................6
1.1. Maintenance Planning Plant.......................................................................... .....................6
1.2. Maintenance Plant............................................................................................ ..................6
1.3. Plant Section.................................................................................................................. .....6
1.4. Location.......................................................................................................... ....................6
1.5. Maintenance Planner Group................................................................................ ...............7
B. Master Data.................................................................................................................... ..............7
1. Plant Maintenance................................................................................................. ................7
1.1. Technical Objects (Structuring of Technical Systems).................................................... .....7
1.1.1. Functional Location.................................................................................................... ......7
1.1.2. Equipment..................................................................................................................... ...9
1.1.3. Fleet Object........................................................................................... ..........................12
1.1.4. Production Resource/Tool as Equipment............................................................ .............15
1.1.5. Reference Functional Location................................................................... .....................15
1.1.6. Bill of Material for Functional Location........................................................... ..................16
1.1.7. Equipment Bill of Material............................................................................. ...................16
1.1.8. Object Link.............................................................................................................. .........17
1.1.9. Installed Base............................................................................................. .....................17
1.2. Task Lists........................................................................................................... .................18
1.2.1. General Task List........................................................................................... ..................18
1.3. Maintenance Plans..................................................................................... ........................18
1.3.1. Single Cycle Plan........................................................................................................ .....19
1.3.2. Multiple Counter Plan...................................................................................................... .19
1.3.3. Strategy Plan.............................................................................................. .....................20
1.4. Solution Database.............................................................................................................. .21
1.4.1. Symptom....................................................................................................................... ...21
1.5. Additional Master Data................................................................................................ ........22
1.5.1. Warranty................................................................................................... .......................22
1.5.2. Counter/Measuring Point.............................................................................. ...................22
1.5.3. Revision............................................................................................................. ..............23
1.5.4. Catalog.................................................................................................... ........................23
1.5.5. Permit 23
C. Business Processes.................................................................................................... .................23
1. Plant Maintenance................................................................................................. ................23
1.1. Breakdown Maintenance Processing........................................................................... .......24
1.1.1. Notification......................................................................................................... ..............24
1.1.1.1. Notification Creation/Processing........................................................................ ...........24
1.1.1.2. Task Definition.............................................................................................................. .26
1.1.1.3. Notification Printing........................................................................................... ............27
1.1.1.4. Entry of Technical Findings.......................................................................... .................27
1.1.1.5. Notification Archiving................................................................................................... ..27
1.1.2. Order 27
1.1.2.1. Order Creation/Processing................................................................. ..........................27
1.1.2.2. Material Planning......................................................................................... .................30
1.1.2.3. Order Permit............................................................................................ .....................31
1.1.2.4. Order Release................................................................................... ...........................31
1.1.2.5. Work Clearance Management............................................................... .......................32
1.1.2.6. Order Printing.................................................................................... ...........................32
1.1.2.7. Order Execution................................................................................................. ...........32
1.1.3. Capacity Planning................................................................................................. ...........33
1.1.3.1. Capacity Evaluation.................................................................................... ..................33
1.1.3.2. Capacity Dispatching and Leveling................................................................... ............34
1.1.4. Modification of Technical Systems................................................................. ..................34
1.1.4.1. Installation, Dismantling and Modification of Equipment.................................. .............34
1.1.5. Material Movements........................................................................................................ .35
2
PM_All.doc
ValueSAP -
5
PM_All.doc
ValueSAP -
A.Organization
1. Plant Maintenance
1.1. Maintenance Planning Plant
Questions:
A:
Q: 1) Do you want to set up plants specfically for maintenance requirements (in addition
to the common logistics plants)?
A:
A:
A:
1.3. Plant Section
Questions:
A:
1.4. Location
Questions:
A:
6
PM_All.doc
ValueSAP -
A:
A:
B.Master Data
1. Plant Maintenance
1.1. Technical Objects (Structuring of Technical Systems)
Questions:
A:
Q: 2) What kinds of technical objects do you handle (for example, objects that can be
dismantled or used for different purposes in different production stages etc.)?
A:
Q: 3) How is information about technical objects organized and stored in your company
(for example, via EDV, file cards or no information at all)?
A:
Questions:
Q: 1) Do you manage objects that are immovable and that usually have a long
operational life (for example, clarification plants)?
A:
A: [ ]Yes
[ ]No
A:
7
PM_All.doc
ValueSAP -
Q: 4) What do the hierarchy levels of the functional locations represent (for example,
cost center levels, production process levels)?
A:
A:
Q: 6) How detailed should the functional location hierarchy be (for example, number of
levels, installation and dismantling of equipment)?
A:
A:
Q: 8) How detailed should the last level of the hierarchy for functional locations be?
A:
Q: 9) Is it sometimes the case in your company that functional location numbers change
(for example, if you assign part of a technical system to another technical system)?
A:
Q: 10) Do you need to assign different numbers to functional locations (for example, (a)
from a procedural perspective and (b) from a measurement/control system perspective)?
A:
Q: 11) How should the different levels be linked together with regard to the transfer of
data?
A:
A: [ ]Yes
[ ]No
Q: 13) Do you need to record the performance of functional locations using measuring
points and counters?
A: [ ]Yes
[ ]No
8
PM_All.doc
ValueSAP -
Q: 14) If yes, is counter reading data transferred between the different levels?
A: [ ]Yes
[ ]No
Q: 15) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
A:
Q: 18) Do you want to analyze what influence the usage conditions have on the
susceptibility to damage of the installed equipment?
A:
Q: 19) Do you need to document your technical objects according to their usage time
for functional locations?
A:
Q: 20) Do you determine the business partners (internal and/or external) whose
address(es) you require, if you need maintenance requests for a particular functional
location?
A:
Q: 21) Do you want to archive master records for functional locations? If yes, provide a
copy of your document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
Q: 22) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
1.1.2. Equipment
Questions:
9
PM_All.doc
ValueSAP -
A:
Q: 2) List and describe the different categories of equipment that you maintain.
A:
A:
A:
Q: 5) Do you want to create your own serial numbers or do you use the serial number of
the manufacturer as a reference/key for that object?
A:
Q: 6) If you use serial numbers, on which level do you want to track their history
(including costing, statistics, and so on)?
A:
Q: 7) Does your equipment include particular assemblies that you want to handle
individually in order to perform damage and cost analyses? Describe them.
A:
Q: 8) Do you represent the different types of equipment using material master records
in conjunction with Materials Management (for example, inventory management, goods
movements)?
A: [ ]Yes
[ ]No
Q: 9) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:
Q: 10) Specify business partners (internal and/or external) for whom you require an
address when you need maintenance requests for a particular piece of equipment.
A:
A:
10
PM_All.doc
ValueSAP -
Q: 12) Do you need to link documents (for example, drawings, manuals) to equipment
master records? If yes, give some examples.
A: [ ]Yes
[ ]No
Q: 13) Do you measure and log the current condition of the equipment in the system
(for example, temperature, pressure, operating time)? If yes, describe the measuring points
and counters, which you use for different pieces of equipment.
A:
Q: 14) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 15) Describe the different warranties for your equipment, and specify whether these
should be recorded individually for each piece of equipment.
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
Q: 17) Does a technician in your company require a special work permit before starting
work on specific equipment?
A:
Q: 18) Does old data (for example, equipment master records, repair histories or
information about technical objects) have to transferred? Give a typical example.
A:
A:
A: [ ]Yes
[ ]No
Q: 21) Which changes to equipment do you want to document with a usage list?
A:
11
PM_All.doc
ValueSAP -
Q: 22) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
A:
Q: 24) Do you want to archive equipment master records? If yes, provide a copy of your
document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
Questions:
A:
Q: 2) List and describe the different categories of equipment that you maintain.
A:
A:
A:
Q: 5) Do you want to create your own serial numbers or do you use the serial number of
the manufacturer as a reference/key for that object?
A:
Q: 6) If you use serial numbers, on which level do you want to track their history
(including costing, statistics, and so on)?
A:
Q: 7) Does your equipment include particular assemblies that you want to handle
individually in order to perform damage and cost analyses? Describe them.
A:
12
PM_All.doc
ValueSAP -
Q: 8) Do you represent the different types of equipment using material master records
in conjunction with Materials Management (for example, inventory management, goods
movements)?
A: [ ]Yes
[ ]No
Q: 9) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:
Q: 10) Specify business partners (internal and/or external) for whom you require an
address when you need maintenance requests for a particular piece of equipment.
A:
A:
Q: 12) Do you need to link documents (for example, drawings, manuals) to equipment
master records? If yes, give some examples.
A: [ ]Yes
[ ]No
Q: 13) Do you measure and log the current condition of the equipment in the system
(for example, temperature, pressure, operating time)? If yes, describe the measuring points
and counters, which you use for different pieces of equipment.
A:
Q: 14) Do you track warranties? If yes, are you a guarantor, a warrantee, or both?
A:
Q: 15) Describe the different warranties for your equipment, and specify whether these
should be recorded individually for each piece of equipment.
A:
Q: 16) Do you want to obtain a note on the warranty automatically for a positive
warranty check result?
A:
Q: 17) Does a technician in your company require a special work permit before starting
work on specific equipment?
A:
13
PM_All.doc
ValueSAP -
Q: 18) Does old data (for example, equipment master records, repair histories or
information about technical objects) have to transferred? Give a typical example.
A:
A:
Q: 20) Which changes to equipment do you want to document with a usage list?
A:
Q: 21) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
Q: 22) Do you want to archive equipment master records? If yes, provide a copy of your
document archiving procedure. If this is not available, describe specific archiving
requirements.
A:
A:
Q: 24) Which data do you want to see/maintain within the fleet object?
A:
A:
Q: 26) For what purpose do you intend to use your fleet objects?
A:
Q: 27) Which engine types do your fleet objects have? Do you want to maintain these?
A:
A:
14
PM_All.doc
ValueSAP -
Q: 29) Which counter types do you require (for example, kilometer counter,
consumption counter, time counter and so on)?
A:
A:
A:
Questions:
Q: 1) Do you want to make the screen templates for processing technical objects
(functional location, equipment) user-specific?
A:
A:
A:
A:
A:
Questions:
A:
15
PM_All.doc
ValueSAP -
A: [ ]Yes
[ ]No
A:
Questions:
A: [ ]Yes
[ ]No
A:
Q: 3) Will you need to use engineering change management to control BOM changes?
A: [ ]Yes
[ ]No
Questions:
A: [ ]Yes
[ ]No
Q: 2) If yes, are they pieces of equipment that you want to trace on monitor?
A: [ ]Yes
[ ]No
Q: 3) If you use equipment hierarchies, describe some examples of when and how they
are structured.
A:
Q: 4) Does your equipment include larger components that you want to handle
individually, in order to create damage and cost analyses for them?
A:
A: [ ]Yes
16
PM_All.doc
ValueSAP -
[ ]No
A: [ ]Yes
[ ]No
A:
A:
Q: 9) Will you need to use Engineering Change Management to manage your BOMs?
A: [ ]Yes
[ ]No
A: [ ]Yes
[ ]No
A: [ ]Yes
[ ]No
Questions:
A:
Q: 2) If so, for which of the following objects do you want to display the links?
A:
Q: 3) Which types of relationship exist between the linked objects (1:1, 1:n, n:n)?
A:
Questions:
Q: 1) Do you want to use IBase management (a) purely for documentation and
management of an object structure (ie. a production process) or (b) as a limited substitute for
bills of material?
17
PM_All.doc
ValueSAP -
A:
A:
Q: 1) Do you have work plans for service tasks in your current IT system or databases?
A:
Q: 2) Do you want to archive maintenance task lists? If so, please provide a copy of
your document archiving policy if available. If this is not available, please describe specific
archiving requirements.
A:
Questions:
A:
A:
A:
Q: 1) How will you create maintenance plans (e.g., representing individual maintenance
items or by grouping a number of maintenance items)?
A:
Q: 2) Will you plan the preventive maintenance separatly for each maintenance
equipment or will you establish a preventive maintenance plan for a group of maintenance
objects (e.g., one plan for a production line that consists of several pieces of equipment)?
A:
18
PM_All.doc
ValueSAP -
Q: 3) Do you have different frequencies for the execution of your maintenance tasks
and would you like to have all of them in just one maintenance plan?
A:
A:
A:
Q: 6) Will you have pre-defined activity lists (task lists) for your different preventive
maintenance services that list the required work steps (including estimated work time), spare
parts and/or tools?
A:
Q: 7) If yes, are those activity lists specific for the different equipment types (machine
types) or different functional locations for which you offer preventive maintenance?
A:
Q: 8) Do you want to archive maintenance plans? If so, please provide a copy of your
document archiving policy if available. If this is not available, please describe specific
archiving requirements.
A:
Questions:
Q: 1) What criterion is the maintenance cycle based on for the single cycle maintenance
plan?
A:
A:
1.3.2. Multiple Counter Plan
Questions:
A:
19
PM_All.doc
ValueSAP -
Q: 2) Do you use cycle sets for the attachment of multiple counter plans?
A:
A:
Q: 4) Which time-base should be used (for example, calendar, factory calendar, key
dates)?
A:
A:
A:
A:
A:
Questions:
A:
Q: 2) Which time-base should be used (for example, calendar, factory calendar, key
dates)?
A:
A:
20
PM_All.doc
ValueSAP -
A:
A:
A:
Q: 1) Do you possess technical objects that are required for detailed technical
information in order to introduce necessary error handling?
A:
A:
A:
A:
Q: 5) Is error diagnosis an essential step in your area or is it "only" used for short-term
error handling?
A:
Q: 6) Are you already using (computer-supported) Help for error analysis and handling
based on a knowledge or error database?
A:
1.4.1. Symptom
Questions:
21
PM_All.doc
ValueSAP -
A:
Questions:
A:
A:
A:
Q: 4) Describe the different warranties for your objects and specify whether these
should be listed individually for each object.
A:
A:
Q: 6) Do you want to obtain a note on the warranty automatically for a positive warranty
check result?
A:
A:
Questions:
A: [ ]Yes
[ ]No
A: [ ]Yes
22
PM_All.doc
ValueSAP -
[ ]No
Q: 3) Do you measure and log the current condition of the equipment in the system (for
example, temperature, pressure, operating time)? If yes, describe the measuring points and
counters, which you use for different pieces of equipment.
A:
1.5.3. Revision
Questions:
Q: 1) Is there any revision planned where a production line or plant has to be shut down
for a certain time?
A:
1.5.4. Catalog
Questions:
A:
A:
1.5.5. Permit
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
A:
C.Business Processes
1. Plant Maintenance
Questions:
23
PM_All.doc
ValueSAP -
Q: 1) Do you want to transfer the maintenance history from your current system to SAP
R/3?
A:
A: [ ] Historical orders
[ ] Work orders
[ ] Notifications (activity report)
A:
Q: 4) How do you process maintenance costs (for example, settlement to cost center)?
A:
A:
A:
Q: 7) Do you want to set up a workflow for the processing of notifications and/or orders?
A:
Questions:
A:
A:
A:
24
PM_All.doc
ValueSAP -
Q: 4) Are you restricted to a certain period of time when executing these tasks?
A:
Q: 5) List the business partners (internal and/or external) whose address information
you require when creating the notification. Add other business partners, if necessary.
Q: 6) Do you want to be able to process related notification and order data collectively
in a single form?
A:
Q: 7) Do you want information about the reference object displayed automatically when
a notification is created? If yes, what information?
A:
A:
A: [ ]Yes
[ ]No
A:
Q: 11) Should the person responsible for a task be informed automatically by the
system?
A:
Q: 12) How do you want to configure the interface for your notification with regard to
control data, breakdown data, activity data, and task data?
A:
Q: 13) Do you have standard tasks that you always perform for different types of
notifications? If yes, please describe them in detail.
25
PM_All.doc
ValueSAP -
A:
Q: 14) Do you record the performed activities that solved the customer problem in a
standardized way (for example, using standardized codes) in order to evaluate possible
solutions for a problem?
A:
Q: 15) Do you want to set up an escalation workflow for notifications and tasks?
A:
A:
A:
Questions:
Q: 1) How do you plan the processing of a maintenance notification? Do you use tasks
during processing?
A:
A:
A:
A:
A:
A:
26
PM_All.doc
ValueSAP -
Questions:
A: [ ]Yes
[ ]No
Questions:
Q: 1) Do you record technical information (for example, which part of the equipment
was broken, damage, cause of damage) about a maintanence problem in order to create a
service history or to enable further evaluations?
A: [ ]Yes
[ ]No
A:
A:
A:
Questions:
A:
A:
1.1.2. Order
1.1.2.1. Order Creation/Processing
Questions:
27
PM_All.doc
ValueSAP -
Q: 1) What different types of maintenance do you have in your company (for example,
preventive maintenance, repair, installation)? Create a list of the maintenance types and
outline the differences in planning and execution.
A:
Q: 2) Mark in the following list whether maintenance tasks are performed by employees
and/or contractors.
A:
Q: 3) What information about labor resources (for example, availability and number of
people, duration of work, split of operation) do you require from the system when planning
maintenance orders?
A:
A:
Q: 5) Do you want to be able to process related notification and order data collectively
in a single form?
A:
A: [ ]Yes
[ ]No
A:
Q: 8) Do you want to configure a special search help for partners in your order?
A:
Q: 9) For which operation types do you want to represent the operation description
using service specifications?
A:
Q: 10) Do you want to define skills and/or qualifications for maintenance order
operations?
A: [ ]Yes
[ ]No
Q: 11) Do you provide the technicians who perform the preventive maintenance with a
list of activities? If yes, how detailed are they?
28
PM_All.doc
ValueSAP -
A:
A: [ ]Yes
[ ]No
Q: 13) If yes, which of the following types of task lists do you require?
A:
Q: 14) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
Q: 15) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 16) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 17) Do you want to generate purchase requisitions and reservations when the order
is created?
A:
Q: 18) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Q: 20) How do you want to plan special tools, documents and so on, which are required
to execute maintenance activities?
A:
Q: 21) Do you use work order permits, for example, to manage working conditions or
safety matters?
29
PM_All.doc
ValueSAP -
A: [ ]Yes
[ ]No
Q: 22) At what intervals do you want to schedule work (for example, daily, weekly,
monthly)?
A:
A:
Q: 24) At which level do you plan work (for example, for a shift, crew, skill, qualification,
or an individual person and so on)?
A:
Q: 25) How detailed is your planning (for example, usage backlog, capacity evaluation,
capacity scheduling)?
A:
Q: 26) Should the capacity load, which was formed for all the capacity types of the PP
work centers, be reduced for the duration of a maintenance task planned in a work order?
A:
A:
Q: 28) Do you use maintenance orders for processing investment measures? If yes,
should the asset under construction be created automatically or manually?
A:
Q: 29) Do you want the maintenance order to be integrated with one of the following
Controlling components?
A:
1.1.2.2. Material Planning
Questions:
Q: 1) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
30
PM_All.doc
ValueSAP -
A:
Q: 3) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 4) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 5) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
A:
Questions:
A:
A:
A:
31
PM_All.doc
ValueSAP -
Questions:
A:
A:
Q: 3) Which different approval steps are required for your work clearance process?
Describe the concept or process flow of your approval process.
A:
A:
A:
A:
Questions:
Q: 1) Identify the internal papers that you require for the different people and order
types involved (for example, job ticket for employee, picking list).
A:
A:
32
PM_All.doc
ValueSAP -
Questions:
A:
A:
A:
A:
Questions:
A:
Q: 2) Do you want to change capacity/work centers for periods with overload? (If yes,
consider changing the work center/assignment/activity dates manually from the evaluation
reports.)
A:
Q: 3) Do you do short term capacity planning? (If yes, ensure the time horizon for the
capacity evalution reflects the appropriate time period. If no, ensure the time horizon for the
capacity evaluation reflects the appropriate time period.)
A:
A:
A:
33
PM_All.doc
ValueSAP -
A:
1.1.3.2. Capacity Dispatching and Leveling
Questions:
Q: 1) Do you process the overload on capacities/wk centers? (If yes, you could use the
capacity leveling functions- dispatching and deallocating).
A:
Q: 2) Do you prefer to use a graphical planning tool for capacity leveling? (If yes, use
the graphical capacity planning tool If no, consider using the tabular capacity planning tool.)
A:
A: [ ]Yes
[ ]No
Q: 4) When you split order operations, do you want the system to create capacity loads
automatically for individual people?
A:
A:
A:
1.1.4. Modification of Technical Systems
1.1.4.1. Installation, Dismantling and Modification of Equipment
Questions:
A:
A:
A:
A:
A:
A:
Q: 7) Do changes also have to be made to the system master during modification work?
A:
Questions:
A:
A:
A:
Q: 4) How will the consumption of these parts be recorded and who will post their
withdrawal in the system?
A:
Q: 5) How do you document materials that are ordered for specific work orders?
A:
Q: 6) How do you wish to document which materials were received specifically for a
work order?
A:
Q: 7) How much time elapses between the actual goods issue and its posting in the
system?
A:
35
PM_All.doc
ValueSAP -
A:
A:
Q: 10) Is stock posted to the receiving site? If so, which type of stock (stock in transit,
available stock, etc.)?
A:
Q: 11) Which documents are generated in conjunction with this posting and what
information do they contain?
A:
Questions:
A:
A:
A:
A:
Q: 5) Do you also want to confirm used material at the same time as the time
confirmation?
A:
Q: 6) Should the technical completion (for example, for breakdown times, causes of
damage, tasks and so on) be made at the same time as the time confirmation?
A:
36
PM_All.doc
ValueSAP -
A:
A: [ ]Yes
[ ]No
A:
A:
Q: 11) How many times per day do your employees enter their working time?
A:
Q: 12) Will you use a Plant Data Collection (PDC) system for your completion
confirmations?
A:
Q: 13) Do you enter the working times of contractors? If yes, how should the external
services be entered?
A:
1.1.6.1. Individual Time Confirmation
Questions:
A:
Q: 2) Do you differentiate the times entered according to other activitiy types (for
example, to distinguish between normal work hours and overtime)?
A:
A:
Q: 4) In what unit and with what accuracy do you want to enter services?
37
PM_All.doc
ValueSAP -
A:
Questions:
A:
A:
Questions:
Q: 1) In which systems do you track employee master data? Are wage rates only
maintained in the R/3 System or in other systems too?
A:
Q: 2) Do you use this data as a basis for indirect activity allocation to cost objects, cost
centers, inernal orders and so on?
A: [ ]Yes
[ ]No
Q: 3) Explain how such a time sheet is structured today and how it should be structured
in future (what information do you need on the time sheet?).
A:
Q: 4) Does everyone who records working time have a personal number in HR? (If not,
CATS is not supported.)
A: [ ]Yes
[ ]No
A:
A:
Q: 7) Are the labor costs calculated based on actual costs or standard rates?
A:
38
PM_All.doc
ValueSAP -
A:
Q: 9) Please explain the procedure, how employees in your company track and report
time today.
A:
A:
Q: 11) Are there special conditions for labor costs when employees work in different
countries or for different profit centers (for example, if an employee from the UK works on a
project in Germany)?
A:
A:
Q: 13) How do your employees enter trip costs? Are the trips linked to the recording of
working time? Describe in detail.
A:
A:
Q: 15) Identify the different categories of activity (activity types) that you use for
estimation, planning and settlement purposes?
A:
Q: 16) What are the various cost collectors, to which employees will charge time (for
example, cost centers, projects, internal orders)?
A:
Q: 17) Do sub-contractors and other third party labor sources have to enter work using
timesheets?
A:
Q: 18) Are these external services settled to a cost center or directly to the project?
A:
39
PM_All.doc
ValueSAP -
A:
Q: 20) How is the cost of overtime calculated? Do you have different types of overtime
(for example, time and a half, double time)?
A:
Q: 21) Do you track indirect labor hours, such as vacation, sickness, holiday...? If yes,
define the categories you require and their entry type.
A:
Q: 22) Which financial entries do you currently make for your labor distribution?
A:
Q: 23) How do employees record their working time (time, detail, medium/system)?
A:
Questions:
Q: 1) What is your current timesheet approval strategy for employees and external
services?
A:
Q: 2) Explain the permit procedure for working time or recording of activity allocation for
your employees.
A:
A:
Q: 4) How many employees does the person responsible for approval manage?
A:
Questions:
Q: 1) Do you want to transfer recorded activity allocations to Controlling using the time
sheet?
40
PM_All.doc
ValueSAP -
A: [ ]Yes
[ ]No
Q: 2) How often does this transfer take place (daily, weekly and so on)?
A:
Q: 3) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
Questions:
Q: 1) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
A:
Q: 3) Do you need an evaluation, do see the days on which personnel enter more than
a defined number of hours?
A:
Q: 4) Do you have to see the employee name in the documents for the receiving
component?
A:
Q: 5) Do different roles need to see different timesheet information? (If yes, create
report variants.)
A:
Questions:
A:
Questions:
41
PM_All.doc
ValueSAP -
Q: 1) Do you record technical information (for example, which part of the equipment
was broken, damage, cause of damage) about a maintanence problem in order to create a
service history or to enable further evaluations?
A: [ ]Yes
[ ]No
A:
A:
A:
Questions:
Q: 1) Do you measure and record the current condition of your equipment in the system
(for example, temperature, pressure, operating time)? Describe the different measuring points
and counters that you require for the different pieces of equipment.
A:
A:
Questions:
A:
Questions:
A:
42
PM_All.doc
ValueSAP -
Questions:
A:
A:
Q: 3) How often and according to which rules do you want to settle orders ?
A:
A: [ ]Yes
[ ]No
Q: 5) Do you want to examine your cost elements for the settlement of orders in greater
detail?
A:
Questions:
Q: 1) Who decides whether the work is fully completed (business completion) and
when?
A:
A:
Questions:
Q: 1) Do you want to archive orders? If so, please provide a copy of your document
archiving policy. If this is not available, describe specific archiving requirements.
A:
Q: 2) How long do you want to retain orders in the system before they are archived?
A:
A:
43
PM_All.doc
ValueSAP -
Questions:
Q: 1) Do you create historical orders to keep track of maintenance work that has
already been completed?
A: [ ]Yes
[ ]No
Questions:
A:
Q: 2) Please describe in detail the different analyses/reports that you will use.
A:
Questions:
Q: 1) Note: For information about the maintenance plan, see documentation on master
data.
A:
Questions:
Q: 1) Do you schedule your maintenance plans manually, or should the system perform
the scheduling automatically?
A:
Questions:
A:
A: [ ]Yes
[ ]No
1.2.2. Notification
1.2.2.1. Notification Creation/Processing
44
PM_All.doc
ValueSAP -
Questions:
A:
A:
A:
Q: 4) Are you restricted to a certain period of time when executing these tasks?
A:
Q: 5) List the business partners (internal and/or external) whose address information
you require when creating the notification. Add other business partners, if necessary.
A:
Q: 6) Do you want to be able to process related notification and order data collectively
in a single form?
A:
Q: 7) Do you want information about the reference object displayed automatically when
a notification is created? If yes, what information?
A:
A:
A: [ ]Yes
[ ]No
A:
Q: 11) Should the person responsible for a task be informed automatically by the
system?
45
PM_All.doc
ValueSAP -
A:
Q: 12) How do you want to configure the interface for your notification with regard to
control data, breakdown data, activity data, and task data?
A:
Q: 13) Do you have standard tasks that you always perform for different types of
notifications? If yes, please describe them in detail.
A:
Q: 14) Do you record the performed activities that solved the customer problem in a
standardized way (for example, using standardized codes) in order to evaluate possible
solutions for a problem?
A:
Q: 15) Do you want to set up an escalation workflow for notifications and tasks?
A:
A:
A:
Questions:
A: [ ]Yes
[ ]No
1.2.3. Order
1.2.3.1. Order Creation/Processing
Questions:
Q: 1) What different types of maintenance do you have in your company (for example,
preventive maintenance, repair, installation)? Create a list of the maintenance types and
outline the differences in planning and execution.
A:
46
PM_All.doc
ValueSAP -
Q: 2) Mark in the following list whether maintenance tasks are performed by employees
and/or contractors.
A:
Q: 3) What information about labor resources (for example, availability and number of
people, duration of work, split of operation) do you require from the system when planning
maintenance orders?
A:
A:
Q: 5) Do you want to be able to process related notification and order data collectively
in a single form?
A:
A: [ ]Yes
[ ]No
A:
Q: 8) Do you want to configure a special search help for partners in your order?
A:
Q: 9) For which operation types do you want to represent the operation description
using service specifications?
A:
Q: 10) Do you want to define skills and/or qualifications for maintenance order
operations?
A: [ ]Yes
[ ]No
Q: 11) Do you provide the technicians who perform the preventive maintenance with a
list of activities? If yes, how detailed are they?
A:
A: [ ]Yes
[ ]No
Q: 13) If yes, which of the following types of task lists do you require?
A:
Q: 14) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
Q: 15) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 16) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 17) Do you want to generate purchase requisitions and reservations when the order
is created?
A:
Q: 18) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Q: 20) How do you want to plan special tools, documents and so on, which are required
to execute maintenance activities?
A:
Q: 21) Do you use work order permits, for example, to manage working conditions or
safety matters?
A: [ ]Yes
[ ]No
48
PM_All.doc
ValueSAP -
Q: 22) At what intervals do you want to schedule work (for example, daily, weekly,
monthly)?
A:
A:
Q: 24) At which level do you plan work (for example, for a shift, crew, skill, qualification,
or an individual person and so on)?
A:
Q: 25) How detailed is your planning (for example, usage backlog, capacity evaluation,
capacity scheduling)?
A:
Q: 26) Should the capacity load, which was formed for all the capacity types of the PP
work centers, be reduced for the duration of a maintenance task planned in a work order?
A:
A:
Q: 28) Do you use maintenance orders for processing investment measures? If yes,
should the asset under construction be created automatically or manually?
A:
Q: 29) Do you want the maintenance order to be integrated with one of the following
Controlling components?
A:
1.2.3.2. Material Planning
Questions:
Q: 1) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
A:
49
PM_All.doc
ValueSAP -
Q: 3) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 4) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 5) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
A:
Questions:
A:
A:
A:
50
PM_All.doc
ValueSAP -
Questions:
A:
A:
Q: 3) Which different approval steps are required for your work clearance process?
Describe the concept or process flow of your approval process.
A:
A:
A:
A:
Questions:
Q: 1) Identify the internal papers that you require for the different people and order
types involved (for example, job ticket for employee, picking list).
A:
A:
Questions:
51
PM_All.doc
ValueSAP -
A:
A:
A:
A:
Questions:
A:
Q: 2) Do you want to change capacity/work centers for periods with overload? (If yes,
consider changing the work center/assignment/activity dates manually from the evaluation
reports.)
A:
Q: 3) Do you do short term capacity planning? (If yes, ensure the time horizon for the
capacity evalution reflects the appropriate time period. If no, ensure the time horizon for the
capacity evaluation reflects the appropriate time period.)
A:
A:
A:
52
PM_All.doc
ValueSAP -
A:
1.2.4.2. Capacity Dispatching and Leveling
Questions:
Q: 1) Do you process the overload on capacities/wk centers? (If yes, you could use the
capacity leveling functions- dispatching and deallocating).
A:
Q: 2) Do you prefer to use a graphical planning tool for capacity leveling? (If yes, use
the graphical capacity planning tool If no, consider using the tabular capacity planning tool.)
A:
A: [ ]Yes
[ ]No
Q: 4) When you split order operations, do you want the system to create capacity loads
automatically for individual people?
A:
A:
A:
1.2.5. Modification of Technical Systems
1.2.5.1. Installation, Dismantling and Modification of Equipment
Questions:
A:
A:
A:
A:
53
PM_All.doc
ValueSAP -
A:
A:
Q: 7) Do changes also have to be made to the system master during modification work?
A:
Questions:
A:
A:
A:
Q: 4) How will the consumption of these parts be recorded and who will post their
withdrawal in the system?
A:
Q: 5) How do you document materials that are ordered for specific work orders?
A:
Q: 6) How do you wish to document which materials were received specifically for a
work order?
A:
Q: 7) How much time elapses between the actual goods issue and its posting in the
system?
A:
A:
A:
Q: 10) Is stock posted to the receiving site? If so, which type of stock (stock in transit,
available stock, etc.)?
A:
Q: 11) Which documents are generated in conjunction with this posting and what
information do they contain?
A:
Questions:
A:
A:
A:
A:
Q: 5) Do you also want to confirm used material at the same time as the time
confirmation?
A:
Q: 6) Should the technical completion (for example, for breakdown times, causes of
damage, tasks and so on) be made at the same time as the time confirmation?
A:
55
PM_All.doc
ValueSAP -
A:
A: [ ]Yes
[ ]No
A:
A:
Q: 11) How many times per day do your employees enter their working time?
A:
Q: 12) Will you use a Plant Data Collection (PDC) system for your completion
confirmations?
A:
Q: 13) Do you enter the working times of contractors? If yes, how should the external
services be entered?
A:
1.2.7.1. Individual Time Confirmation
Questions:
A:
Q: 2) Do you differentiate the times entered according to other activitiy types (for
example, to distinguish between normal work hours and overtime)?
A:
A:
Q: 4) In what unit and with what accuracy do you want to enter services?
A:
Questions:
A:
A:
Questions:
Q: 1) In which systems do you track employee master data? Are wage rates only
maintained in the R/3 System or in other systems too?
A:
Q: 2) Do you use this data as a basis for indirect activity allocation to cost objects, cost
centers, inernal orders and so on?
A: [ ]Yes
[ ]No
Q: 3) Explain how such a time sheet is structured today and how it should be structured
in future (what information do you need on the time sheet?).
A:
Q: 4) Does everyone who records working time have a personal number in HR? (If not,
CATS is not supported.)
A: [ ]Yes
[ ]No
A:
A:
Q: 7) Are the labor costs calculated based on actual costs or standard rates?
A:
A:
57
PM_All.doc
ValueSAP -
Q: 9) Please explain the procedure, how employees in your company track and report
time today.
A:
A:
Q: 11) Are there special conditions for labor costs when employees work in different
countries or for different profit centers (for example, if an employee from the UK works on a
project in Germany)?
A:
A:
Q: 13) How do your employees enter trip costs? Are the trips linked to the recording of
working time? Describe in detail.
A:
A:
Q: 15) Identify the different categories of activity (activity types) that you use for
estimation, planning and settlement purposes?
A:
Q: 16) What are the various cost collectors, to which employees will charge time (for
example, cost centers, projects, internal orders)?
A:
Q: 17) Do sub-contractors and other third party labor sources have to enter work using
timesheets?
A:
Q: 18) Are these external services settled to a cost center or directly to the project?
A:
A:
Q: 20) How is the cost of overtime calculated? Do you have different types of overtime
(for example, time and a half, double time)?
A:
Q: 21) Do you track indirect labor hours, such as vacation, sickness, holiday...? If yes,
define the categories you require and their entry type.
A:
Q: 22) Which financial entries do you currently make for your labor distribution?
A:
Q: 23) How do employees record their working time (time, detail, medium/system)?
A:
Questions:
Q: 1) What is your current timesheet approval strategy for employees and external
services?
A:
Q: 2) Explain the permit procedure for working time or recording of activity allocation for
your employees.
A:
A:
Q: 4) How many employees does the person responsible for approval manage?
A:
Questions:
Q: 1) Do you want to transfer recorded activity allocations to Controlling using the time
sheet?
A: [ ]Yes
[ ]No
59
PM_All.doc
ValueSAP -
Q: 2) How often does this transfer take place (daily, weekly and so on)?
A:
Q: 3) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
Questions:
Q: 1) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
A:
Q: 3) Do you need an evaluation, do see the days on which personnel enter more than
a defined number of hours?
A:
Q: 4) Do you have to see the employee name in the documents for the receiving
component?
A:
Q: 5) Do different roles need to see different timesheet information? (If yes, create
report variants.)
A:
Questions:
A:
Questions:
Q: 1) Do you measure and record the current condition of your equipment in the system
(for example, temperature, pressure, operating time)? Describe the different measuring points
and counters that you require for the different pieces of equipment.
60
PM_All.doc
ValueSAP -
A:
A:
Questions:
A:
Questions:
A:
Questions:
A:
A:
Q: 3) How often and according to which rules do you want to settle orders ?
A:
A: [ ]Yes
[ ]No
Q: 5) Do you want to examine your cost elements for the settlement of orders in greater
detail?
A:
Questions:
61
PM_All.doc
ValueSAP -
Q: 1) Who decides whether the work is fully completed (business completion) and
when?
A:
A:
Questions:
Q: 1) Do you want to archive orders? If so, please provide a copy of your document
archiving policy. If this is not available, describe specific archiving requirements.
A:
Q: 2) How long do you want to retain orders in the system before they are archived?
A:
A:
Questions:
Q: 1) Do you create historical orders to keep track of maintenance work that has
already been completed?
A: [ ]Yes
[ ]No
Questions:
A:
Q: 2) Please describe in detail the different analyses/reports that you will use.
A:
Q: 1) Do you have shutdowns in plants or plant areas, for which you require an exact
process flow for planning, execution, budget controlling, investment capitalization and so on?
62
PM_All.doc
ValueSAP -
A:
A:
1.3.1. Notification
1.3.1.1. Notification Creation/Processing
Questions:
A:
A:
A:
Q: 4) Are you restricted to a certain period of time when executing these tasks?
A:
Q: 5) List the business partners (internal and/or external) whose address information
you require when creating the notification. Add other business partners, if necessary.
A:
Q: 6) Do you want to be able to process related notification and order data collectively
in a single form?
A:
Q: 7) Do you want information about the reference object displayed automatically when
a notification is created? If yes, what information?
A:
A:
A: [ ]Yes
[ ]No
63
PM_All.doc
ValueSAP -
A:
Q: 11) Should the person responsible for a task be informed automatically by the
system?
A:
Q: 12) How do you want to configure the interface for your notification with regard to
control data, breakdown data, activity data, and task data?
A:
Q: 13) Do you have standard tasks that you always perform for different types of
notifications? If yes, please describe them in detail.
A:
Q: 14) Do you record the performed activities that solved the customer problem in a
standardized way (for example, using standardized codes) in order to evaluate possible
solutions for a problem?
A:
Q: 15) Do you want to set up an escalation workflow for notifications and tasks?
A:
A:
A:
Questions:
A: [ ]Yes
[ ]No
64
PM_All.doc
ValueSAP -
1.3.2. Order
1.3.2.1. Order Creation/Processing
Questions:
Q: 1) What different types of maintenance do you have in your company (for example,
preventive maintenance, repair, installation)? Create a list of the maintenance types and
outline the differences in planning and execution.
A:
Q: 2) Mark in the following list whether maintenance tasks are performed by employees
and/or contractors.
A:
Q: 3) What information about labor resources (for example, availability and number of
people, duration of work, split of operation) do you require from the system when planning
maintenance orders?
A:
A:
Q: 5) Do you want to be able to process related notification and order data collectively
in a single form?
A:
A: [ ]Yes
[ ]No
A:
Q: 8) Do you want to configure a special search help for partners in your order?
A:
Q: 9) For which operation types do you want to represent the operation description
using service specifications?
A:
Q: 10) Do you want to define skills and/or qualifications for maintenance order
operations?
A: [ ]Yes
65
PM_All.doc
ValueSAP -
[ ]No
Q: 11) Do you provide the technicians who perform the preventive maintenance with a
list of activities? If yes, how detailed are they?
A:
A: [ ]Yes
[ ]No
Q: 13) If yes, which of the following types of task lists do you require?
A:
Q: 14) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
Q: 15) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 16) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 17) Do you want to generate purchase requisitions and reservations when the order
is created?
A:
Q: 18) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Q: 20) How do you want to plan special tools, documents and so on, which are required
to execute maintenance activities?
A:
66
PM_All.doc
ValueSAP -
Q: 21) Do you use work order permits, for example, to manage working conditions or
safety matters?
A: [ ]Yes
[ ]No
Q: 22) At what intervals do you want to schedule work (for example, daily, weekly,
monthly)?
A:
A:
Q: 24) At which level do you plan work (for example, for a shift, crew, skill, qualification,
or an individual person and so on)?
A:
Q: 25) How detailed is your planning (for example, usage backlog, capacity evaluation,
capacity scheduling)?
A:
Q: 26) Should the capacity load, which was formed for all the capacity types of the PP
work centers, be reduced for the duration of a maintenance task planned in a work order?
A:
A:
Q: 28) Do you use maintenance orders for processing investment measures? If yes,
should the asset under construction be created automatically or manually?
A:
Q: 29) Do you want the maintenance order to be integrated with one of the following
Controlling components?
A:
1.3.2.2. Material Planning
Questions:
Q: 1) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
67
PM_All.doc
ValueSAP -
[ ]No
A:
Q: 3) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 4) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 5) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
A:
Questions:
A:
A:
68
PM_All.doc
ValueSAP -
A:
Questions:
A:
A:
Q: 3) Which different approval steps are required for your work clearance process?
Describe the concept or process flow of your approval process.
A:
A:
A:
A:
Questions:
Q: 1) Identify the internal papers that you require for the different people and order
types involved (for example, job ticket for employee, picking list).
A:
A:
Questions:
A:
A:
A:
A:
Questions:
A:
Q: 2) Do you want to change capacity/work centers for periods with overload? (If yes,
consider changing the work center/assignment/activity dates manually from the evaluation
reports.)
A:
Q: 3) Do you do short term capacity planning? (If yes, ensure the time horizon for the
capacity evalution reflects the appropriate time period. If no, ensure the time horizon for the
capacity evaluation reflects the appropriate time period.)
A:
A:
70
PM_All.doc
ValueSAP -
A:
A:
1.3.3.2. Capacity Dispatching and Leveling
Questions:
Q: 1) Do you process the overload on capacities/wk centers? (If yes, you could use the
capacity leveling functions- dispatching and deallocating).
A:
Q: 2) Do you prefer to use a graphical planning tool for capacity leveling? (If yes, use
the graphical capacity planning tool If no, consider using the tabular capacity planning tool.)
A:
A: [ ]Yes
[ ]No
Q: 4) When you split order operations, do you want the system to create capacity loads
automatically for individual people?
A:
A:
A:
1.3.4. Modification of Technical Systems
1.3.4.1. Installation, Dismantling and Modification of Equipment
Questions:
A:
A:
71
PM_All.doc
ValueSAP -
A:
A:
A:
A:
Q: 7) Do changes also have to be made to the system master during modification work?
A:
Questions:
A:
A:
A:
Q: 4) How will the consumption of these parts be recorded and who will post their
withdrawal in the system?
A:
Q: 5) How do you document materials that are ordered for specific work orders?
A:
Q: 6) How do you wish to document which materials were received specifically for a
work order?
A:
72
PM_All.doc
ValueSAP -
Q: 7) How much time elapses between the actual goods issue and its posting in the
system?
A:
A:
A:
Q: 10) Is stock posted to the receiving site? If so, which type of stock (stock in transit,
available stock, etc.)?
A:
Q: 11) Which documents are generated in conjunction with this posting and what
information do they contain?
A:
Questions:
A:
A:
A:
A:
Q: 5) Do you also want to confirm used material at the same time as the time
confirmation?
A:
73
PM_All.doc
ValueSAP -
Q: 6) Should the technical completion (for example, for breakdown times, causes of
damage, tasks and so on) be made at the same time as the time confirmation?
A:
A:
A: [ ]Yes
[ ]No
A:
A:
Q: 11) How many times per day do your employees enter their working time?
A:
Q: 12) Will you use a Plant Data Collection (PDC) system for your completion
confirmations?
A:
Q: 13) Do you enter the working times of contractors? If yes, how should the external
services be entered?
A:
1.3.6.1. Individual Time Confirmation
Questions:
A:
Q: 2) Do you differentiate the times entered according to other activitiy types (for
example, to distinguish between normal work hours and overtime)?
A:
A:
Q: 4) In what unit and with what accuracy do you want to enter services?
A:
Questions:
A:
A:
Questions:
Q: 1) In which systems do you track employee master data? Are wage rates only
maintained in the R/3 System or in other systems too?
A:
Q: 2) Do you use this data as a basis for indirect activity allocation to cost objects, cost
centers, inernal orders and so on?
A: [ ]Yes
[ ]No
Q: 3) Explain how such a time sheet is structured today and how it should be structured
in future (what information do you need on the time sheet?).
A:
Q: 4) Does everyone who records working time have a personal number in HR? (If not,
CATS is not supported.)
A: [ ]Yes
[ ]No
A:
A:
75
PM_All.doc
ValueSAP -
Q: 7) Are the labor costs calculated based on actual costs or standard rates?
A:
A:
Q: 9) Please explain the procedure, how employees in your company track and report
time today.
A:
A:
Q: 11) Are there special conditions for labor costs when employees work in different
countries or for different profit centers (for example, if an employee from the UK works on a
project in Germany)?
A:
A:
Q: 13) How do your employees enter trip costs? Are the trips linked to the recording of
working time? Describe in detail.
A:
A:
Q: 15) Identify the different categories of activity (activity types) that you use for
estimation, planning and settlement purposes?
A:
Q: 16) What are the various cost collectors, to which employees will charge time (for
example, cost centers, projects, internal orders)?
A:
Q: 17) Do sub-contractors and other third party labor sources have to enter work using
timesheets?
76
PM_All.doc
ValueSAP -
A:
Q: 18) Are these external services settled to a cost center or directly to the project?
A:
A:
Q: 20) How is the cost of overtime calculated? Do you have different types of overtime
(for example, time and a half, double time)?
A:
Q: 21) Do you track indirect labor hours, such as vacation, sickness, holiday...? If yes,
define the categories you require and their entry type.
A:
Q: 22) Which financial entries do you currently make for your labor distribution?
A:
Q: 23) How do employees record their working time (time, detail, medium/system)?
A:
Questions:
Q: 1) What is your current timesheet approval strategy for employees and external
services?
A:
Q: 2) Explain the permit procedure for working time or recording of activity allocation for
your employees.
A:
A:
Q: 4) How many employees does the person responsible for approval manage?
A:
Questions:
Q: 1) Do you want to transfer recorded activity allocations to Controlling using the time
sheet?
A: [ ]Yes
[ ]No
Q: 2) How often does this transfer take place (daily, weekly and so on)?
A:
Q: 3) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
Questions:
Q: 1) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
A:
Q: 3) Do you need an evaluation, do see the days on which personnel enter more than
a defined number of hours?
A:
Q: 4) Do you have to see the employee name in the documents for the receiving
component?
A:
Q: 5) Do different roles need to see different timesheet information? (If yes, create
report variants.)
A:
Questions:
A:
78
PM_All.doc
ValueSAP -
Questions:
Q: 1) Do you measure and record the current condition of your equipment in the system
(for example, temperature, pressure, operating time)? Describe the different measuring points
and counters that you require for the different pieces of equipment.
A:
A:
Questions:
A:
Questions:
A:
Questions:
A:
A:
Q: 3) How often and according to which rules do you want to settle orders ?
A:
A: [ ]Yes
[ ]No
79
PM_All.doc
ValueSAP -
Q: 5) Do you want to examine your cost elements for the settlement of orders in greater
detail?
A:
Questions:
Q: 1) Who decides whether the work is fully completed (business completion) and
when?
A:
A:
Questions:
Q: 1) Do you want to archive orders? If so, please provide a copy of your document
archiving policy. If this is not available, describe specific archiving requirements.
A:
Q: 2) How long do you want to retain orders in the system before they are archived?
A:
A:
Questions:
Q: 1) Do you create historical orders to keep track of maintenance work that has
already been completed?
A: [ ]Yes
[ ]No
Questions:
A:
Q: 2) Please describe in detail the different analyses/reports that you will use.
A:
80
PM_All.doc
ValueSAP -
Questions:
Q: 1) What different types of maintenance do you have in your company (for example,
preventive maintenance, repair, installation)? Create a list of the maintenance types and
outline the differences in planning and execution.
A:
A: [ ]Yes
[ ]No
A:
Q: 4) Mark in the following list whether maintenance tasks are performed by employees
and/or contractors.
A:
Q: 5) What information about labor resources (for example, availability and number of
people, duration of work, split of operation) do you require from the system when planning
maintenance orders?
A:
A:
Q: 7) Do you want to be able to process related notification and order data collectively
in a single form?
A:
A: [ ]Yes
[ ]No
A:
81
PM_All.doc
ValueSAP -
Q: 10) Do you want to configure a special search help for partners in your order?
A:
Q: 11) For which operation types do you want to represent the operation description
using service specifications?
A:
Q: 12) Do you want to define skills and/or qualifications for maintenance order
operations?
A: [ ]Yes
[ ]No
Q: 13) Do you provide the technicians who perform the preventive maintenance with a
list of activities? If yes, how detailed are they?
A:
A: [ ]Yes
[ ]No
Q: 15) If yes, which of the following types of task lists do you require?
A:
Q: 16) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
Q: 17) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 18) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 19) Do you want to generate purchase requisitions and reservations when the order
is created?
A:
Q: 20) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
82
PM_All.doc
ValueSAP -
A: [ ]Yes
[ ]No
A:
Q: 22) How do you want to plan special tools, documents and so on, which are required
to execute maintenance activities?
A:
Q: 23) Do you use work order permits, for example, to manage working conditions or
safety matters?
A: [ ]Yes
[ ]No
Q: 24) At what intervals do you want to schedule work (for example, daily, weekly,
monthly)?
A:
A:
Q: 26) At which level do you plan work (for example, for a shift, crew, skill, qualification,
or an individual person and so on)?
A:
Q: 27) How detailed is your planning (for example, usage backlog, capacity evaluation,
capacity scheduling)?
A:
Q: 28) Should the capacity load, which was formed for all the capacity types of the PP
work centers, be reduced for the duration of a maintenance task planned in a work order?
A:
A:
Questions:
83
PM_All.doc
ValueSAP -
Q: 1) Do you assign materials (spare parts) to work orders during the planning phase?
A: [ ]Yes
[ ]No
A:
Q: 3) Which rules do you use to determine material availability (for example, daily
requirements, individual requirements)?
A:
Q: 4) How do you want to plan materials that must be purchased during the planning
phase?
A:
Q: 5) Do you want to create purchase requisitions directly from the maintenance order
during the planning phase?
A: [ ]Yes
[ ]No
A:
Questions:
Q: 1) Do you consider permits in connection with orders, for example, with regard to
working conditions or safety aspects? If yes, describe your permit procedures.
A:
A:
Questions:
A:
84
PM_All.doc
ValueSAP -
A:
A:
Questions:
Q: 1) Identify the internal papers that you require for the different people and order
types involved (for example, job ticket for employee, picking list).
A:
A:
Questions:
A:
A:
A:
A:
Questions:
85
PM_All.doc
ValueSAP -
A:
Q: 2) Do you want to change capacity/work centers for periods with overload? (If yes,
consider changing the work center/assignment/activity dates manually from the evaluation
reports.)
A:
Q: 3) Do you do short term capacity planning? (If yes, ensure the time horizon for the
capacity evalution reflects the appropriate time period. If no, ensure the time horizon for the
capacity evaluation reflects the appropriate time period.)
A:
A:
A:
A:
1.4.2.2. Capacity Dispatching and Leveling
Questions:
Q: 1) Do you process the overload on capacities/wk centers? (If yes, you could use the
capacity leveling functions- dispatching and deallocating).
A:
Q: 2) Do you prefer to use a graphical planning tool for capacity leveling? (If yes, use
the graphical capacity planning tool If no, consider using the tabular capacity planning tool.)
A:
A: [ ]Yes
[ ]No
Q: 4) When you split order operations, do you want the system to create capacity loads
automatically for individual people?
A:
86
PM_All.doc
ValueSAP -
A:
A:
1.4.3. Goods Movements
1.4.3.1. Goods Issue for Refurbishment
Questions:
A:
Q: 2) Who approves the goods issue? (You could use workflow to handle this process.)
A:
A:
Q: 4) How much time elapses between the actual goods issue and its posting in the
system?
A:
A:
Q: 6) Which documents are generated in conjunction with this posting and what
information do they contain?
A:
Questions:
A:
A: [ ]Yes
[ ]No
Q: 3) Which goods receipt inspections (which may be triggered by the system) and
which inspection results (e.g. expiration date) are entered in the system?
87
PM_All.doc
ValueSAP -
A:
A:
Q: 5) Which information do you use as a basis for planning your goods receipts
(volume, weight, expected time requirements, etc.)?
A:
Q: 6) For which material types do you wish to record data at the time of goods receipt?
A:
Q: 7) Do you physically store the goods you have received into "stock in quality
inspection" at a different location than those posted to normal stock?
A: [ ]Yes
[ ]No
Q: 8) Do you allow every material to be stored at all storage locations? Please describe!
A:
A:
A:
Q: 11) If you use Warehouse Management, describe the stock put-away process (how
the goods are placed into storage).
A:
Q: 12) If a goods receipt quantity is assigned to a goods issue, do you want the person
who enters the goods receipt to receive a corresponding message?
A:
Q: 13) Will you inspect the material/article at the time of goods receipt? If so, do you
enter the goods receipt and the inspection result or do you only enter the goods receipt after
the inspection has been carried out?
A: [ ]Yes
[ ]No
88
PM_All.doc
ValueSAP -
Q: 14) If you are using batch management, how is the batch number determined at the
time of goods receipt?
A:
Q: 15) Do you classify the batches at the time of goods receipt? Please specify the
criteria.
A:
A:
Q: 17) Do you wish to print out the material document as evidence of a goods
movement? Which information should be included in the printout?
A:
Questions:
A:
A:
A:
A:
Q: 5) Do you also want to confirm used material at the same time as the time
confirmation?
A:
Q: 6) Should the technical completion (for example, for breakdown times, causes of
damage, tasks and so on) be made at the same time as the time confirmation?
A:
89
PM_All.doc
ValueSAP -
A:
A: [ ]Yes
[ ]No
A:
A:
Q: 11) How many times per day do your employees enter their working time?
A:
Q: 12) Will you use a Plant Data Collection (PDC) system for your completion
confirmations?
A:
Q: 13) Do you enter the working times of contractors? If yes, how should the external
services be entered?
A:
1.4.4.1. Individual Time Confirmation
Questions:
A:
Q: 2) Do you differentiate the times entered according to other activitiy types (for
example, to distinguish between normal work hours and overtime)?
A:
A:
Q: 4) In what unit and with what accuracy do you want to enter services?
90
PM_All.doc
ValueSAP -
A:
Questions:
A:
A:
Questions:
Q: 1) In which systems do you track employee master data? Are wage rates only
maintained in the R/3 System or in other systems too?
A:
Q: 2) Do you use this data as a basis for indirect activity allocation to cost objects, cost
centers, inernal orders and so on?
A: [ ]Yes
[ ]No
Q: 3) Explain how such a time sheet is structured today and how it should be structured
in future (what information do you need on the time sheet?).
A:
Q: 4) Does everyone who records working time have a personal number in HR? (If not,
CATS is not supported.)
A: [ ]Yes
[ ]No
A:
A:
Q: 7) Are the labor costs calculated based on actual costs or standard rates?
A:
91
PM_All.doc
ValueSAP -
A:
Q: 9) Please explain the procedure, how employees in your company track and report
time today.
A:
A:
Q: 11) Are there special conditions for labor costs when employees work in different
countries or for different profit centers (for example, if an employee from the UK works on a
project in Germany)?
A:
A:
Q: 13) How do your employees enter trip costs? Are the trips linked to the recording of
working time? Describe in detail.
A:
A:
Q: 15) Identify the different categories of activity (activity types) that you use for
estimation, planning and settlement purposes?
A:
Q: 16) What are the various cost collectors, to which employees will charge time (for
example, cost centers, projects, internal orders)?
A:
Q: 17) Do sub-contractors and other third party labor sources have to enter work using
timesheets?
A:
Q: 18) Are these external services settled to a cost center or directly to the project?
A:
92
PM_All.doc
ValueSAP -
A:
Q: 20) How is the cost of overtime calculated? Do you have different types of overtime
(for example, time and a half, double time)?
A:
Q: 21) Do you track indirect labor hours, such as vacation, sickness, holiday...? If yes,
define the categories you require and their entry type.
A:
Q: 22) Which financial entries do you currently make for your labor distribution?
A:
Q: 23) How do employees record their working time (time, detail, medium/system)?
A:
Questions:
Q: 1) What is your current timesheet approval strategy for employees and external
services?
A:
Q: 2) Explain the permit procedure for working time or recording of activity allocation for
your employees.
A:
A:
Q: 4) How many employees does the person responsible for approval manage?
A:
Questions:
Q: 1) Do you want to transfer recorded activity allocations to Controlling using the time
sheet?
93
PM_All.doc
ValueSAP -
A: [ ]Yes
[ ]No
Q: 2) How often does this transfer take place (daily, weekly and so on)?
A:
Q: 3) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
Questions:
Q: 1) Which time sheet-based reports do you require (for example, employee utilization,
employee hours by cost center)?
A:
A:
Q: 3) Do you need an evaluation, do see the days on which personnel enter more than
a defined number of hours?
A:
Q: 4) Do you have to see the employee name in the documents for the receiving
component?
A:
Q: 5) Do different roles need to see different timesheet information? (If yes, create
report variants.)
A:
Questions:
A:
Questions:
94
PM_All.doc
ValueSAP -
Q: 1) Do you record technical information (for example, which part of the equipment
was broken, damage, cause of damage) about a maintanence problem in order to create a
service history or to enable further evaluations?
A: [ ]Yes
[ ]No
A:
A:
A:
Questions:
Q: 1) Do you measure and record the current condition of your equipment in the system
(for example, temperature, pressure, operating time)? Describe the different measuring points
and counters that you require for the different pieces of equipment.
A:
A:
Questions:
A:
Questions:
A:
95
PM_All.doc
ValueSAP -
Questions:
A:
A:
Q: 3) How often and according to which rules do you want to settle orders ?
A:
A:
A: [ ]Yes
[ ]No
Q: 6) Do you want to examine your cost elements for the settlement of orders in greater
detail?
A:
Questions:
Q: 1) Who decides whether the work is fully completed (business completion) and
when?
A:
A:
Questions:
Q: 1) Do you want to archive orders? If so, please provide a copy of your document
archiving policy. If this is not available, describe specific archiving requirements.
A:
Q: 2) How long do you want to retain orders in the system before they are archived?
A:
96
PM_All.doc
ValueSAP -
A:
Questions:
Q: 1) Do you create historical orders to keep track of maintenance work that has
already been completed?
A: [ ]Yes
[ ]No
Questions:
A:
Q: 2) Please describe in detail the different analyses/reports that you will use.
A:
97
PM_All.doc